Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

No Alcohol No Drugs - the only addiction is Railfanning, to escape the negativity of the world. - Keshav Singh

Search Forum
Post PNR
no description available
Entry# 5881561-0
no description available
Entry# 5881561-0
no description available
Entry# 6060133-0
Availability Calendar
Search OKHA to VG
Return# 22925
PDF Download

22926/Okha - Ahmedabad Vande Bharat Express
ओखा - अहमदाबाद वंदे भारत एक्सप्रेस

OKHA/Okha --> VG/Viramgam Junction

Updated: Apr 18 (05:31) by guest
Apr 18 (05:31)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    30 blog entries  next>>
Info Update
135252 views
1

Aug 01 (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   527 blog posts
Entry# 6143019            Tags   Past Edits
1 compliments
Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches including luggage loading capacity , 6 sleeper coaches , 8 ac class coaches ( which can include third ac or second ac or first ac or can be a mixture of these coaches ) and ( either 1 ac coach or 2 ac coaches can be removed to add pantry car coach and extra luggage coach ) so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 coaches , so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced or...
more...
saved due to directly conversion of mail or express train into train sets and rake reversal time of many trains will be reduced cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that i can save my post from getting archived.

Or either railways can apply this coach composition in in some upcoming amrit bharat express trains so that we can get see that whether this coach composition for train sets will become a successful idea or will become waste idea.

Translate to English
Translate to Hindi

More Posts
0
updating ...
8 wishes
Happy Journey Happy Journey:Great well safe journey Happy Journey शुभ यात्रा Happy Journey शुभ यात्रा HJ உங்கள் பயணம் இனிதே அமைய வாழ்த்துக்கள்
ON Trip series. Day No - 4. ...
more...
Trip No - 2. Part - 2.

202 Posts

FmtBlog
1962 views
0

Jul 25 (18:14)
VIVEKEXPRESS^~
VIVEKEXPRESS^~   43136 blog posts
Re# 6134991-203            Tags  

1 Posts

FmtBlog
3249 views
0

Jul 25 (18:19)
VIVEKEXPRESS^~
VIVEKEXPRESS^~   43136 blog posts
Re# 6134991-205            Tags  
@SBT: Sabarmati Jn   0km/h   14m late
@SBT: Sabarmati Jn &0 km/h #22925: Ahmedabad - Okha Vande Bharat Express is Arriving shortly here 😀
Translate to English
Translate to Hindi

More Posts
General Travel
261893 views
8

Sep 22 2023 (22:22)   20665/Chennai Egmore - Tirunelveli Vande Bharat Express | MS/Chennai Egmore (11 PFs)
Anurag.2001
Anurag.2001   402 blog posts
Entry# 5828218            Tags   Past Edits
2 compliments
Great Useful
MS - TEN, MAS - BZA, HWH - PNBE, KCG - YPR, PURI - ROU, TVC - KGQ, JP - UDZ, ADI - JAM And HWH - RNC Vande Bharat Express Official TT.
Translate to English
Translate to Hindi
General Travel
10639 views
3

May 31 (22:38)   22926/Okha - Ahmedabad Vande Bharat Express
HemangMankad~
HemangMankad~   1133 blog posts
Entry# 6081120            Tags  
1 compliments
Agree
Worst timings from Dwarka. Needs a Timetable revision in both directions.
Translate to English
Translate to Hindi
0
updating ...
2 wishes
शुभ यात्रा Forever MPS
Back to base in Hapa Duronto

11 Posts

FmtBlog
23776 views
0

May 25 (21:46)
HemangMankad~
HemangMankad~   1133 blog posts
Re# 6075666-12            Tags  

More Posts
Page#    30 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy