Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

संपूर्ण क्रान्ति है तो जहां है

Search Trains
Post PNR




no description available
Entry# 6131785-0
no description available
Entry# 6141434-0
no description available
Entry# 6152941-0
Availability Calendar
Search UBL to YPR
Return# 20655
PDF Download

16544⇒20656/SSS Hubballi - Yesvantpur Weekly SF Express
श्री सिद्धारूढ़ा स्वामीजी हुब्बल्लि - यशवंतपुर साप्ताहिक सुपरफास्ट एक्सप्रेस

UBL/SSS Hubballi Junction (Hubli) --> YPR/Yesvantpur Junction

Updated: Jul 30 (17:47) by SatavahanaSFExp^
Jul 30 (17:47)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips


Other Trains in the News
This is the Shortest Route between UBL and YPR.
Travel Time: 8h 20m     6 halts
Distance: 464 km     Avg Speed: 56 km/hr
Max Permissible Speed: 110 km/hr
Departs @ 11:00
SSS Hubballi Junction (Hubli)/UBL 
Platform# 3,4,5
 
 
 
 
 
 
Sat
Arrives @ 19:20
YPR/Yesvantpur Jn 
Platform# --
 
 
 
 
 
 
Sat
Type: SuperFast
Rake Zone: SWR/South Western
Latest News
(You need to double-check/verify this info yourself)
🔹 Train No. 20656 SSS Hubballi – Yesvantpur Weekly Express, starting from SSS Hubballi o­n March 25 & April 1, 2023 will be diverted to run via SSS Hubballi, Hosapete bypass, Kotturu, Amaravathi Colony & Davangere, skipping stoppages at Haveri & Harihar stations.
Wed Mar 22, 2023 (10:29AM)
News History
Restored to run in scheduled route JCO o­n March 18, 2023
Wed Mar 15, 2023 (11:58AM)
Train No. 20656 SSS Hubballi – Yesvantpur Weekly Express starting from SSS Hubballi o­n March 18, 2023 will be diverted to run via SSS Hubballi, Hosapete by-pass, Kotturu, Amaravathi Colony & Davangere, skipping stoppages at SMM Haveri & Harihar.
Tue Mar 14, 2023 (07:06AM)
🔹Train No. 20656 SSS Hubballi – Yesvantpur Weekly Express, starting from SSS Hubballi o­n March 11, 2023 will be diverted to run via SSS Hubballi, Hosapete by-pass, Kotturu, Amaravathi Colony & Davangere, skipping stoppages at SMM Haveri & Harihar.
Fri Mar 10, 2023 (06:33PM)
• JCO 04.03.2023 will be diverted to run via - SSS Hubballi, Gadag, Hosapete bypass, Kotturu, Amaravathi Colony, and Davangere skipping stoppages at SMM Haveri & Harihar due to engineering works related to doubling of Chikjajur - Hubballi section over SWR.
Wed Mar 01, 2023 (02:26PM)
• JCO 04.02.2023 will be diverted via - SSS Hubballi, Gadag, Hosapete bypass, Kotturu, Amaravathi Colony, and Davangere due to engineering works for commissioning of Kundgol phase I work as part of doubling of Chikjajur - Hubballi section over SWR.
Thu Jan 26, 2023 (09:26PM)
Will run as a Superfast Express w.e.f. 6 August 2022 ex. SSS Hubballi with the same number. New number 20656 will come in effect from 19 November 2022.
Wed Jul 20, 2022 (09:31PM)
B4 & B5 act as C1 & C2 (CC Class)
Sat Apr 02, 2022 (11:21AM)
1 Follows
Rating: 4.1/5 (11 votes)
cleanliness - excellent (2)
punctuality - average (3)
food - n/a (0)
ticket avbl - excellent (2)
u/r coach - excellent (2)
railfanning - good (2)
safety - excellent (2)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sat Jun 02, 2018
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✓ E-Catering
E-Catering is Available at UBL, HVR, HRR, DVG & YPR.
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 UR
  3
 UR
  4
 A2
  5
 A1
  6
 B6
  7
 B5
  8
 B4
  9
 B3
 18
 S1
 17
 S2
 16
 S3
 15
 S4
 14
 S5
 13
 S6
 12
 S7
 11
 B1
 10
 B2
 19
 UR
 20
 UR
 21
EOG
RSA - Rake Sharing
16587/16588 (Sunday Rake);🔹PM @YPR🔹




Show ALL intermediate Stations

6 halts. 65 intermediate Stations between SSS Hubballi Junction (Hubli) and Yesvantpur Junction
#1
0.0 km
/==/
Zone: SWR
PF# 3,4,5
Speed: 49
Elev: 627m

11:00
Day: 1
75.2 km
9 intermediate stations
01:33
#2
75.2 km
/==/
Zone: SWR
PF# 2
Speed: 63
Elev: 553m
12:33
12:35
Day: 1
55.8 km
5 intermediate stations
00:53
#3
131.0 km
/==/
Zone: SWR
PF# 1
Speed: 51
Elev: 545m
13:28
13:30
Day: 1
12.8 km
1 intermediate stations
00:15
#4
143.8 km
/==/
Zone: SWR
PF# 2
Speed: 78
Elev: 584m
13:45
13:47
Day: 1
160.1 km
19 intermediate stations
02:03
#5
304.0 km
/==/
Zone: SWR
PF# 1
Speed: 76
Elev: 803m
15:50
15:53
Day: 1
46.6 km
7 intermediate stations
00:37
#6
350.6 km
/==/
Zone: SWR
Speed: 61
16:30
16:31
Day: 1
Experimental halt for 6 months W.E.F. 09/09/2023 to 02/03/2024.
49.7 km
6 intermediate stations
00:49
#7
400.3 km
/==/
Zone: SWR
PF# 2
Speed: 32
Elev: 819m
17:20
17:22
Day: 1
63.8 km
12 intermediate stations
01:58
#8
464.1 km
/==/
Zone: SWR

Elev: 915m
19:20

Day: 1


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy