Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

The train is a small world moving through a larger world - Niraj Kumar

Search Forum
Post PNR
no description available
Entry# 4189718-0
Side View; Large TB; EOG/SLR; Outside of Train; Moving Straight;
Entry# 4191648-0


Availability Calendar
Search NLR to OGL
Return# 22871
PDF Download

08472⇒22872/Tirupati - Bhubaneswar SF Express
तिरुपति - भुवनेश्वर सुपरफास्ट एक्सप्रेस

NLR/Nellore --> OGL/Ongole

Updated: Oct 01 2023 (18:32) by PurushottamExpress^~
Oct 01 2023 (18:32)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    169 blog entries  <<prev  next>>
General Travel
14264 views
0

May 03 2017 (05:40)   22871/Bhubaneswar - Tirupati Weekly SF Express | TPTY/Tirupati (6 PFs)
deepak.yerr~
deepak.yerr~   6358 blog posts
Entry# 2260344            Tags  
Coach Composition BBS to Vskp SLR GS GS GS A1 B1 B2 AB1 S10 S9....S2 S1 GS GS GS SLR. total 22 coach. The train halts at renigunta on 90% runs for more then 60mins till sapthagiri express leaves to Tirupati. So people going to Tirumala can get down and take a taxi directly from Renigunta or proceed to Tirupati bus stand enroute to tirumala.
Translate to English
Translate to Hindi

12929 views
0

May 03 2017 (06:17)
UTTARANDHRARAILSEVA~
UTTARANDHRARAILSEVA~   1894 blog posts
Re# 2260344-1              
This Train takes 110 minutes to cover the distance of around 40 km between NELLORE and GUDUR and again it covers 94 km between GUDUR and TIRUPATI in 145 minutes which results in wastage of time of pilgrims. The reason for the delayed TT may be non availability of stabling lines at TPTY station .In that case the train may be extended up to CHITTUR (CTO) and it can leave GDR at 6.00 and TPTY at 8.00 to reach CTO at 9.00.In the return direction the train may leave CTO at 11.00 and reach TPTY at 12.40 and can pick up its original path.
Translate to English
Translate to Hindi

13098 views
0

May 03 2017 (08:54)
guest   40346 blog posts
Re# 2260344-2              
Same tt krmr tpty reaches tpty at 8.10am,since it has rsa with seven hills scr given agressive tt for krmr tpty biweekly, bbs tpty will return to bbs so they r just delaying the rake no issue with satbbling lines ,rake has to wait in pf ,ya scr can send rake to sick lines but for 4hrs whats the use of sending rake that might be question from scr, to chittor is waste of time
Translate to English
Translate to Hindi

12384 views
0

May 03 2017 (11:59)
Andhra boy   3434 blog posts
Re# 2260344-3              
But not all knows it. People mostly gets down at TPTY only
Translate to English
Translate to Hindi

12735 views
0

May 03 2017 (20:58)
deepak.yerr~
deepak.yerr~   6358 blog posts
Re# 2260344-4              
Why chittor it go empty andhra region fully comes under RLWL and there are no takers from BBS to Chittor either.
Translate to English
Translate to Hindi
General Travel
13078 views
0

Mar 06 2017 (20:34)   22872/Tirupati - Bhubaneswar SF Express
Ravi~
Ravi~   3492 blog posts
Entry# 2188232            Tags  
The number of general coaches should increase in this train.
Translate to English
Translate to Hindi
PREDICTIONS: 0
confirm: 0%
rac: 0%
wl: 0%
Journey: Mon Mar 06, 2017
Dep: TPTY/Tirupati @ 10:25 PF#: 2
Arr: BBS/Bhubaneswar @ 05:55 +1 night
Distance: 1181 km / 1181 km
Class: Sleeper - SL   |   Tot Seats: Avbl-0517#   |   Charting @06:30
22872/Tirupati - Bhubaneswar SF Express
PNR: 422-xxxxxxx   |   Similar PNRs
Entry# 2187248
NO PENDING REQUEST
Posted: Mar 05 2017 (21:11:51)  View Posted Status
Passenger 2: Confirmed (Booking Status: S1,64,GN)
Total Fare:  1080
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.
I plan to log this trip thru my SmartPhone. All members are invited to follow me and enjoy this trip with me. Thanks.

Latest Status: Mar 06 2017 (11:13:47) 
Passenger 2: S1,64 [SU] (Booking Status: S1,64,GN)
Total Fare:  1080
Chart PREPARED

Full PNR Status History (2 statuses)
Status as of: Mar 06 2017 (11:13:47)
Passenger 2: S1,64 [SU] (Booking Status: S1,64,GN)
Total Fare:  1080
Chart PREPARED

Status as of: Mar 06 2017 (01:24:46)
Passenger 2: Confirmed (Booking Status: S1,64,GN)
Total Fare:  1080
Chart NOT Prepared


6 Posts

35837 views
0

Mar 06 2017 (19:47)
12658ChennaiMail^~
12658ChennaiMail^~   13239 blog posts
Re# 2187248-7              
Give complaint to Onboard TTE
Translate to English
Translate to Hindi

34658 views
0

Mar 06 2017 (19:55)
meswastik69   23 blog posts
Re# 2187248-8              
Hmm I complaint on clean my coach app for watering the coach
Translate to English
Translate to Hindi

35027 views
0

Mar 06 2017 (20:12)
12658ChennaiMail^~
12658ChennaiMail^~   13239 blog posts
Re# 2187248-9              
Ok, keep updating on this
Translate to English
Translate to Hindi

34292 views
0

Mar 06 2017 (20:22)
meswastik69   23 blog posts
Re# 2187248-10              
Ok
Translate to English
Translate to Hindi

34395 views
0

Mar 07 2017 (10:55)
meswastik69   23 blog posts
Re# 2187248-11              
TRIP HAS ENDED.
Delayed in 15 minutes
Translate to English
Translate to Hindi
General Travel
12832 views
0

Feb 14 2017 (06:31)   22872/Tirupati - Bhubaneswar SF Express
Aqua~
Aqua~   204 blog posts
Entry# 2163629            Tags  
This train has official stop @ ichchapuram as per NTES @ 6.11a.m , and I have observed live as i am travelling now.
Moderator sir please update.
Translate to English
Translate to Hindi
Journey:
Dep: TPTY/Tirupati @ 10:25 PF#: 2
Arr: BBS/Bhubaneswar @ 05:55 +1 night
Distance: 1181 km / 1181 km
Class:
22872/Tirupati - Bhubaneswar SF Express

PNR: 134-xxxxxxx   |   Similar PNRs
Entry# 33796        
NO PENDING REQUEST
Posted: Apr 24 2010 (10:35:13)
Passenger 1: RAC 11 (Booking Status: RAC 37, GNWL)
Chart NOT Prepared
Please predict my chances of confirmation. Thanks.
why this train taking somuch time from GDR-VSKP, actually the EXP trains take 12.30 hrs with all stopppages, with out stoppages 0872 taking soooomuch time.
Thanks & Regards
SARAT


 

7319 views
0

Apr 24 2010 (15:08)
saragada75
saragada75   471 blog posts
Re# 33796-1              
@guest: Entry# 33796
Date of Journey: Sat Apr 24 Class: Sleeper
Passenger 1: S1, 21 (Booking Status: RAC 37, GNWL)
Chart PREPARED
Translate to English
Translate to Hindi
Page#    169 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy