Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

यमला-पगला-ट्रेन का-दिवाना - कार्तिक

Search Forum
Post PNR
Close-up; Side View; Small TB; Sleeper; Outside of Train; Standing;
Entry# 5229774-0
Medium; Small TB; Sleeper;
Entry# 5233551-0


Availability Calendar
Search TPT to KPD
Return# 18189
PDF Download

18190/Ernakulam - Tatanagar Express
एरणाकुलम - टाटानगर एक्सप्रेस

TPT/Tirupattur --> KPD/Katpadi Junction

Updated: Jun 10 (10:38) by _V_K_^~
Jun 10 (10:38)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    739 blog entries  <<prev  next>>
General Travel
533608 views
0

May 17 2023 (20:33)   13351/Dhanbad - Alappuzha Express | DHN/Dhanbad Junction (9 PFs)
guest
Entry# 5726334            Tags   Past Edits
A clone train for 13351/52 Dhanbad- Alleppey Express is must and 18189/90 Tata - ERS should run daily.
Translate to English
Translate to Hindi
General Travel
373661 views
35

★★★
Apr 25 2023 (21:26)   18189/Tatanagar - Ernakulam Express | TATA/Tatanagar Junction (6 PFs)
PiyushSrivastava^~
PiyushSrivastava^~   20572 blog posts
Entry# 5704908            Tags   Past Edits
8 compliments
Useful Great Useful Great:Great job Piyush! Great:Work Great Useful Great
THE FATE OF DIRECT CONNECTIVITY BETWEEN TATANAGAR AND MADRAS
Presenting the 3rd issue of my analysis, this time a mix of several services from the 70s to the current time. You may call it Tata Madras, Bokaro Madras, Bokaro Tata Madras Slip, Bokaro Tata Madras Alleppey Slip, Dhanbad Bokaro Tata Madras Alleppey Slip, Dhanbad Alleppey, Tata Ernakulam or whatever you like :D

The
...
more...
train was started in 1970 to cater the needs of people willing to travel to the south. Before this, they were dependent on Kharagpur or Visakhapatnam for Madras and south bound trains. 89/90 Express eased out this tension. Although the days of run are unclear, it supposedly ran twice a week.

In 1970 it was introduced between Tatanagar and Madras Central and ran with an average speed of 40 kmph, with a travel time of 40h 35m, taking the route via Titlagarh-Visakhapatnam-Bhimavaram-Gudur. In 1975, it was extended to Bokaro Steel City via Muri. The distance as well as time of travel increased, and average speed fell by 1 kmph in up, and soared up by 1 kmph in down.

A blunder happened in 1981 wherein the train got screwed up. It was split into two parts, one part came from/to Tatanagar (89A/90A) and another from/to Bokaro Steel City (89/90) via Muri-Ranchi. This surely saved time for the passengers from Bokaro Steel City, the train also got speeded up by 3-4 hrs in both directions (This splitting remains my least favourite part of the tale). The amalgamation and bifurcation took place at Rourkela, spelled Raurkela that time. Tatanagar and Bokaro both lost a full rake train to south from their origin. The bifurcation was followed by route diversion. The train was diverted to run via Eluru instead of its original route, via Bhimavaram.

The train was again sped up in 1984, reducing the journey time by two hours towards south India and by more than 3 hours from south India. 1989 gave the two trains their new numbers, Bokaro Madras Bokaro Express was now 8689/8690 and Tatanagar Madras Tatanagar was 8189/8190.

On 16th July 1991, the then Railway Minister for India, Mr. C.K. Jaffer Sharief presented the rail budget for 1991-92. In this budget, he announced the extension of Bokaro Madras Tata train services to Alappuzha, which was then known by its old name, Alleppey. The route decided was via Arakkonam-Salem-Shoranur-Ernakulam. Both trains got a new slot, owing to this extension. While both, Bokaro and Tatanagar parts of this train were made to depart 7 hours earlier, they were made to arrive about 6 hours ahead of their previous schedule at Tatanagar and Bokaro.

Between 1991 and 1995, the train was diverted to run via Perambur, bypassing Madras Central/Chennai Central. This saved a reversal. In my records, till 1999, the train was via Perambur. Between 1999 and 2006, it was again diverted via Central.

2003 brought yet another change in the stars of this train. Mr. Nitish Kumar, the then Railway Minister for India and the current Chief Minister of Bihar, presented the 2003-04 rail budget on 26th February 2003. He declared the extension of Bokaro Alleppey Express to Dhanbad. The route selected was via Chandrapura - Katrasgarh. The Dhanbad part of the whole train got a new number, 3351/3352 as the zone was changed from South Eastern Railway to East Central Railway.

In 2010, Indian Railways switched over to 5 digit train numbering system. Dhanbad Alleppey Express got 13351/13352 and Tatanagar Alleppey Express got 18189/18190. Over the years, the train was constantly sped up and/or slowed down in both directions. In 2017, the DC (Dhanbad-Chandrapura) line was closed due to underground mine fires. Railways had no alternative except to divert and cancel trains. Some trains were cancelled and some were diverted. This train was diverted via Gomoh, increasing a reversal. Four reversals is quite a big number (Gomoh, Visakhapatnam, Chennai Central and Shoranur). People protested, and the DC line was re-opened. In 2019, again this train was diverted via Katrasgarh. Meanwhile in the same year, Shoranur bypass came up. Two reversals were dropped but the journey time was still nearly the same.

All train services were suspended from March 2020 owing to pandemic outbreak. Gradually from May 2020, trains were restored in phases. During this period, railways came up with a plan to curtail the slip services. Three trains of Tatanagar were running on slip method, including this. Dhanbad Alleppey was restored, but Tatanagar Alleppey wasn't. During early 2021, a special express between Tatanagar and Ernakulam was started. This train served as a replacement for Tata Alappuzha Express. Though initially weekly, the frequency was increased to bi-weekly in 2022 and LHB rake was given. Both Dhanbad Alappuzha and Tatanagar Ernakulam Expresses run with LHB rake now. Tatanagar Ernakulam Express treated as an independent train, bypasses Visakhapatnam by halting at SCMN, Chennai Central by halting at PER, Coimbatore by halting at Podanur and also bypasses Shoranur. It takes the original path of via Bhimavaram. But the fact which remains, is a daily dedicated connectivity between South East Jharkhand and South India was lost.

Note:

1. *** means no halt
2. TAAG shows only some stations so years where source is TAAG, it is bound to have more ***
3. All halts have not been mentioned otherwise the list would have been too long.

If any quality issues are there, kindly let me know. I'll try to upload a better quality pic.

Translate to English
Translate to Hindi

26 Posts

92797 views
0

May 02 2023 (20:12)
Brandon12663^~
Brandon12663^~   35721 blog posts
Re# 5704908-27               Past Edits
Old no was 6331/32 (AFAIK)
Introduced as tri weekly in 2002
Then became bi weekly and one extended to Kanyakumari
In 2007 both became SF exp
Translate to English
Translate to Hindi

92174 views
0

May 02 2023 (20:13)
PiyushSrivastava^~
PiyushSrivastava^~   20572 blog posts
Re# 5704908-28              
Sorry but I have only 2006 TT in my collection after 2000s. If you want, I can provide you with its 2006 TT.
Translate to English
Translate to Hindi

93048 views
1

May 02 2023 (20:15)
Brandon12663^~
Brandon12663^~   35721 blog posts
Re# 5704908-29              
1 compliments
Useful
You can modify with my knowledge 😊
Like introduced in 2003
Translate to English
Translate to Hindi

90403 views
1

May 02 2023 (21:42)
PiyushSrivastava^~
PiyushSrivastava^~   20572 blog posts
Re# 5704908-30              
Train 6803/6804 TPJ HWH TPJ Express was announced in Rail Budget 1998-99 after elections under Atal Bihari Vajpayee Government by Railway Minister Mr. Nitish Kumar on budget dated 29 May 1998. Initially the train was a tri-weekly service. It left Tiruchirappalli on Tu, F, Sa.

In 2000 under the same government, Ku. Mamata Bannerjee presented her first rail budget on 25 Feb 2000 (2000-01). In this, she announced the extension of tri-weekly TPJ HWH TPJ Exp to Kanniyakumari, once a week on Saturdays. New number was given 6355/6356 to the CAPE
...
more...
portion.

It was converted to SF in 2006, with numbers 2663/2664. In 2010, number was changed to 12663/12664.

That's what I could gather

Translate to English
Translate to Hindi

89992 views
1

May 02 2023 (22:24)
Brandon12663^~
Brandon12663^~   35721 blog posts
Re# 5704908-31              
Yaa
Exactly you said
Even I wasn't sure about inaugural
Translate to English
Translate to Hindi
Rail Fanning
136094 views
7

Mar 23 2023 (11:30)   18189/Tatanagar - Ernakulam Express | TATA/Tatanagar Junction (6 PFs)
PurushottamExpress^~   26029 blog posts
Entry# 5673804            Tags   Past Edits
1 compliments
Great
Tata - Ernakulam Express at tatanagar Jn.
Translate to English
Translate to Hindi

2 Posts

114620 views
1

Mar 23 2023 (11:43)
AdittyaaSharma^~
AdittyaaSharma^~   77693 blog posts
Re# 5673804-3              
1 compliments
Useful
Tata - Jammu Tawi se bhi zyada reputed train hai TATA CDO ki❤️❤️❤️❤️❤️❤️
Translate to English
Translate to Hindi
General Travel
107670 views
1

Mar 06 2023 (15:00)   18189/Tatanagar - Ernakulam Express
UTTARANDHRARAILSEVA~
UTTARANDHRARAILSEVA~   1896 blog posts
Entry# 5655112            Tags  
What happened to the proposal of Running this as a daily ?
Why has SER forgotten the proposal to run it daily ?
If LHB Coaches are not available currently, spl trains can be run with ICF coaches.
Translate to English
Translate to Hindi

103868 views
0

Mar 06 2023 (15:04)
AdittyaaSharma^~
AdittyaaSharma^~   77693 blog posts
Re# 5655112-1              
Washing pitline constraints is main issue at CDO/TATA
Translate to English
Translate to Hindi

1 Posts

99927 views
1

Mar 11 2023 (22:03)
RFIR~
RFIR~   6908 blog posts
Re# 5655112-3              
Kitna pit line hain Tata mein ? When the train was planned to be daily that time were they not aware ? The Train reaches that Tata in the morning on Tuesday only goes back on Thursday (after almost 48 hours) train that reaches on and Fridays only leaves on Sunday (after almost 48 hours). With this time table and long waiting period, not sure if they can become daily quickly
Translate to English
Translate to Hindi

100262 views
1

Mar 11 2023 (22:44)
AdittyaaSharma^~
AdittyaaSharma^~   77693 blog posts
Re# 5655112-4               Past Edits
3 pitlines hai
Translate to English
Translate to Hindi

98110 views
1

Mar 11 2023 (23:03)
Rail12345
Rail12345   2369 blog posts
Re# 5655112-5              
SER not getting LHB coaches for this train. More rakes r required for this train to run daily. Don't know SER may run another train from Shalimar using this train remaining days via Tatanagar. We have to wait.
Translate to English
Translate to Hindi
0
updating ...
3 wishes
शुभ यात्रा Happy Journey Happy Journey
Republic Day Special. Next up to Visakhapatnam. Taking one of the 3 prestigious Triveni Sisters, Ratnachal Express .

142 Posts

FmtBlog
86630 views
0

Jan 26 2023 (08:48)
DrSwaroop^~
DrSwaroop^~   109896 blog posts
Re# 5612381-143            Tags  

37 Posts

FmtBlog
87239 views
0

Jan 26 2023 (11:14)
DrSwaroop^~
DrSwaroop^~   109896 blog posts
Re# 5612381-181            Tags  
@REG 1 km <--> 7 km @YLM   40m late
@REG: Regupalem &100 km/h Overtook #18190: Ernakulam Tatanagar Express here
Translate to English
Translate to Hindi

More Posts
Page#    739 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy