Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Just PNR - Post PNRs, Predict PNRs, Stats, ...

DC Line - ये आग का दरिया पार कर पाना नहीं था आसान ...पर धनबादवासियों के इरादे हैं चट्टान.... चलाकर रहेंगे इसपर रेल गाड़ी महान... - Niket Karan

Search Trains
Post PNR
Large TB;
Entry# 2108567-0
Medium; Side View; Small TB; 3 AC; Outside of Train; Standing;
Entry# 2982243-0


Availability Calendar
Search HTE to ERS
Return# 22838
PDF Download

22837/Dharti Aaba AC SF Express (PT)
  ധർത്തി ആബാ ശീതീകരിച്ച സൂപ്പർഫാസ്റ്റ് എക്സ്പ്രസ്     धरती आबा वातानुकूलित सुपरफास्ट एक्सप्रेस

HTE/Hatia --> ERS/Ernakulam Junction (South)

Updated: Nov 16 2021 (08:19) by TC4D^~
Nov 16 2021 (08:19)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between HTE and ERS is 38 km (2%) shorter.
Travel Time: 39h 20m     25 halts
Distance: 2245 km     Avg Speed: 57 km/hr
Max Permissible Speed: 110 km/hr between DVD/Duvvada and EE/Eluru
Departs @ 18:25
Hatia/HTE 
Platform# 1
 
Mon
 
 
 
 
 
Arrives @ 09:45 +2 nights
ERS/Ernakulam Jn 
Platform# 3
 
 
 
Wed
 
 
 
Type: AC SuperFast
Rake Zone: SER/South Eastern
Latest News
(You need to double-check/verify this info yourself)
Permanent augmented with 2 AC -3 tier coach Wef 28/03/22
Wed Mar 23, 2022 (05:00PM)
News History
Coach Composition : 3AC — 10, PC — 1 & EOG — 2
Tue Jun 22, 2021 (11:41PM)
0 Follows
Rating: 4.6/5 (46 votes)
cleanliness - excellent (8)
punctuality - excellent (8)
food - good (7)
ticket avbl - good (8)
railfanning - excellent (7)
safety - excellent (8)
Inaugural Run
Thu Oct 27, 2016
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
B13
  3
B12
  4
B11
  5
B10
  6
 B9
  7
 B8
  8
 B7
  9
 PC
VSKP
 16
EOG
 15
 B1
 14
 B2
 13
 B3
 12
 B4
 11
 B5
 10
 B6
RSA - Rake Sharing
No RSA. Single Dedicated Rake with PM @ HTE, SM @ ERS.
Loco/Rake Reversals
VSKP/Visakhapatnam Junction

Show ALL intermediate Stations

Time-Table has Changed. Show Changes
Departure Time Changed. Arrival Time Changed. Speeded up by: 1h 20m.
25 halts. 355 intermediate Stations between Hatia and Ernakulam Junction (South)
#1
0.0 km
%==%
Zone: SER
PF# 1
Speed: 64
Elev: 655m

18:25
Day: 1
164.5 km
27 intermediate stations
02:35
#2
164.5 km
/==/
Zone: SER
PF# 2
Speed: 71
21:00
21:05
Day: 1
Xing with 12129/Azad Hind Express | Mon
101.1 km
15 intermediate stations
01:25
#3
265.7 km
/==/
Zone: SER
Speed: 58
22:30
22:35
Day: 1
48.7 km
7 intermediate stations
00:50
#4
314.3 km
/==/
Zone: ECoR
Speed: 61
Elev: 160m
23:25
23:35
Day: 1
42.4 km
4 intermediate stations
00:42
#5
356.8 km
/==/
Zone: ECoR
Speed: 82
Elev: 184m
00:17
00:19
Day: 2
76.3 km
5 intermediate stations
00:56
#6
433.0 km
/==/
Zone: ECoR
Speed: 63
01:15
01:20
Day: 2
63.3 km
4 intermediate stations
01:00
#7
496.4 km
%==%
Zone: ECoR
Speed: 60
Elev: 213m
02:20
02:30
Day: 2
13.1 km
0 intermediate stations
00:13
#8
509.4 km
/==/
Zone: ECoR
Speed: 64
Elev: 186m
02:43
02:45
Day: 2
73.0 km
6 intermediate stations
01:08
#9
582.4 km
/==/
Zone: ECoR
Speed: 39
Elev: 360m
03:53
03:55
Day: 2
54.6 km
5 intermediate stations
01:25
#10
637.0 km
/==/
Zone: ECoR
PF# 1
Speed: 70
Elev: 228m
05:20
05:25
Day: 2
46.8 km
5 intermediate stations
00:40
#11
683.9 km
/==/
Zone: ECoR
PF# 3
Speed: 69
Elev: 122m
06:05
06:07
Day: 2
78.3 km
9 intermediate stations
01:08
#12
762.1 km
/==/
Zone: ECoR
Speed: 49
07:15
07:20
Day: 2
61.1 km
10 intermediate stations
01:15
#13
823.3 km
/==/
Zone: ECoR
PF# 7
Speed: 73
08:35
08:55
Day: 2
Loco Reversal (rake reversal - the train reverses direction)
150.5 km
25 intermediate stations
02:04
#14
973.8 km
/==/
Zone: SCR
Speed: 63
Elev: 17m
10:59
11:00
Day: 2
50.1 km
9 intermediate stations
00:48
#15
1023.9 km
/==/
Zone: SCR
PF# 1,2
Speed: 72
Elev: 23m
11:48
11:50
Day: 2
89.3 km
17 intermediate stations
01:14
#16
1113.2 km
/==/
Zone: SCR
PF# 3
Speed: 40
13:04
13:05
Day: 2
59.6 km
12 intermediate stations
01:30
#17
1172.8 km
/==/
Zone: SCR
PF# 7
Speed: 70
14:35
14:45
Day: 2
Remote Location Starting and Charting Station.
138.5 km
28 intermediate stations
01:58
#18
1311.4 km
/==/
Zone: SCR
PF# 3
Speed: 84
Elev: 12m
16:43
16:45
Day: 2
116.7 km
12 intermediate stations
01:23
#19
1428.1 km
/==/
Zone: SCR
PF# 3
Speed: 62
Elev: 21m
18:08
18:10
Day: 2
121.8 km
17 intermediate stations
01:58
#20
1549.8 km
/==/
Zone: SCR
Speed: 52
Elev: 115m
20:08
20:10
Day: 2
124.8 km
23 intermediate stations
02:10
#21
1674.6 km
/==/
Zone: SR
PF# 1
Speed: 65
Elev: 215m
22:20
22:25
Day: 2
84.5 km
12 intermediate stations
01:18
#22
1759.1 km
/==/
Zone: SR
Speed: 75
Elev: 404m
23:43
23:45
Day: 2
120.5 km
18 intermediate stations
01:37
#23
1879.6 km
/==/
Zone: SR
Speed: 65
Elev: 284m
01:22
01:25
Day: 3
59.7 km
8 intermediate stations
00:55
#24
1939.3 km
/==/
Zone: SR
PF# 2
Speed: 59
Elev: 174m
02:20
02:25
Day: 3
100.8 km
15 intermediate stations
01:42
#25
2040.0 km
/==/
Zone: SR
PF# 2
Speed: 29
Elev: 416m
04:07
04:10
Day: 3
55.7 km
7 intermediate stations
01:55
#26
2095.7 km
/==/
Zone: SR
PF# 1
Speed: 43
Elev: 81m
06:05
06:15
Day: 3
149.4 km
30 intermediate stations
03:30
#27
2245.2 km
/==/
Zone: SR
PF# 3

09:45

Day: 3
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy