Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

TATA Steel Express - Second Sitting sasta bhi, sabse achha bhi - Ravi Raj

Search Forum
Post PNR
Close-up; Front-facing; Large TB; EOG/SLR; Outside of Train; Standing;
Entry# 3425423-0
Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 3973896-0


Availability Calendar
Search KUR to BAM
Return# 20816
PDF Download

12744⇒20815/Tatanagar - Visakhapatnam SF Express
टाटानगर - विशाखपट्टणम सुपरफ़ास्ट एक्सप्रेस

KUR/Khurda Road Junction --> BAM/Brahmapur

Updated: Oct 02 2023 (12:10) by _V_K_^~
Oct 02 2023 (12:10)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    254 blog entries  <<prev  next>>
General Travel
41690 views
5

Mar 18 (19:28)   20816/Visakhapatnam - Tatanagar SF Express
PurushottamExpress^~   25724 blog posts
Entry# 6002421            Tags  
Ecor proposal diya hai iska route via - SBPY - JSG-ROU pe divert karne ke liye.
Translate to English
Translate to Hindi

3 Posts

23740 views
2

Mar 28 (09:16)
deepak.yerr~
deepak.yerr~   6328 blog posts
Re# 6002421-4              
Let Tatanagar division introduce Biweekly from Tata to Benguluru via Raipur Ballashah and SC. Vskp has enough of demand for tatanagar for dedicated train. The present Tata Yesvantpur weekly should also be diverted via Raipur SC.
Translate to English
Translate to Hindi

19888 views
0

Mar 28 (22:13)
fanof12801~
fanof12801~   285 blog posts
Re# 6002421-5              
Totally agreed. And should be categorized as SF instead of Mail/Exp. Because on this route most of the trains run as express and gets heavily delayed. Example:08840 running by 8+ hrs late.
Translate to English
Translate to Hindi

12607 views
1

May 02 (10:40)
Gyanendra~
Gyanendra~   383 blog posts
Re# 6002421-6               Past Edits
How is this possible? This train is dedicated for HCNR, KDJR, BSPX, DPS and CBSA region. It was especially introduced for these areas in 2014 as special train and then for the benefit of the people of these areas, it was made permanent. Later another weekly TATA - VSKP Special Express was also introduced in this route which ran for few years. Also proposal was made in 2022 to make this train bi-weekly. At that time it was always running with 50% occupancy. Now when it is running with 100% occupancy, then suddenly how come talks about its route changing is arising?
Translate to English
Translate to Hindi

11237 views
0

May 02 (14:17)
fanof12801~
fanof12801~   285 blog posts
Re# 6002421-7              
Main discussion is not about route change, its about extension till hyderabad or a direct tata kollam train because of rsa, since railway is not able to manage its delay, always rescheduled by 3 hours.
Translate to English
Translate to Hindi

11057 views
0

May 02 (14:24)
Gyanendra~
Gyanendra~   383 blog posts
Re# 6002421-8              
Snehashish_railfan^~ has mentioned above -
"Ecor proposal diya hai iska route via - SBPY - JSG-ROU pe divert karne ke liye.
Translate to English
Translate to Hindi
Can any one clarify why this Train Return TT is in Day time? as RSA train is on Thursday it can easily run as a Overnight Express.
Translate to English
Translate to Hindi

5 Posts

30084 views
2

Apr 19 (14:48)
deepak.yerr~
deepak.yerr~   6328 blog posts
Re# 6035934-6               Past Edits
1 compliments
Great
Earlier the train used to leave Vskp at 1930 and arrive at 1030( approx timings) and return in afternoon. After lockdown a slot is made at 1530 Vskp for all weeklies towards BBS. So this train is arriving at morning at Tatanagar. SER instead of providing dep in evening made it to leave in morning. Associations have put proposal to make it triweekly and restore to afternoon or evening as Tatanagar Allepey is now delinked and proposal is also put up for triweekly.
Translate to English
Translate to Hindi

19071 views
1

Apr 28 (23:32)
Gyanendra~
Gyanendra~   383 blog posts
Re# 6035934-7              
1 compliments
Great
Though its return time table is in day time. Practically it always gets rescheduled by more than three hours and then reaches Visakhapatnam about four to five hours late i.e. in morning around 4 am which is the same time as earlier time table. So practically its return is always overnight.
Translate to English
Translate to Hindi

16840 views
0

Apr 30 (21:08)
IWANTTOBERLYMINISTER4EVER~
IWANTTOBERLYMINISTER4EVER~   46837 blog posts
Re# 6035934-8               Past Edits
Yesterday rescheduled by 1.30 hrs and reached 6.40 hrs late @05.25 AM instead of 10.45 PM😝😝🤪 started from TATA 4 hrs late and on route delay 2 hrs.
Translate to English
Translate to Hindi

13950 views
1

May 01 (21:21)
Gyanendra~
Gyanendra~   383 blog posts
Re# 6035934-9              
1 compliments
Agree
This is happening on its every run. Even railways knows that it can't run this train according to the superfast time table. Superfast tag is only to extract extra money from passengers by the name of superfast surcharge.
Translate to English
Translate to Hindi

14924 views
2

May 01 (21:25)
RFIR~
RFIR~   6891 blog posts
Re# 6035934-10              
2 compliments
Great:100%True Agree
Overnite train from Tata to VSKP and vice versa is very much needed. Loss of Tata-Allp slip has not ended up well for Tata passengers. They lost the only daily connectivity to Vizag. Tata-ERS runs at an odd time and doesn't touch Vizag which is of no benefit at all.
Translate to English
Translate to Hindi
General Travel
44018 views
1

Sep 30 2022 (08:03)   20815/Tatanagar - Visakhapatnam SF Express
Gyanendra~
Gyanendra~   383 blog posts
Entry# 5492469            Tags   Past Edits
Now not remained suitable for KDJR, BSBX, DPS and CBSA people to return from TATA in second half. This was the only train between 10:00 am and 3:00 pm from TATA to go towards CBSA/DPS that too a weekly train. Now even that has been scrapped off in favour of long route passengers. A daily train towards BBN/GUA/KDJR leaving TATA between 12:00 noon and 2:00 pm is badly needed. If someone couldn't board train no. - 12021, HWH - BBN Jan Shatabdi Express, they have now to wait another 7 hours 15 minutes on Sunday and 5 hours on other weekdays to catch the next train from TATA.
Translate to English
Translate to Hindi
1 Followers
General Travel
85958 views
11

Aug 08 2023 (13:15)   20816/Visakhapatnam - Tatanagar SF Express
SCoRUArlys~
SCoRUArlys~   3348 blog posts
Entry# 5793107            Tags   Past Edits
2 compliments
Useful Useful
Few ECoR proposals of IRTTC

Note: For more proposals please DM, WhatsApp number in Private chat.
Translate to English
Translate to Hindi

36 Posts

43319 views
1

Aug 09 2023 (17:55)
PiyushSrivastava^~
PiyushSrivastava^~   20535 blog posts
Re# 5793107-37              
I suppose that the reason was that on Mondays, they would have to block 2 PFs. Swarna Rekha Exp already blocks the PF for nearly 4-5 hrs and this also used to block for 6 hrs. They needed additional PF and free lines to handle TATA GODA Exp (introduced after the timings change of TATA VSKP). This is what I suppose, I may be completely wrong as well
Translate to English
Translate to Hindi

1 Posts

42608 views
1

Aug 10 2023 (09:51)
RFIR~
RFIR~   6891 blog posts
Re# 5793107-39              
1 compliments
Agree
Already Tata-VSKP passengers were let down once Tata-Allp daily service was stopped. At least Tata-Allp had conveninent timings both ways. Tata-ERS doesnt go to VSKP which is an issue. Also odd time of dep from Tata.

Tata-VSKP Exp again is a day train reaching around midnight which is again inconvenient.

Either
...
more...
passengers have to got to Rourkela to catch DHN-Allp, HTE-ERS and other Bangalore bound trains or else for direct option take the Weekly Tata-YPR . Overall the passengers from Tata goin to VSKP are now left with bad options

Translate to English
Translate to Hindi

43700 views
2

Aug 10 2023 (12:21)
PiyushSrivastava^~
PiyushSrivastava^~   20535 blog posts
Re# 5793107-40              
One more option is to go to KGP and catch any VSKP bound train coming from Kolkata side. Most trains from Kolkata bound to south go to VSKP
Translate to English
Translate to Hindi

42313 views
0

Aug 10 2023 (13:09)
AmitJha^~   18399 blog posts
Re# 5793107-41              
ER ke proposals hain to please share karen
Translate to English
Translate to Hindi

40633 views
1

Aug 11 2023 (07:53)
RFIR~
RFIR~   6891 blog posts
Re# 5793107-42              
Yes correct. I missed that. Passengers would obviously prefer direct option any time rather than break journey and getting down and then boarding. Overall passengers from Jamshedpur & outskirts, Sini, CKP have been at a loss with a lack of daily train to VSKP.
Translate to English
Translate to Hindi

More Posts
General Travel
34611 views
1

Oct 01 2023 (16:46)   20816/Visakhapatnam - Tatanagar SF Express
Gyanendra~
Gyanendra~   383 blog posts
Entry# 5837384            Tags  
SER seems to be kidding or making the passengers fool with the new time table of 20816 VSKP - TATA Express. Speeds of 90 Kmph, 74 Kmph, 59 Kmph have been kept between some stations in the section from Jakhapura to Dangoaposi, whereas trains can travel only at speed of 30 Kmph in this section due to speed constraint. That is why the train always used to get more than 3 hours late in reaching Dangoaposi. See what time has been allotted to this train and what time it actually takes especially in this section -
1. SKND - HCNR - allotted - 53 mins, it actually takes 1 Hr, 30 mins,
2.
...
more...
HCNR - KDJR - allotted - 33 mins, it actually takes 1 Hr, 20 mins,
3. KDJR - BSPX - allotted - 1 Hr, 25 mins, it actually takes 2 Hrs,
4. BSPX - DPS - allotted - 43 mins, it actually takes 1 Hr.
With present time table, it will always reach TATA more than 3 hours late and in the return, it will reach VSKP more than 5 hours late.

Translate to English
Translate to Hindi
Page#    254 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy