हाटे-बाजारे एक्सप्रेस : चलती - फिरती मछली बाजार - Piyush Singh

Search Forum
Post PNR
Availability Calendar
Search UBL to YPR
Return# 16541
PDF Download

06542⇒16542/Pandharpur - Yesvantpur Weekly Express
पंढरपुर - यशवंतपुर साप्ताहिक एक्सप्रेस

UBL/SSS Hubballi Junction (Hubli) --> YPR/Yesvantpur Junction

Updated: Oct 20 2023 (01:11) by Pradeepkulkarni~
Oct 20 2023 (01:11)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    106 blog entries  <<prev  next>>
General Travel
9629 views
1

Sep 29 2018 (19:32)   16542/Pandharpur - Yesvantpur Weekly Express
Mahaveer Jain^~
Mahaveer Jain^~   11587 blog posts
Entry# 3852519            Tags  
Todays arrival at yesvantpur jn around 11am almost 4:40mns late,one of my fellow pax along wid his mother had to miss Ranchi bound flight dept at 11:20am thanks to controllers,disasterly bigoted its own scion,pvr-ypr departed Hubli at 11:15pm yesterday ahead of golgumbaz and Rani chennamma ,arrived arsikere at 6:40am trolled before tumakuru itself.
Don't know why weeklys are deluded interms of priority,but it has to make some justice to non dailys
Translate to English
Translate to Hindi

8725 views
1

Sep 29 2018 (19:48)
psanga_sur^~
psanga_sur^~   5610 blog posts
Re# 3852519-1               Past Edits
Tweet to Hubli DRM for reason of delay..
Generally this train arrives before time at Yeshwantpur.
Translate to English
Translate to Hindi

8682 views
0

Sep 30 2018 (06:55)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   10896 blog posts
Re# 3852519-2               Past Edits
Yesterday all morning trains arriving at UBL including Rani Chennamma were 1.5-2hrs late, some issue between JRU-DVG all trains got late in this section. 16536 GG took 3hrs for DVG-JRU section.
Translate to English
Translate to Hindi
Info Update
21879 views
23

★★★
Jun 17 2018 (01:47)   16541/Yesvantpur - Pandharpur Weekly Express | YPR/Yesvantpur Junction (6 PFs)
SingleTraveller^~
SingleTraveller^~   3265 blog posts
Entry# 3540053            Tags   Past Edits
Doubling Updates:
-
Tumakuru - Arsikere.
- The work after TK station till Heggere showed no sign of any change.
- After Heggere I could make out that track laying has begun with some gaps
...
more...
till Mallasandra.
- Many stations are being renovated.
- All the dark pics are of this section. Try as I might but still taking pics in the dark was of no use.
But I did keep going to the door and kept opening and peeping into the dark on both the sides much to the chagrin of others who were lying down near the doors.
- Nothing really seems to have changed since the last time I saw /blog/post/2818081
- The target for last year was RDI to ASK. That target was missed due to rails issue. Now again there seems to be no movement. The ballast packing at some places seems complete. But still no sign of signals. Some gaps in track laying still remain like near LCs. I did notice at one place some battery boxes for signals.
- In one pic you can see the FoB at Tiptur is completed as compared to the older post, but still the PF construction is going on.
- At ASK there are now 3 bridges just before the station. Again dark, so couldn't say if that is the new one I saw last time being built.
- Overall, its like "will they ever complete?"
-
Chikkajajur - Tholahunse.
- This target was missed last year again cooking the "no rails" story.
- This year I tried to see as much as possible, but could make out little bit only on my side as the other side I couldn't see, as people refused to let me open the door to peep out :)
- On my side I saw - rails were placed on either side (inside) of the newly laid rails. I didn't understand why new rails are placed , when the old laid rails itself is yet to be commissioned. These rails were shining like they had been freshly coated with that anti-rust brownish-yellow coating.
- No signals or signs of the battery boxes.
-
Kudachi - Belagavi.
- Electrification work has started at some places - /blog/post/3539096
- Land levelling is completed at most parts, and some construction of bridges is going on.
- The brighter pics are of this section.
-
-
Travel by the YPR - PVR Special train.
-
- I had made last minute plans to travel and chose the PVR special train to travel by UR thinking that it will be empty. After reaching YPR, I went to the rear GEN to board, but no seats were available at 5 PM itself. Then slowly made my way to the front after noting the CC, here too it was filling up but thankfully I got a seat. By the time it started, it was full with long distance travellers as well as office goers going back to TK.
- This is a popular train despite the fact it is a weekly special, which I thought many wouldn't know. But the GEN travellers know each and every train and also the fact that this train they charge 15 rs extra - called SF charges, though this is not a SF.
- The train gets least priority and got looped for freights too, but does good speed owing to lesser halts and a lot of slack.
- The reserved classes too had good rush, showing the desperate need for a train on this route with just RC taking the entire load. And while returning too got a very good response for both reserved and UR especially at BGM and UBL.
Some pics of the crowd waiting to board at DWR, UBL is attached. Even GPB, KUD too had many takers , but sadly those 2 halts are removed from July.
- Once this is converted to weekly from July, then bookings will be very good with no extra charges to pay and new halts like at Haveri and Harihara.
-
Best parts of the journey :
- was the run from DVG to UBL outer. It did the distance in 2 Hrs flat with 3 crossings for RC, GG and a freight, which all took some 20 minutes. Then at UBL outer took a 10 mins halt then they allowed it in. Probably were not happy at the early arrival :)
- the OT of RC at UBL while returning. That train for some unknown reason was detained at UBL to allow this late runner to OT. This could have followed RC all the way till YPR, but weirdly they allowed the OT. This arrived before time at YPR.
-
Worst part :
- At UBL it arrived at around 2:45, 15 mins before time. Then left at around 3:45 - 40 mins late, as they had not arranged a new loco to replace the one which was hauling, which had some problem.
-
Hope they add GEN coaches atleast for the YPR - PVR weekly part, since the KSK part has to haul parcel vans.
PC was not open but still attached.
The reason PC is not removed is maybe - the time needed to shunt on Sat to attach back the PC in the middle of the rake and then do PM before departure at 1: 45 as KSK is too tight a schedule after it arrives from PVR, so they have left the PC as it is.
-

Translate to English
Translate to Hindi

3 Posts

18318 views
12

★★
Jun 17 2018 (23:04)
SingleTraveller^~
SingleTraveller^~   3265 blog posts
Re# 3540053-4              
Other sighting:
This HRR/SMET Tri-weekly is a botched up ICE.
1. TT is a mess. The earlier TT was better people said. So it has less preference now.
2. The rake had good no. of GEN coaches. Now I saw the GEN coaches are reduced I think and looks like they are SL type with 2 doors but blue coloured.
3.
...
more...
Seeing the availability, its the GEN which needs to be increased. 6 reserved coaches is a waste.

Translate to English
Translate to Hindi

20152 views
10

Jun 17 2018 (23:27)
SingleTraveller^~
SingleTraveller^~   3265 blog posts
Re# 3540053-5               Past Edits
The mess in TT and unwillingness to run trains and deliberately pushing away travellers to other modes - these are things that SWR is good at.
-
A fellow traveller saw me clicking pics of the HRR-KTY puny pass stationed at Harihara's small PF adjacent to PF 1 and said that - that train is the worst.
"It starts at 8:30 and
...
more...
goes slowly to its destination at 12:30. 4 Hrs for 70 Kms. And one person goes from coach to coach collecting money by getting down at stations and collecting from all.
Bus takes just 1.5 Hrs for the same stretch. Why should one use this train?"
-
I dont know when he took the train. The Arr/Dep history on IRI doesn't show any info. But still if he is correct, then its a waste of public money building that new line.
And I am pretty sure this same 5 coach train will be extended to HPT, if at all that line opens.
A high density route, they are running a 5 coach train and unwilling to complete the remaining stretch even after a good 20 years.
-

Translate to English
Translate to Hindi

9644 views
1

Jun 19 2018 (11:38)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   10896 blog posts
Re# 3540053-6              
YPR-HRR ICE struggles in TK-ASK route, it keeps following Chikkamagaluru Pass right from TK till Kadur. But once Kardi-ASK double line is opened, surely it can cover TK-ASK in 2hr. Then again struggles in JRU-DVG due to Gujarat trains and UBL-SBC Pass, so once Tolahunse-JRU and ASK-TK is doubled it should be able to reach DVG by 21:45.
Translate to English
Translate to Hindi

8565 views
0

Aug 16 2018 (14:05)
~   628 blog posts
Re# 3540053-7              
Which station is this ? (In the last few pics taken at night time, the platform looks pretty good with continues shelter, granite flooring and good no. of lights)
Translate to English
Translate to Hindi

8295 views
0

Aug 23 2018 (19:55)
SingleTraveller^~
SingleTraveller^~   3265 blog posts
Re# 3540053-8              
General Travel
6750 views
1

Jun 28 2018 (19:35)   16541/Yesvantpur - Pandharpur Weekly Express
Abhishek~
Abhishek~   7485 blog posts
Entry# 3583029            Tags   Past Edits
06541 took 80 minutes to cover 13 km distance between DVG and HRR, on 21 June departure, due to 5 crossings between DVG and Chalgeri !!
Halted at DVG for 25 mins, for crossing with 17302 DWR-MYS exp and 2 hr late running 17312 VSG-MAS exp.
Looped at HRR for crossing with 16589 RC and 16536 GolGumbaz exp..
Crossed with 12630 KSK at Chalgeri..
...
more...

Yet managed to reach UBL 10 min early

Translate to English
Translate to Hindi

5754 views
1

Jun 28 2018 (22:33)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   10896 blog posts
Re# 3583029-1              
Should be speeded up and made to depart at 19:00. Or they should give halts at Tiptur, Birur, Kadur, Haveri, Ranebennur. Dont know who gives SWR ideas such as skipping district HQs and important places for even short distance trains.
Translate to English
Translate to Hindi

5777 views
0

Jun 28 2018 (22:54)
sachinature~
sachinature~   8588 blog posts
Re# 3583029-2              
Hope it will maintain proper time, starting from next week regular run
Translate to English
Translate to Hindi

5605 views
0

Jun 30 2018 (18:10)
Dhanno   3041 blog posts
Re# 3583029-3              
It has halt at Haveri.
Translate to English
Translate to Hindi

5337 views
0

Jul 20 2018 (13:29)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   10896 blog posts
Re# 3583029-4              
I thought the Special train didn't have Haveri halt. Now the regular train doesn't halt at kudachi.
Translate to English
Translate to Hindi
General Travel
7048 views
1

Jul 05 2018 (17:36)   16541/Yesvantpur - Pandharpur Weekly Express
Abhishek~
Abhishek~   7485 blog posts
Entry# 3603118            Tags  
AS per NTES, below is the TT:
YPR - 18:00
TK - 19:02/19:03
ASK - 21:19/21:20
DVG - 00:02/00:03
HRR
...
more...
- 00:19/00:20
HVR - 01:37/01:38
UBL - 03:14/03:15
DWR - 03:45/03:46
BGM - 06:09/06:10
MRJ - 08:39/08:40
KVK - 09:49/09:50
SGLA - 10:42/10:43
PVR - 11:35
One minute halt at all the stations, including UBL !!

Translate to English
Translate to Hindi

6203 views
0

Jul 05 2018 (17:39)
Irshad13~
Irshad13~   8102 blog posts
Re# 3603118-1              
ha ha lol. This is NTES TT means we should only consider running time no haltage time will be given perfectly in this
Translate to English
Translate to Hindi

6158 views
1

Jul 05 2018 (18:06)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   10896 blog posts
Re# 3603118-2              
Today's weird controlling- Siddhaganga halted for 20mins at Birur to let KSK overtake it. Now Siddhaganga will surely reach Hubballi at 22:15 or later only.
Translate to English
Translate to Hindi

5963 views
0

Jul 05 2018 (18:26)
Irshad13~
Irshad13~   8102 blog posts
Re# 3603118-3              
yup reason for Making siddaganga wait for KSK is KSK dont hav more halts and even halt at Birur also and KSK need to go long way to NZM so seeing this 2 reasons controller took that decision
Translate to English
Translate to Hindi
1 Followers
General Travel
45343 views
25

★★★
Mar 27 2018 (10:58)   16541/Yesvantpur - Pandharpur Weekly Express | BJP/Vijayapura (Bijapur) (3 PFs)
 
12YEARSINIRI^~   11515 blog posts
Entry# 3241494            Tags   Past Edits
New trains for Karnataka
1) YPR SUR extended to Hassan
2) YPR PVR will be regular
3) MYS RU New train using Sharavathi's rake
4) YPR UBL Weekly
5)
...
more...
Bagalkot Khajjidoni Passenger services

Translate to English
Translate to Hindi

213 Posts

7618 views
1

Mar 28 2018 (17:56)
sachinature~
sachinature~   8588 blog posts
Re# 3241494-214               Past Edits
Thank you for migrants for properly paying tax and feeding local politicians, it is important that migrants contribute for state development and more and more migrating to the state. Migrants will not learn local language and hence cannot contest for elections, intern local politician who born in the same state and knows local language will take advantage of this and make money out of these migrants.
Translate to English
Translate to Hindi

1 Posts

11155 views
0

Mar 28 2018 (20:14)
sachinature~
sachinature~   8588 blog posts
Re# 3241494-216               Past Edits
Instead of 22133/4 extn to Hassan, they should have extended it till Mangaluru for three days on Gomateshwara express slot, converting few General coaches into 2S reserved coaches from Ypr, by this way at-least Sur/Gr/Wadi/Rc will get direct connectivity to KA Coast - Majn, all they need is one extra Rake. Anyhow it will be going to follow Gomateshwara/Karwar exp till/from Hassan with a time difference of 20-30 minutes in both directions
Translate to English
Translate to Hindi

11181 views
0

Mar 29 2018 (09:28)
12YEARSINIRI^~   11515 blog posts
Re# 3241494-217              
As per CRS , train will not be permitted to run unless the first train has descended completely. Crossing is being allowed now a days , More catch sidings needs to be constructed to operate more trains.
Translate to English
Translate to Hindi

12192 views
2

Mar 29 2018 (09:40)
netravathiexp~   11036 blog posts
Re# 3241494-218              
These kinda peoples spoiling the peace of IRI..
Translate to English
Translate to Hindi

11031 views
1

Mar 29 2018 (11:45)
promethsuresh^~
promethsuresh^~   3554 blog posts
Re# 3241494-219              
Blog Entry Archived.
Blog derailed
Translate to English
Translate to Hindi
Page#    106 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy