It was only for CLR yard inspection. I visited QLM CLR ghat section in April 2023 only poles were being laid.
Second i travelled to VSG on 15/06/23 to capture first LHB video or Goa express from SVM in pass train during that I saw the progress of electrification of MJO VSG and only poles were being laid and at VSG yard only some poles were laid in no way it's possible that both sections are electrified so soon it will take another 9 to 12 months for these two sections to be electrified and I guess it may even take more than that coz progess is too slow as of now.
please wait...Translate to EnglishIt was just for a yard inspection, man. I went to check out the QLM CLR ghat section in April 2023 and all they were doing was putting up poles.
Then, on June 15, 2023, I went to VSG to capture the first video of the Goa Express with the new LHB coaches. On the way, I saw that they were working on electrifying the MJO VSG section, but again, just poles were being laid. And at the VSG yard, they only had some poles up. There's no way both sections would be electrified so soon. It's gonna take another 9 to 12 months at least, and honestly, it might even take longer because the progress is hella slow right now.