Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

पश्चिम रेलवे की शान, पश्चिम सुपरफास्ट एक्सप्रेस मेरी जान - Abdul Rehman

Search Forum
Post PNR
Availability Calendar
Search TDU to HYB
Return# 17030
PDF Download

57129⇒17029/Vijayapura - Hyderabad Express
विजापुर - हैदराबाद एक्सप्रेस

TDU/Tandur --> HYB/Hyderabad Deccan Nampally

Updated: Jun 30 (19:20) by guest
Jun 30 (19:20)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    156 blog entries  <<prev  next>>
Rail Fanning
35331 views
11

Jun 06 2018 (21:04)   17029/Vijayapura - Hyderabad Express | CVB/Cavalry Barracks (3 PFs) | LGD/WAP-4/22511
Ashok^~
Ashok^~   21603 blog posts
Entry# 3498200            Tags   Past Edits
PUNE WDM-3D 11378 curving into Cavalry Barracks for its scheduled halt with 57129 Bijapur - Bolarum Passenger....
For the first time, i spotted a e-loco in action at CVB as LGD WAP-4 22511 was doing banking duty ...
Translate to English
Translate to Hindi

1 Posts

22086 views
0

Jun 07 2018 (09:32)
Ashok^~   21603 blog posts
Re# 3498200-2              
Looks so...also this train can easily get electric loco from Wadi to Bolarum.
Translate to English
Translate to Hindi

20360 views
0

Jun 07 2018 (13:38)
Senthil   1850 blog posts
Re# 3498200-3              
Why the banking? Were there bankers for this train previously too?
Translate to English
Translate to Hindi

21903 views
1

Jun 07 2018 (14:10)
Ashok^~   21603 blog posts
Re# 3498200-4              
No banker for this train and infact this section doesn't need bankers. Probably they are testing e-loco run i think
Translate to English
Translate to Hindi

19991 views
1

Jun 07 2018 (16:36)
sak~   2080 blog posts
Re# 3498200-5              
yes,freight loco can be given.as there be will be some always at sidings in wadi
Translate to English
Translate to Hindi

20175 views
0

Jul 27 2018 (12:29)
Shiek Kaleem   4 blog posts
Re# 3498200-6               Past Edits
Bro crs also done in may month
Translate to English
Translate to Hindi
Rail Fanning
34292 views
12

★★
Sep 14 2018 (12:44)   17030/Hyderabad - Vijayapura Express | SUR/Solapur (5 PFs)
psanga_sur^~
psanga_sur^~   5610 blog posts
Entry# 3805955            Tags   Past Edits
57130 Hyderabad - Bijapur Passenger negotiating curve at Kambar Talav (Sambhaji Lake), Solapur
Translate to English
Translate to Hindi

More Posts
General Travel
24515 views
4

Jul 29 2018 (15:38)   17029/Vijayapura - Hyderabad Express | CVB/Cavalry Barracks (3 PFs) | PUNE/WDM-3A/16012
Ashok^~
Ashok^~   21603 blog posts
Entry# 3669080            Tags   Past Edits
It was worth tracking and waiting :D
PA ALCO 16012 WDM-3A in DO livery with 5h 40mins late running 57129 Bijapur-Bolarum Passenger....
Translate to English
Translate to Hindi
Rail Fanning
23900 views
6

Jul 01 2018 (13:27)   17029/Vijayapura - Hyderabad Express | CVB/Cavalry Barracks (3 PFs) | ED/WDG-3A/13501
Ashok^~
Ashok^~   21603 blog posts
Entry# 3592112            Tags   Past Edits
#offlink ED WDG-3A 13501 curving into Cavalry Barracks for its scheduled halt with 57129 Bijapur - Bolarum Passenger....
Translate to English
Translate to Hindi
General Travel
17425 views
3

May 20 2018 (13:05)   17030/Hyderabad - Vijayapura Express
Irshad13~
Irshad13~   8102 blog posts
Entry# 3435169            Tags  
This Train should be better run as Fast passenger as it have very less Avg speed of 29km/Hr and taking much time between Hyderabad Deccan to Bijapur
Translate to English
Translate to Hindi

5 Posts

13835 views
1

May 22 2018 (14:22)
SingleTraveller^~
SingleTraveller^~   3266 blog posts
Re# 3435169-6              
1. YPR-UBL land levelling is done at almost all stretches. Its the funds needed to lay tracks and other related works that is required. So bit by bit they are completing.
This is an old 2017 update /blog/post/2251353
-
My guess:
...
more...
- RDI-ASK, TK-GBB and JRU-THN-HRR Mar 2019.
- GBB-RDI and SUBL- SVNR/HVR Mar 2020.
- HVR-HRR including Tungabhadra bridge Mar 2021.
-
2. GDG-HG - except Krishna bridge I guess by Mar 2020 most of the stretch will be completed.
-
3. UBL- LD - By Dec 2019 or Mar 2020 entire thing will be complete.
-
4. HPT - GDG - UBL by Dec 2019 or much earlier as just GDG and both sides of the stations is left after March 2019.
-
5. LD-MRJ - Will take till 2022 atleast.
-
Everything depends on the politicians and the funding given. Even LD-MRJ land levelling is done at many parts just no funds for track laying.
-

Translate to English
Translate to Hindi

13994 views
1

May 22 2018 (14:29)
Irshad13~
Irshad13~   8102 blog posts
Re# 3435169-7              
NOW 2019 Lok sabah elections come so no more activities takes place until finish the 2019 as state got Combined govt and center have different party so have to see this railway budget how much they provide for karnataka/SWR projects.
Translate to English
Translate to Hindi

13704 views
0

May 22 2018 (22:39)
CoringaExpress~
CoringaExpress~   5186 blog posts
Re# 3435169-8              
Consider ur final as semi final, as the final section to complete DL in enclosed list would be LD VSG :D
Translate to English
Translate to Hindi

13635 views
0

May 23 2018 (02:14)
Irshad13~
Irshad13~   8102 blog posts
Re# 3435169-9              
But brother he never said about LD-VSG completion which is phase 2 of Port connectivity Doubling.He saying only HPT UBL LD anyway From one of the goa member got info that Madgoan kulem earth works started and even Castle Rock to Tinai Ghat earth works for Doubling but time consuming stretches are CLR Kulem and VSG Madgoan.
Translate to English
Translate to Hindi

13399 views
1

May 23 2018 (15:57)
SingleTraveller^~
SingleTraveller^~   3266 blog posts
Re# 3435169-10               Past Edits
Yes I didn't consider that because I dont know if Braganza ghat doubling will be taken up, given the environmental issues and then if it is, then surely it will take a long time to finish the ghat section.
Translate to English
Translate to Hindi
Page#    156 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy