today I traveling WRS to KIUL in GAYA JHAJHA PSGR. I see this train in all coches no any one fan running I don't know why and KG line all psgr train following before 2015 TT that time slow track and DO eng use. now electric dual tracks and tracks speed also increse than why not reduce TT. if time reduce than 1 racks possible to run 2 time up and 2 time down in same day or better to increse coches minimum 15 coches without any extra coch requrment.
please wait...Translate to Englishtoday I'm traveling from Warisaliganj to Kiul in Gaya Jhajha passenger train. I noticed in all the coaches the fans were not running, don't know why. On the KG line, all passenger trains used to follow the timetable from before 2015 when the tracks were slow and used diesel engines. Now with electric dual tracks and faster tracks, the speed has increased, so why not update the timetable? If the time is reduced, it might be possible to run the train twice in the same day or just add more coaches, at least 15 coaches without needing any extra coach.