Ir should run link exp alone on Bilaspur ngp route with more coachs and dakshin should extend to bhatinda Ferozpur by reducing some stops and decrease travell time. So that both can have lhb in future.
Also increase 3ac and 2ac coaches
1 is not enough for 50 halts .