This newly upgraded loco is undergoing trials with Purushottam Express.
366 29-Sep-18 12802 Dir 166 ECoR KUR 30136 GZB WAP5 3-Phase DOC, GZB, Jun 9 2018 / IA, GZB, Sep 7 2018 Aux. converter IGBT (BUR) (NDLS-PURI/Load-24B), After starting Ex.Bhubaneswar (BBS) station, VCB tripped with "Dis.in processor BUR-3" followed by "Fetal error in main circuit". Put MCE off/on but not succeed. R/engine given. DOC-09.06.18, IA-07.09.18, Major/Sec-BBS-PURI, Minor/Sec-Bhubaneswar-Raetang (BBS-RTN), Time-05.10-07.40 hrs. Loco at PURI Station. IGBT loco, SR-BT, BUR-AAL. 0 Loco