Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

12263/64 Pune - H. Nizamuddin AC Duronto - यह है पुणेकर वालों की राजधानी जिसका speed है सबसे Great, नहीं पहुंची है अब तक अपने लक्ष्य स्थान पर Late. - Sahil Khandare

Search Forum
Post PNR
TRAIN IS CANCELLED
Availability Calendar
Search SBGA to YPR
Return# 06551xxXX
PDF Download

06552⇒06552XXX/Shravanabelagola - Yesvantapur DEMU Special
श्रवणबेलगोला - यशवंतपुर डेमू विशेष

SBGA/Shravanabelagola --> YPR/Yesvantpur Junction

Updated: by guest
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    78 blog entries  <<prev  next>>
Rail Fanning
5416 views
20

★★★
Feb 03 2014 (19:08)   06551xxXX/Yesvantpur - Shravanabelagola DEMU Special | SUR/Solapur (5 PFs)
 
Siddheshwarexpress
Siddheshwarexpress   5968 blog posts
Entry# 983509            Tags   Past Edits
╘╘╘╘ YPR-JP LHB SPL.. with ED WDG 3A... ╝╝╝╝
Finally Spotted this train :)
on a calm foggy morning.. Today :)
was waiting for Basava Exp wen i heard announcement for this train ..
ran
...
more...
on Pf 4 to capture this train.. Loco was ED WDG 3A..
Train was almost EMPTY......
Superb lookin red LHB coaches new to most of the ppl..
Best in Large.....
© ▬> raj

Translate to English
Translate to Hindi

2697 views
9

Feb 03 2014 (19:41)
Siddheshwarexpress
Siddheshwarexpress   5968 blog posts
Re# 983509-1              
Curved pf @ SUR.. .
Translate to English
Translate to Hindi

2841 views
1

Feb 03 2014 (20:40)
Sayak   1228 blog posts
Re# 983509-2               Past Edits
it runs empty btwn ypr & sur.. from sur its starts getting full n gets fully pack till kalyan/vasai road.. from there, it gets good patronage also.. :)
but always runs with a lots of delay, whch is the main cause of concern.. :-/
Translate to English
Translate to Hindi

3159 views
6

Feb 04 2014 (08:50)
Siddheshwarexpress
Siddheshwarexpress   5968 blog posts
Re# 983509-3            Tags   Past Edits
ED WDG 3A Alco in charge for this week..
Translate to English
Translate to Hindi

2586 views
6

Feb 05 2014 (08:48)
Siddheshwarexpress
Siddheshwarexpress   5968 blog posts
Re# 983509-4              
Departing SUR......
Translate to English
Translate to Hindi

3064 views
1

Feb 15 2014 (13:35)
d_chaitanya~
d_chaitanya~   1774 blog posts
Re# 983509-5              
awesome captures
Translate to English
Translate to Hindi
Info Update
1710 views
0

Feb 27 2014 (18:25)   06551xxXX/Yesvantpur - Shravanabelagola DEMU Special
 
guest
Entry# 1009045            Tags  
last trip over.cancel this
Translate to English
Translate to Hindi
General Travel
3881 views
9

Feb 17 2014 (13:28)   06551xxXX/Yesvantpur - Shravanabelagola DEMU Special
 
udyanabhatufan~
udyanabhatufan~   631 blog posts
Entry# 998417            Tags  
06551 Yeswantpur-Jaipur Weekly LHB Special..!! KJM WDM3A 16296
With KJM WDM3A 16296,YPR-JP LHB Special negotiates a 90 degree curve just to enter Birur Jn for its 2 min scheduled stop..!!!
This train has LHB Coaches with is alloted to Yeswantpur-Chandigarh Bi Weekly Sampark Kranti,as the train needs two rakes and just one rake is available so that train is running with a normal Blue Cloured ICF Rake and this rake is used as a special to run from Yeswantpur to Jaipur once a week...!!!
This
...
more...
train had a Mismatch coach in between which is of 12213/14 Sarai Rohila Duronto...!!!
About LHB Coaches....
Linke Hofmann Busch (LHB) coaches are the passenger compartments of Indian Railways that have been developed by Linke-Hofmann-Busch of Germany(renamed Alstom LHB GmbH in 1998 after the takeover by Alstom) and produced by Rail Coach Factory in Kapurthala, India. They have been used since 2000 on the Indian Broad Gauge (1676 mm) network of Indian railways. Initially, 24 air conditioned coaches were imported from Germany that would be used for the Shatabdi Expresses, after which the Rail Coach Factory started manufacturing after technology transfer. The coaches are designed for an operating speed up to 160 km/h and could go up to 200 km/h. However, they have been tested up to 180 km/h. Their length of 23.54m and a width of 3.24m means a higher passenger capacity, compared to conventional rakes. The tare weight of the AC chair car was weighed as 39.5 Tons.
They are considered to be "anti-telescopic", which means they do not get turned over or flip in case of a collision (chiefly head-on). These coaches are made of stainless steel and the interiors are made of aluminium which make them lighter as compared to conventional rakes. Each coach also has an "advanced pneumatic disc brake system" for efficient braking at higher speeds, "modular interiors" that integrate lighting into ceiling and luggage racks with wider windows. The improved suspension system of LHB coaches ensures more riding comfort for the passengers compared to conventional rakes. The air conditioning system of the LHB coaches is of higher capacity compared to the older rakes and is controlled by a microprocessor which is said to give passengers better comfort than the older coaches during summer and winter seasons. They are relatively quieter as each coach can produce a maximum noise level of 60 decibels while conventional coaches can produce 100 decibels. Each LHB coach costs between Rs 15 million to 20 million, whereas the power car which houses a generator costs about 30 million.
History:
In February 2000, IR received a consignment of new lightweight all-metal passenger coaches from Alsthom LHB (Germany). The initial units were earmarked for the New Delhi - Amritsar Swarna Shatabdi, but later [5/01] allotted to the new New Delhi - Lucknow Swarna Shatabdi.
The coaches are approximately 2.2m longer than the standard ICF-built integral coaches (two additional rows for the chair cars, one additional sleeping bay for the sleeper coaches). The AC coaches are expected to carry 78 passengers. The body is by Alsthom LHB, with a stainless steel construction, mounted on Fiat bogies with disc brakes. The chair cars are lighter about 10% lighter than the standard IR integral coaches, having a tare weight of 40.3 tonnes.
Improvements for the passengers' comfort include better air flow for the air-conditioning, larger windows, lamps for all seats, and sound insulation. The coaches are also provided with 'anti-climbing' features to reduce casualties in case of collisions. As a move to greater cleanliness at stations, the toilets are designed to allow waste discharge only when the train is in motion.
LHB coaches have an IGBT-based battery charger. The air-conditioned stock uses a 6kW alternator while the non-air-conditioned stock uses a 4.5kW alternator. Air-conditioning equipment is roof-mounted.
These coaches are not compatible with existing designs of ICF/RCF coaches, having two sets of brake and feed pipes and a different electrical coupler, and hence will initially be run in block rakes consisting entirely of the new coaches, until RCF begins producing them with modifications to make them compatible with existing passenger stock.
A total of 24 new coaches are expected to be imported initially (19 second-class AC chair cars, 2 AC chair cars, 3 generator-cum-brake vans), following which a technology transfer arrangement will enable RCF, Kapurthala, to manufacture these models. Later shipments from Alsthom will include composite first-class / AC sleeper coaches, second-class AC sleeper coaches (2-tier and 3-tier), and AC buffet coaches. (See above for some information on the interior arrangements.)
RDSO had the task (starting in June 2000) of developing specifications for all the variant designs of the LHB coaches. In addition to the layout of the compartments and specifications for the passenger accommodations, RDSO also worked on the design for the suspension, alternator drives, and other such details. The design of the General Second Class (GS) coach was done by July 2002, and by 2003 ten variants of the LHB coaches had been designed by RDSO. These include self-generating versions as well as versions powered by end-on generator cars, of air-conditioned first class, 2-tier, and 3-tier coaches, as well as general second class sitting and sleeper coaches.
The speed potential for all the AC variants of the LHB coaches is 160km/h, while the non-AC variants have a speed potential of 120km/h.
Now [2/03] ICF Perambur is also expected to produced these coaches. [1/03] Prototype versions of the AC 3-tier LHB coach have been spotted at New Delhi and are [3/03] undergoing trials on the New Delhi - Kanpur and New Delhi - Moradabad - Lucknow sections. [11/03] The second LHB rake, thought to be meant for the Mumbai Rajdhani, has been spotted around Mumbai (Jogeshwari yard, etc.). Update: [1/05] LHB rakes are used for the Mumbai Rajdhani as well as the August Kranti Rajdhani.
In late 2001 the LHB coaches were taken out of service following a series of incidents where the couplers parted. They were brought back into service on Jan. 1, 2002. Some problems also developed with certain bearings used by these coaches, which were later resolved. Now [3/03] they are expected to also be brought into use for trains other than the Swarna Shatabdis, such as the Mumbai Rajdhani.
Comparison of ICF and LHB coaching stock -- passenger carrying capacity
EOG = Coach needs power from end-on generator car; SG = self-generating.Type Passengers - ICFPassengers - LHB
AC-1 (EOG) 18 24
AC-2 (EOG) 46 54
AC-3 (EOG) 64 72
AC-1 (SG) 18 24
AC-2 (SG) 46 54
AC-3 (SG) 64 72
SCN (SG) 72 78
GS (SG) 90 99
SLR 24 36
Glimpse of Indian Railways
Click Here: click here

Translate to English
Translate to Hindi

1 Posts

1885 views
0

Feb 17 2014 (13:35)
Anonymous1218~
Anonymous1218~   22543 blog posts
Re# 998417-2              
Maha daarun re!!!
Translate to English
Translate to Hindi

1573 views
0

Feb 17 2014 (20:29)
udyanabhatufan~
udyanabhatufan~   631 blog posts
Re# 998417-3              
@998417-1  @guest
:(
Translate to English
Translate to Hindi

1659 views
0

Feb 17 2014 (20:29)
udyanabhatufan~
udyanabhatufan~   631 blog posts
Re# 998417-4              
Thx da
Translate to English
Translate to Hindi

1717 views
0

Feb 25 2014 (16:44)
Sayak   1228 blog posts
Re# 998417-5              
isme yeh ek duronto ka rake kaha se aa gaya..? :(
Translate to English
Translate to Hindi

2129 views
0

Feb 26 2014 (00:26)
udyanabhatufan~
udyanabhatufan~   631 blog posts
Re# 998417-6              
12213/14
Translate to English
Translate to Hindi
General Travel
3514 views
0

Feb 25 2014 (20:00)   06552XXX/Shravanabelagola - Yesvantapur DEMU Special
 
guest
Entry# 1007049            Tags   Past Edits
aaj shayad last trip hai is train ki ..
ypr lko must be starting soon this week
Translate to English
Translate to Hindi

2623 views
0

Feb 25 2014 (20:01)
Siddharth S^~   23608 blog posts
Re# 1007049-1              
@1007049-0  @guest
Cant say- might be extended
Translate to English
Translate to Hindi

2492 views
0

Feb 25 2014 (20:14)
Vinay_Mysuru^~
Vinay_Mysuru^~   8113 blog posts
Re# 1007049-2              
This rake should be taken back to introduce YPR-LKO Exp as IR is running out of time to introduce 3 pending trains from YPR (LKO, JBP and KCG). Spl's can be started even when Code of Conduct is in place.
Translate to English
Translate to Hindi
Rail Fanning
11900 views
11

Feb 23 2014 (18:36)   06551xxXX/Yesvantpur - Shravanabelagola DEMU Special | BSR/Vasai Road (7 PFs)
 
SankalpSharma^~
SankalpSharma^~   5377 blog posts
Entry# 1004958            Tags   Past Edits
My AII trip
--------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
Trane no-06551/YPR-JP LHB Special
From-BSR-AII
After
...
more...
waiting more then 3 hour at waiting room finaly my train arrives at pf 7,with WDG-3 .....and its tym for me to travel 1st tym in LHB coaches...all the coaches were new and cooling is good coz this train is extended just 2 or 3 days before frm its journy...train almost empty
and when i was in waiting room...i meet a person who get a cnf ticket through current reservation in sleeper
all the people inside the train said tht "this train is very bad...but this is the only train in which reservation avilable thts v r tend to trvl in this train
and when train started from BSR it lte mre then 3 hour and when ir arrives at AII...the time decreases to 2hour not because it covers the tym...coz of slack tym give to this train
this train cover ST-BSR in 5hr 45 mnt
even 59038/ST-VR pass covers ST-VR in 5hr 40 mnt
Pic 1st-My B2 Coach At BSR.....looking Awesomee "RED HOT"
Pic 2nd-RCF Made Coach Made in Nov 13
pic-3rd-AC System Of This Coach
---------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------
Stay Tuned For More Pics with Detail
---------------------------------------------------------------------------------------------------

Translate to English
Translate to Hindi

7 Posts

3725 views
1

Feb 24 2014 (13:58)
ckg2012   448 blog posts
Re# 1004958-8              
i agree with you , this train route should be change between Gulbarga to Yesvantpur , this train should be run via dharmavarm route , the it will not be late
Translate to English
Translate to Hindi

3353 views
1

Feb 24 2014 (16:00)
SankalpSharma^~
SankalpSharma^~   5377 blog posts
Re# 1004958-9              
Yaa this is super crwler
Bt if tmng chnge
it would be a super hit....even tdy it runs with wl...
Translate to English
Translate to Hindi

4009 views
1

Feb 25 2014 (13:48)
SankalpSharma^~
SankalpSharma^~   5377 blog posts
Re# 1004958-10              
Run through signal to some up train
Translate to English
Translate to Hindi

4067 views
1

Feb 25 2014 (14:12)
SankalpSharma^~
SankalpSharma^~   5377 blog posts
Re# 1004958-11              
going to mai line after stops at bijaynagar
Translate to English
Translate to Hindi

5419 views
0

Feb 25 2014 (16:50)
Sayak   1228 blog posts
Re# 1004958-12              
waiting for that premium train whch was announced earlier this budget.. in hope that it will be a superfast train with short route (for end to end passengers) n better time slot (like night departure from bangalore also)
#speeded_up required
Translate to English
Translate to Hindi
Page#    78 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy