Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

For a RailFan, watching MPS skips are far more interesting than watching F1 race - Prince Maan

Search Forum
Post PNR
Availability Calendar
Search AYC to BBK
Return# 04204
PDF Download

04203/Ayodhya Cantt - Lucknow MEMU Express Special
अयोध्या छावनी - लखनऊ मेमू एक्सप्रेस विशेष

AYC/Ayodhya Cantt. Junction --> BBK/Barabanki Junction

Updated: Jan 24 (10:44) by PrakharYadav^~
Jan 24 (10:44)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    28 blog entries  <<prev  next>>
General Travel
7751 views
0

Nov 17 2023 (11:59)   04204/Lucknow - Ayodhya Cantt MEMU | LKO/Lucknow Charbagh NR (9 PFs)
adarsh.railways
adarsh.railways   19 blog posts
Entry# 5884789            Tags   Past Edits
Coupling
Translate to English
Translate to Hindi
Info Update
42635 views
4

Nov 11 2023 (10:40)   04203/Ayodhya Cantt - Lucknow MEMU Express Special | SLRP/Salarpur (2 PFs)
PrakharYadav^~
PrakharYadav^~   13421 blog posts
Entry# 5878311            Tags   Past Edits
2 compliments
Useful Useful
The competent authority has approved BNI/NI (Yard remodeling) SALARPUR (SLRP) station of BBK-AYC-ABP-ZBD section over LKO Division/NR.
Details of BNI/NI are as under:-

SALARPUR (SLRP) station of BBK-AYC-ABP-ZBD section | 20/11/23 to 27/11/23 = 08 Days | (D-8 to D-1) 28/11/23 to 30/11/23 = 03 Days (D-Day to D+2) | 11 days
...
more...

Repercussions of coaching trains are as mentioned

Freight and other trains repercussions:- Freight trains will be regulated/Diverted accordingly.
No Special train should be planned via BBK-AYC section during BNI/NI.

Note:
1. Tentative block margin is from 08:30 onwards, so that block should be offered at 07:30 hrs. as block may be provided early or accordingly considering late running trains if any.

2. Train no. 22549, 14206, 12226, 13151, 19054, 14018, 18104, 04652, 14854, 15116 will remain monitored trains during BNI/NI for RT starting of Block.

3. Existing L. no. 2 will be surrendered 5 days before (D-13, 15/11/23 ), so that from 15/11/23 to till commissioning, Only Existing L. no. 1 will be available for train operation, due to which station will remain nonxing, crossings will be arranged at adjacent stations i.e. SLW or AYC suitably.

4. From D-15 to D-9 (7 days PRE BNI) (PRE BNI period 13/11/23 to 19/11/23) blocks of 3 Hrs. (Tentative Margin- 11:10-14:10= 03:00 HRs. will be provided on regulation of trains and as per margin available on day to day basis (Trains to be monitored- 13010, 13307, 15934, 13484, 13238).

Translate to English
Translate to Hindi
0
updating ...
7 wishes
शुभ यात्रा Happy Journey brother 🎉 Happy Journey Happy Journey 😀 உங்கள் பயணம் இனிதே அமைய வாழ்த்துக்கள் Happy Journey शुभ यात्रा
Diwali Vacations. Upgraded in 2A

148 Posts

FmtBlog
8866 views
0

Nov 04 2023 (09:38)
Kumaon_Tiger^~
Kumaon_Tiger^~   40378 blog posts
Re# 5870673-149            Tags  

7 pics

@BBK 1 km <--> 7 km @JBR   19m late
@BBK: Barabanki Jn &25 km/h #04203: Ayodhya Cantt Lucknow Express Special
Translate to English
Translate to Hindi

More Posts
time for doing more RF.

5 Posts

FmtBlog
7405 views
0

Aug 12 2023 (17:07)
ArmyRF^~
ArmyRF^~   8019 blog posts
Re# 5796701-6            Tags  

More Posts
General Travel
262900 views
1

Apr 11 2023 (08:46)   04204/Lucknow - Ayodhya Cantt MEMU | RDL/Rudauli (2 PFs)
harshityadav~
harshityadav~   1323 blog posts
Entry# 5691113            Tags   Past Edits
Crs inspection done between rudauli and sohawal. Admin please mark the section as double.
Source - drm nr lko Twitter.
Translate to English
Translate to Hindi

12188 views
0

Apr 11 2023 (08:52)
harshityadav~
harshityadav~   1323 blog posts
Re# 5691113-1              
Now 105km out of 237km long Barabanki Jaunpur section has been doubled and commissioned.
Last year at this time Diesel trains ruled this section as even electrification wasn't done.

That's some seriously fast work ....
Translate to English
Translate to Hindi
Page#    28 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy