Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Kolkata Local - আমি তোমাকে ভালবাসি

IRI is in Maintenance Mode. Blog Postings and other site edits will not work for about 5 minutes.
Search Forum
Post PNR
Medium; Side View; EOG/SLR; Outside of Train; Standing at Station;
Entry# 4587480-0
Large TB;
Entry# 5350248-0


Availability Calendar
Search ST to CPR
Return# 19046
PDF Download

12945⇒19045/Tapti Ganga Express (PT)
ताप्ती गंगा एक्सप्रेस

ST/Surat --> CPR/Chhapra Junction

Updated: Apr 21 (21:03) by GujratMail^~
Apr 21 (21:03)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    780 blog entries  <<prev  next>>
Rail Fanning
143046 views
12

★★
Jul 21 2023 (22:53)   19046/Tapti Ganga Express (PT) | SHG/Shahganj Junction (4 PFs) | ET/WDM-3D/11462
dsourav895~
dsourav895~   729 blog posts
Entry# 5780917            Tags   Past Edits
1 compliments
Great:Awesome
Looking back at the diesel days of Tapti Ganga !

Itarsi (ET) WDM 3D twins led by 11462 making their way through unwired jurisdiction of NER & lush greenery with 19046 Chhapra - Surat Tapti Ganga Express.
Translate to English
Translate to Hindi

90026 views
0

Jul 25 2023 (10:13)
PankajMishra^~
PankajMishra^~   59101 blog posts
Re# 5780917-1              
Is this pics Belongs to you or third party Pics ?
Translate to English
Translate to Hindi

84408 views
0

Aug 06 2023 (22:55)
dsourav895~
dsourav895~   729 blog posts
Re# 5780917-2              
Why such a question is coming at the first place ? Should have referred to my earlier posts ! Picture is mine and I never upload any 3rd picture.
Translate to English
Translate to Hindi

74116 views
0

Nov 12 2023 (01:43)
Padmakant   11004 blog posts
Re# 5780917-3               Past Edits
Is This Section Still Not Electrified
Translate to English
Translate to Hindi

65741 views
0

Nov 12 2023 (06:13)
harshityadav~
harshityadav~   1286 blog posts
Re# 5780917-4              
This section is electrified double now.
Translate to English
Translate to Hindi
0
updating ...
5 wishes
शुभ यात्रा Forever MPS Happy Journey Forever MPS Happy Journey
very late running Danapur yet to reach DDUv

26 Posts

FmtBlog
90258 views
3

Oct 19 2023 (06:57)
PankajMishra^~
PankajMishra^~   59101 blog posts
Re# 5856112-27            Tags  
1 km from @LKJN   n/a
@LKJN: Link Jn Cabin &0 km/h #19045: Tapti Ganga Express also coming
Translate to English
Translate to Hindi

39 Posts

FmtBlog
85676 views
0

Oct 19 2023 (20:30)
PankajMishra^~
PankajMishra^~   59101 blog posts
Re# 5856112-67            Tags  
@BSL   4h 35m late
@BSL: Bhusaval Jn &1 km/h #19046: Tapti Ganga Express On pF 3
Translate to English
Translate to Hindi

3 Posts

FmtBlog
68635 views
0

Oct 19 2023 (21:15)
PankajMishra^~
PankajMishra^~   59101 blog posts
Re# 5856112-71            Tags  
@TRW 5 km <--> 3 km @JL   4h 52m late
@JL: Jalgaon Jn &0 km/h Just Departed #19006: Bhusaval Surat Express then #19046: Tapti Ganga Express on Outer and we standing one block behind
Translate to English
Translate to Hindi

More Posts
Info Update
691495 views
4

Oct 16 2023 (13:26)   11055/Godan Express (PT) | MYR/Maihar (3 PFs)
PrakharYadav^~
PrakharYadav^~   12744 blog posts
Entry# 5853966            Tags   Past Edits
1 compliments
Useful
WCR has notified to provide temporary stoppage to the following trains at “Maihar station” from 15.10.2023 to 28.10.2023

#TemporaryStops2023
Translate to English
Translate to Hindi
Info Update
277071 views
0

Aug 26 2023 (22:35)   09186/Kanpur Anwarganj - Mumbai Central Special Fare SF Summer Special | CPA/Kanpur Anwarganj (3 PFs)
PrakharYadav^~
PrakharYadav^~   12744 blog posts
Entry# 5807013            Tags   Past Edits
रेलगाड़ियों का निरस्तीकरण एवम आंशिक निरस्तीकरण/ओरिजिनेशन

रेल प्रशासन द्वारा सर्वसाधारण को सूचित किया जाता है की मुंबई सेंट्रल मंडल में उधना सूरत के मध्य तीसरी लाइन के कार्य हेतु उधना यार्ड में हो रहे नॉन इंटरलॉकिंग कार्य के कारण निम्न गाड़ियों का निरस्तीकरण एवम आंशिक निरस्तीकरण/ओरिजिनेशन का निर्णय लिया गया है, जिसका विवरण निम्नवत हैं।

...
more...

Translate to English
Translate to Hindi
0
updating ...
3 wishes
Happy Journey ನಿಮ್ಮ ಪ್ರಯಾಣ ಸುಖಕರವಾಗಿರಲಿ உங்கள் பயணம் இனிதே அமைய வாழ்த்துக்கள்
JYOTIRLINGA SPECIAL TRIPS. DAY 3... PART 2 /3 **....... VARANASI TO JABALPUR...... 11072 + 15205 ............

67 Posts

FmtBlog
54925 views
1

Aug 09 2023 (00:19)
DreamTrip22503^~
DreamTrip22503^~   40056 blog posts
Re# 5793125-68            Tags  
@STA   n/a
@STA: Satna Jn &0 km/h #19046: Tapti Ganga Express Arrival done now on PF no 1
Translate to English
Translate to Hindi

More Posts
Page#    780 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy