Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 Bookmarks
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

FmT LIVE - Follow my Trip with me... LIVE

हमसे सीखे कोई जीने का सलीका। सफर कैसा भी हो, मौज़ उडाये जाते हैं।। - Amir

Search Trains
Post PNR
Medium; Side View; Large TB; EOG/SLR; Outside of Train;
Entry# 4963234-0
no description available
Entry# 4974738-0


Availability Calendar
Search LPI to TPTY
Return# 02733
PDF Download

02734/Narayanadri Festival Special
నారాయణాద్రి పండుగ స్పెషల్     नारायणाद्री त्योहार विशेष

LPI/Lingampalli --> TPTY/Tirupati

Updated: Aug 23 (21:59) by bh4rtiy4r4il^
Aug 23 (21:59)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between LPI and TPTY is 18 km (3%) shorter.
Travel Time: 12h 30m     20 halts
Distance: 685 km     Avg Speed: 55 km/hr
Max Permissible Speed: 110 km/hr between CHZ/Charlapalli and RU/Renigunta Junction
Departs @ 17:25
Lingampalli/LPI 
Platform# 4
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 05:55 +1 night
TPTY/Tirupati 
Platform# 5
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: COV-Reserved
Rake Zone: SCR/South Central
Latest News
(You need to double-check/verify this info yourself)
📢⚟ JCF 27/08/2021 DL1 Would Act As UR Coach
Mon Aug 23, 2021 (10:11PM)
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
u/r coach - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✕ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
DL1
  2
 D2
  3
 S1
  4
 S2
  5
 S3
  6
 S4
  7
 S5
  8
 S6
  9
 S7
 18
 B7
 17
 B6
 16
 B5
 15
 B4
 14
 B3
 13
 B2
 12
 B1
 11
 S9
 10
 S8
 19
 A1
 20
HA1
 21
 D1
 22
EOG
RSA - Rake Sharing
No RSA - Two Dedicated Rakes with PM at TPTY

Show ALL intermediate Stations

Time-Table has Changed. Show Changes
Source Station Changed.
20 halts. 116 intermediate Stations between Lingampalli and Tirupati
#1
0.0 km
/==/
Zone: SCR
PF# 4
Speed: 55
Elev: 561m

17:25
Day: 1
18.2 km
9 intermediate stations
00:20
#2
18.2 km
/==/
Zone: SCR
PF# 1
Speed: 15
17:45
17:46
Day: 1
4.9 km
3 intermediate stations
00:19
#3
23.1 km
/==/
Zone: SCR
PF# 2
Speed: 68
Elev: 539m
18:05
18:10
Day: 1
33.1 km
5 intermediate stations
00:29
#4
56.2 km
/==/
Zone: SCR
PF# 2
Speed: 81
Elev: 447m
18:39
18:40
Day: 1
76.7 km
9 intermediate stations
00:57
#5
132.9 km
/--/
Zone: SCR
PF# 1
Speed: 87
Elev: 226m
19:37
19:38
Day: 1
37.6 km
3 intermediate stations
00:26
#6
170.6 km
/--/
Zone: SCR
PF# 1
Speed: 80
Elev: 153m
20:04
20:05
Day: 1
38.4 km
5 intermediate stations
00:29
#7
209.0 km
/--/
Zone: SCR
Speed: 67
20:34
20:35
Day: 1
21.4 km
2 intermediate stations
00:19
#8
230.4 km
/--/
Zone: SCR
PF# 2
Speed: 70
20:54
20:55
Day: 1
31.5 km
6 intermediate stations
00:27
#9
261.8 km
/--/
Zone: SCR
Speed: 31
21:22
21:23
Day: 1
42.4 km
7 intermediate stations
01:22
#10
304.3 km
/==/
Zone: SCR
PF# 1
Speed: 32
22:45
22:55
Day: 1
Remote Location Quota Starting and Charting Station.
25.6 km
4 intermediate stations
00:48
#11
329.9 km
/==/
Zone: SCR
PF# 3
Speed: 77
23:43
23:45
Day: 1
42.5 km
6 intermediate stations
00:33
#12
372.4 km
/==/
Zone: SCR
PF# 2
Speed: 70
Elev: 10m
00:18
00:20
Day: 2
15.1 km
3 intermediate stations
00:13
#13
387.5 km
/==/
Zone: SCR
PF# 2
Speed: 78
Elev: 8m
00:33
00:35
Day: 2
49.4 km
9 intermediate stations
00:38
#14
436.9 km
/==/
Zone: SCR
PF# 2,3
Speed: 94
Elev: 12m
01:13
01:15
Day: 2
28.1 km
2 intermediate stations
00:18
#15
465.0 km
/==/
Zone: SCR
PF# 2
Speed: 81
Elev: 25m
01:33
01:35
Day: 2
Xing with 02621/Tamil Nadu Special | Daily
Xing with 12621/Tamil Nadu Express | Daily
37.9 km
2 intermediate stations
00:28
#16
502.8 km
/==/
Zone: SCR
PF# 2
Speed: 80
Elev: 21m
02:03
02:05
Day: 2
50.8 km
6 intermediate stations
00:38
#17
553.6 km
/==/
Zone: SCR
PF# 3
Speed: 40
Elev: 21m
02:43
02:45
Day: 2
38.4 km
5 intermediate stations
00:58
#18
592.0 km
/==/
Zone: SCR
PF# 1
Speed: 56
Elev: 19m
03:43
03:45
Day: 2
35.7 km
3 intermediate stations
00:38
#19
627.7 km
/==/
Zone: SCR
PF# 2
Speed: 73
Elev: 75m
04:23
04:24
Day: 2
24.5 km
3 intermediate stations
00:20
#20
652.2 km
/==/
Zone: SCR
PF# 1
Speed: 42
Elev: 70m
04:44
04:45
Day: 2
23.2 km
3 intermediate stations
00:33
#21
675.4 km
/==/
Zone: SCR
PF# 2
Speed: 17
Elev: 115m
05:18
05:20
Day: 2
Xing with 02625/Kerala Special | Daily
9.8 km
1 intermediate stations
00:35
#22
685.2 km
/==/
Zone: SCR
PF# 5

Elev: 151m
05:55

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy