Though the train has not been extended, thought to make the following observations.
The sequence of the coach composition is incorrect.In fact both the up and down trains show the same sequence.
The correct should have been:
ENG-SLR-D1-D2-D3-D4-C1-D5-D6-SLR
Because...
more... of this wrong composition and also a lack of knowledge of where the Engine would stop(as this is a very small train), my parents almost missed the train on Sunday on its last and final run. They just managed to board the running train with me throwing in the luggage.
the train left Secunderabad at 16.50 and reached Begumpet at 17.02. Though the 2 minute halt sometimes feel too long, yesterday it felt not enough as we stood at the wrong place and had to run.
The train reached Pune at 5 am!!!!!!! whenever it was allowed to run, it had magnificent speed, only to stop and let other trains go by as this train was already running late. The AC Chair car journey made them feel comfortable and they did not depend on food and water.
If the train reaches Wadi before 5.45 pm, it stands a good chance to reach Pune on time. If there is a small delay, then it has to make way for the other long distance trains.
Hoping to hear the launch of the Shatabdi sooner now. Pune travel was possible atleast by this train.