Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

कोशी का प्रवेश द्वार — मानसी जं० - Prabhat Sharan

Search Forum
Post PNR
Availability Calendar
Search NBL to BJP
Return# 17029
PDF Download

57130⇒17030/Hyderabad - Vijayapura Express
हैदराबाद - विजापुर एक्सप्रेस

NBL/Nimbal --> BJP/Vijayapura (Bijapur)

Updated: Jun 30 (19:17) by guest
Jun 30 (19:17)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    157 blog entries  <<prev  next>>
General Travel
17484 views
3

May 20 2018 (13:05)   17030/Hyderabad - Vijayapura Express
Irshad13~
Irshad13~   8102 blog posts
Entry# 3435169            Tags  
This Train should be better run as Fast passenger as it have very less Avg speed of 29km/Hr and taking much time between Hyderabad Deccan to Bijapur
Translate to English
Translate to Hindi

5 Posts

13805 views
1

May 22 2018 (14:22)
SingleTraveller^~
SingleTraveller^~   3267 blog posts
Re# 3435169-6              
1. YPR-UBL land levelling is done at almost all stretches. Its the funds needed to lay tracks and other related works that is required. So bit by bit they are completing.
This is an old 2017 update /blog/post/2251353
-
My guess:
...
more...
- RDI-ASK, TK-GBB and JRU-THN-HRR Mar 2019.
- GBB-RDI and SUBL- SVNR/HVR Mar 2020.
- HVR-HRR including Tungabhadra bridge Mar 2021.
-
2. GDG-HG - except Krishna bridge I guess by Mar 2020 most of the stretch will be completed.
-
3. UBL- LD - By Dec 2019 or Mar 2020 entire thing will be complete.
-
4. HPT - GDG - UBL by Dec 2019 or much earlier as just GDG and both sides of the stations is left after March 2019.
-
5. LD-MRJ - Will take till 2022 atleast.
-
Everything depends on the politicians and the funding given. Even LD-MRJ land levelling is done at many parts just no funds for track laying.
-

Translate to English
Translate to Hindi

13989 views
1

May 22 2018 (14:29)
Irshad13~
Irshad13~   8102 blog posts
Re# 3435169-7              
NOW 2019 Lok sabah elections come so no more activities takes place until finish the 2019 as state got Combined govt and center have different party so have to see this railway budget how much they provide for karnataka/SWR projects.
Translate to English
Translate to Hindi

13660 views
0

May 22 2018 (22:39)
CoringaExpress~
CoringaExpress~   5191 blog posts
Re# 3435169-8              
Consider ur final as semi final, as the final section to complete DL in enclosed list would be LD VSG :D
Translate to English
Translate to Hindi

13599 views
0

May 23 2018 (02:14)
Irshad13~
Irshad13~   8102 blog posts
Re# 3435169-9              
But brother he never said about LD-VSG completion which is phase 2 of Port connectivity Doubling.He saying only HPT UBL LD anyway From one of the goa member got info that Madgoan kulem earth works started and even Castle Rock to Tinai Ghat earth works for Doubling but time consuming stretches are CLR Kulem and VSG Madgoan.
Translate to English
Translate to Hindi

13418 views
1

May 23 2018 (15:57)
SingleTraveller^~
SingleTraveller^~   3267 blog posts
Re# 3435169-10               Past Edits
Yes I didn't consider that because I dont know if Braganza ghat doubling will be taken up, given the environmental issues and then if it is, then surely it will take a long time to finish the ghat section.
Translate to English
Translate to Hindi
Rail Fanning
19509 views
8

Jun 15 2018 (19:49)   17029/Vijayapura - Hyderabad Express | CVB/Cavalry Barracks (3 PFs) | PUNE/WDM-3D/11407
Ashok^~
Ashok^~   21610 blog posts
Entry# 3535133            Tags   Past Edits
PUNE WDM-3D 11407 with 57129 Bijapur - Bolarum Passenger chugs hard to overtake the empty rake of 12786 Bangalore - Kacheguda Superfast Express led by KJM WDM-3A twins with 18824 in lead...
Translate to English
Translate to Hindi
Rail Fanning
16819 views
6

Apr 06 2018 (19:10)   17029/Vijayapura - Hyderabad Express | CVB/Cavalry Barracks (3 PFs) | PUNE/WDM-3A/18926R
Ashok^~
Ashok^~   21610 blog posts
Entry# 3276527            Tags   Past Edits
PUNE WDM-3A 18926R entering loopline of Cavalry Barracks with 57129 Bijapur - Bolarum Passenger...
Translate to English
Translate to Hindi
Rail Fanning
18137 views
9

Mar 29 2018 (19:41)   17029/Vijayapura - Hyderabad Express | CVB/Cavalry Barracks (3 PFs) | PUNE/WDG-3A/14565R
Ashok^~
Ashok^~   21610 blog posts
Entry# 3249964            Tags   Past Edits
PUNE WDG-3A 14565R entering loopline of Cavalry Barracks with 57129 Bijapur - Bolarum Passenger...
Translate to English
Translate to Hindi
Rail Fanning
35969 views
0

Mar 22 2018 (19:37)   57133/Vijayapura - Raichur Passenger (UnReserved)
13YearsonYouTube4EverRail^~
13YearsonYouTube4EverRail^~   56119 blog posts
Entry# 3228554            Tags   Past Edits
Hyderabad-Bijapur-Raichur-Bolarum Passenger Train Board
Translate to English
Translate to Hindi
Page#    157 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy