Full Site Search  
Wed Aug 23, 2017 13:47:27 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Details Edit
Large TB;
Entry# 1599049-0
Details Edit
Large TB;
Entry# 1599049-0
Refresh Live Status (not updated)
 
 

12830/Bhubaneswar - Chennai Superfast Express
ଭୁବନେଶ୍ଵର - ଚେନ୍ନାଇ ସୁପର୍ ଫାସ୍ଟ ଏକ୍ସପ୍ରେସ     भुवनेश्वर - चेन्नई सुपरफास्ट एक्सप्रेस

BBS/Bhubaneswar --> MAS/Chennai Central

Updated: Aug 09 2017 (22:21) by ANUBHARADWAJ MAHARSHI
Aug 09 2017 (22:21)

Train Forum

Page#    363 blog entries  next>>
  
Predictions: 7
confirm: 7
rac: 0
wl: 0
Journey: Fri Jun 30, 2017 @ 21:10
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 118
Travel: MAS/Chennai Central   to   BBS/Bhubaneswar   |   1226 km / 1226 km
12829/Chennai - Bhubaneswar SF Express (PT)
Entry# 2321610

Posted by: Ghar Waapsi   8 blog posts   8 correct pred (45% accurate)
PNR: 454-xxxxxxx   |   Similar PNRs
Posted Status as of: Jun 15 2017 (15:31)
Resv From: MAS/Chennai Central
Boarding Point: MAS/Chennai Central
Resv To: BBS/Bhubaneswar
Resv Quota: GN

Passenger 1: RAC# 14 (GN) (Booking Status: RAC# 15)
Total Fare:  1450
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 22 2017 (22:01)
Resv From: MAS/Chennai Central
Boarding Point: MAS/Chennai Central
Resv To: BBS/Bhubaneswar
Resv Quota: GN

Passenger 1: Confirmed (GN) (Booking Status: RAC# 15)
Total Fare:  1450
Chart NOT Prepared

Full PNR Status History (3 statuses)
Status as of: Jun 22 2017 (22:01)
Resv From: MAS/Chennai Central
Boarding Point: MAS/Chennai Central
Resv To: BBS/Bhubaneswar
Resv Quota: GN

Passenger 1: Confirmed (GN) (Booking Status: RAC# 15)
Total Fare:  1450
Chart NOT Prepared

Status as of: Jun 19 2017 (23:25)
Resv From: MAS/Chennai Central
Boarding Point: MAS/Chennai Central
Resv To: BBS/Bhubaneswar
Resv Quota: GN

Passenger 1: RAC# 3 (GN) (Booking Status: RAC# 15)
Total Fare:  1450
Chart NOT Prepared

Status as of: Jun 15 2017 (15:33)
Resv From: MAS/Chennai Central
Boarding Point: MAS/Chennai Central
Resv To: BBS/Bhubaneswar
Resv Quota: GN

Passenger 1: RAC# 14 (GN) (Booking Status: RAC# 15)
Total Fare:  1450
Chart NOT Prepared


  
637 views
Jun 30 2017 (10:37)
Ghar Waapsi   8 blog posts   8 correct pred (45% accurate)
Re# 2321610-1            Tags   Past Edits
Thanks for all the predictions. Ticket is confirmed..
  
General Travel
0 Followers
517 views
Jun 27 2017 (11:23)   12829/Chennai - Bhubaneswar SF Express (PT)

xxxx~   909 blog posts   38 correct pred (57% accurate)
Entry# 2334170            Tags   Past Edits
3/5 top routs of this train are un Andhrapradesh
  
★★  General Travel
Feb 10 2016 (10:16)   VSKP/Visakhapatnam Junction (8 PFs)
 

Mangalagiri   342 blog posts
Entry# 1734723            Tags   Past Edits
Time has come for VSKP to say Good bye to ECoR ..
Announcement on Vizag zone after Union Budget, says Sujana
: Chief Minister N. Chandrababu Naidu has requested the Railway Ministry to take an expeditious decision on the creation of Visakhapatnam railway zone.
The Chief Minister, accompanied by Union Minister Y.S. Chowdary and P. Ashok Gajapati Raju, called on Railway Minister Suresh Prabhu
...
more...
in New Delhi on Tuesday. Mr. Naidu submitted representation seeking speedy completion of pending works in the State, including connectivity between Amaravati and major cities in the south through high-speed trains.
He wanted the Railway Ministry to make sufficient budgetary allocations for the completion of the Kakinada-Pithapuram, Nadikudi-Srikalahasti and Guntukal-Srikalahasti lines besides requesting the Centre to hand over maintenance of the old bridge at Rajahmundry to the State Government. The State emphasised the need for ensuring that the allocations were made in the upcoming railway budget.
Mr. Chowdary said the Centre had given in-principle clearance for the railway zone in Visakhapatnam and the zone would be announced after the Union Cabinet formally gives its nod.
Development package
Creation of the special railway zone was part of the special development package assured to the State post bifurcation.
The State had also sought the Ministry to take up works on feeder line connecting the new capital Amaravati with Guntur and Vijayawada. The Ministry was requested to consider the proposal for laying third line between Visakhapatnam and Chennai besides examining the proposals for development of infrastructure at important railway stations through joint ventures.
The Railway Minister, he said, positively responded to the representation and promised that surveys would be undertaken on the proposals submitted by the State Government as well as the MPs from the State.
Thrust areas
Sufficient budgetary allocations for completion of Kakinada-Pithapuram, Nadikudi-Srikalahasti, Guntukal-Srikalahasti lines
Commencement of works on feeder line connecting the new capital Amaravati with Guntur and Vijayawada
Third line sought between Visakhapatnam and Chennai
click here

22 posts - Wed Feb 10, 2016

66 posts - Thu Feb 11, 2016

  
71963 views
Feb 11 2016 (18:15)
LHB Coromandal A Dream^~   6702 blog posts   9045 correct pred (74% accurate)
Re# 1734723-106            Tags   Past Edits
Even if train got extended to BBS, still its going via VSKP city and catering to both cities.

  
72483 views
Feb 11 2016 (18:23)
LHB Coromandal A Dream^~   6702 blog posts   9045 correct pred (74% accurate)
Re# 1734723-107            Tags   Past Edits
#moderator
#system
#FM
Bashing is going on on full height against a specific Zone and State.
Kindly Lock this blog.

  
Feb 11 2016 (18:28)
South East Coast Railway SECoR™   501 blog posts   450 correct pred (60% accurate)
Re# 1734723-108            Tags   Past Edits
how come it is catering both the cities
quota for VSKP had been decreased by ECoR, infact BBS has more quota than VSKP, for its extended trains - isn't true?
new coaches allotted to WAT are replaced by old coaches within weeks of their inauguration - isn't true?
new trains proposed for VSKP are rejected by ECoR stating irrelevant reasons and the same
...
more...
trains are lobbied to start from BBS - isn't true
trains running from BBS are given proper/effecient TT, while that of VSKP are given TT full of slacks or less TAT - isn't true?

  
71801 views
Feb 11 2016 (18:28)
kalingaUtkal   240 blog posts
Re# 1734723-109            Tags   Past Edits
Yes, you are right.
Nothing has happen till now. But so many bashings are going on. First Rly. Ministry will discuss with Odisha Govt. as per the demands in this reagard, than any fruitful news may come for A.P peoples.

  
Feb 11 2016 (18:30)
system   939 blog posts
Re# 1734723-110            Tags   Past Edits
Auto-Archived due to Objections.
  
★★  Rail Fanning
0 Followers
3365 views
Jan 15 2017 (00:37)   12829/Chennai - Bhubaneswar SF Express (PT) | CLKA/Chilka (4 PFs)

Railfan Z*^~   11571 blog posts   2585 correct pred (84% accurate)
Entry# 2127497            Tags   Past Edits
MAS-BBS at the most beautiful location of it's route. Chilika lake.

  
3055 views
Jan 15 2017 (09:36)
Afraaz suhail 🚂🚄🚅^~   4399 blog posts   576 correct pred (87% accurate)
Re# 2127497-1            Tags   Past Edits
This has been awesome view

  
2798 views
Jan 15 2017 (12:48)
JBP ET OHE OMG 😲~   13865 blog posts   22 correct pred (43% accurate)
Re# 2127497-2            Tags   Past Edits
Pics make me remember the lake after chengalpattu towards ms
  
Predictions: 24
confirm: 24
rac: 0
wl: 0
Journey: Fri Dec 09, 2016 @ 21:10
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 118
Travel: MAS/Chennai Central   to   BBS/Bhubaneswar   |   1226 km / 1226 km
12829/Chennai - Bhubaneswar SF Express (PT)
Entry# 2079351

Posted by: Hrithik Abhishek Roshan~   20 blog posts   22 correct pred (64% accurate)
PNR: 484-xxxxxxx   |   Similar PNRs
Posted Status as of: Dec 03 2016 (17:31)
Passenger 1: Waitlist# 7 (Booking Status: W/L 21,GNWL)
Total Fare:  1450
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Dec 09 2016 (17:20)
Passenger 1: RB3 55 (Booking Status: W/L 21,GNWL)
Total Fare:  1450
Chart PREPARED

Full PNR Status History (8 statuses)
Status as of: Dec 09 2016 (17:20)
Passenger 1: RB3 55 (Booking Status: W/L 21,GNWL)
Total Fare:  1450
Chart PREPARED

Status as of: Dec 09 2016 (10:21)
Passenger 1: RAC 10 (Booking Status: W/L 21,GNWL)
Total Fare:  1450
Chart NOT Prepared

Status as of: Dec 08 2016 (21:28)
Passenger 1: RAC 11 (Booking Status: W/L 21,GNWL)
Total Fare:  1450
Chart NOT Prepared

Status as of: Dec 08 2016 (18:39)
Passenger 1: RAC 12 (Booking Status: W/L 21,GNWL)
Total Fare:  1450
Chart NOT Prepared

Status as of: Dec 08 2016 (12:58)
Passenger 1: RAC 14 (Booking Status: W/L 21,GNWL)
Total Fare:  1450
Chart NOT Prepared

Status as of: Dec 06 2016 (23:36)
Passenger 1: Waitlist# 1 (Booking Status: W/L 21,GNWL)
Total Fare:  1450
Chart NOT Prepared

Status as of: Dec 05 2016 (23:43)
Passenger 1: Waitlist# 4 (Booking Status: W/L 21,GNWL)
Total Fare:  1450
Chart NOT Prepared

Status as of: Dec 03 2016 (17:10)
Passenger 1: Waitlist# 7 (Booking Status: W/L 21,GNWL)
Total Fare:  1450
Chart NOT Prepared


  
3686 views
Dec 05 2016 (11:49)
Hrithik Abhishek Roshan~   20 blog posts   22 correct pred (64% accurate)
Re# 2079351-1            Tags   Past Edits
Will it get confirmed?

  
3639 views
Dec 08 2016 (12:58)
Banerjee™^~   2789 blog posts   31325 correct pred (74% accurate)
Re# 2079351-2            Tags   Past Edits
100% conform ho jayega !
Page#    363 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.