If 12223/24 Drnt is converted to AC SF with same timings then it will run will full to capacity thru out d year.
Also 12201/02 GR should run atleast four days a week.
As for shatabdi, a Pune Mao jan shatbdi will b flop due to such long travel timings as ppl will prefer sleeper trains.