Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bhopal Shatabdi: chalti hai ek dum hawa ke mafik, speed aisi ke ruka de traffic - Varun

Search Forum
Post PNR
Medium; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 2921542-0

Large TB
Entry# 6067090-0

Small TB
Entry# 6067090-0
Availability Calendar
Search ZN to SC
Return# 17659
PDF Download

57626⇒17660/Kakatiya Express
काकतिया एक्सप्रेस

ZN/Jangaon --> SC/Secunderabad Junction

Updated: Mar 10 (18:33) by GujaratMail^~
Mar 10 (18:33)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    83 blog entries  next>>
General Travel
5782 views
0

Yesterday (00:10)   17659/Kakatiya Express | SC/Secunderabad Junction (10 PFs)
abdulrazzak123
abdulrazzak123   109 blog posts
Entry# 6075893            Tags   Past Edits
Rivision of CC NEW RSA of the Repalle exp, delta exp and Manuguru SF exp and Change in RSA pattern of Kakatiya Express with Hundry Express
Kakatiya Express to run with 2S and AC CC coaches with effect from 30 June 2024
and Delta express to run With 2A from 30 June 2024
Permanent augmentation of 2 SL for MUGR SF
...
more...


Delta Exp/Manugur SF/RAL EXP- PM- KCG(4-Rakes)
Bidar Exp/SKZR ICE/Hundry/Kakatiya exp- PM-HYB(4-Rakes)

Translate to English
Translate to Hindi
General Travel
11595 views
3

May 22 (09:33)   17659/Kakatiya Express | SC/Secunderabad Junction (10 PFs)
abdulrazzak123
abdulrazzak123   109 blog posts
Entry# 6072366            Tags   Past Edits
How would it be Running Kakatiya exp with 2 Rakes with extension till MUGR and re-introduction of MUGR KZJ Passenger it would be a great thing right..?
17659
SC-18:50
KZJ-21:50
DKJ-23:30
BDCR-
...
more...
01:10/1:30
MUGR-3:05
17660
MUGR-10:50
BDCR- 12:00/12:20
DKJ- 02:00
KZJ- 04:00
SC- 07:05

5-SL, 1-3A, 10-UR, 2-SLR
Lay-over rake as MUGR KZJ Passenger

Translate to English
Translate to Hindi

2 Posts

6693 views
0

May 22 (10:24)
KKRAlwaysDestroyTeamIndia~
KKRAlwaysDestroyTeamIndia~   1555 blog posts
Re# 6072366-3              
Okay. 2 hrs 45 mins in SC-KZJ is very long time given.
Translate to English
Translate to Hindi

6871 views
2

May 22 (10:35)
deepak.yerr~
deepak.yerr~   6203 blog posts
Re# 6072366-4               Past Edits
1 compliments
Useful
This train is a intercity passemger train between SC and Warangal to cater to local travellers it was extended to Bhradrachalam Road as it remains idle during night to provide connection upto Doranakal after Satavahana exp dep not to crowd Godavari Express and demand for stoppages. As distance exceeded 200km they recently converted to express. As it is the traffic after Dorankal wil be less and extending further upto Manguluru is waste as Night SC Manguluru runs with very less occupancy after Bhradrachalam. In return kakatiya passenger used to reach SC at 930 for office goers but after extention they delayed it by 2hrs.As kakatiya alone is not able to coup with rush of travellers MEMU is also introduced. Hope u all understand the history of this for the last 30 yrs for Warangal
Translate to English
Translate to Hindi

5770 views
0

May 22 (11:45)
abdulrazzak123
abdulrazzak123   109 blog posts
Re# 6072366-5               Past Edits
till Lockdown the train served till MUGR as a fast passenger and RSA with a passenger service to KZJ after lockdown the train got short terminated and RSA KZJ passenger is cancelled and this single Manuguru SF is full fledged Occupancy with complete over crowding of GS classes .
Translate to English
Translate to Hindi

4882 views
1

May 22 (13:35)
deepak.yerr~
deepak.yerr~   6203 blog posts
Re# 6072366-6               Past Edits
All express trains have 2 GS and are fully occupied and Manuguru SF is no exception and has good number of sleepers. Is there any need to run another train upto Manuguru? If you feel so proove that SC manuguru express runs with good occupancy upto end.
Translate to English
Translate to Hindi

3162 views
0

May 22 (21:25)
abdulrazzak123
abdulrazzak123   109 blog posts
Re# 6072366-7              
Cutting down its general coaches will hit it so badly as its just a 330km train and the only shortest Dist covering ONT train in the complete zone which barely takes 6 to 7 hours which is supposed to be an ICE train, even though it is managing with 100% occupancy on an average . After the short termination of Kakatiya this MUGR SF started overcrowding. its not something new request the train which was earlier short terminated need to be sent back, thats it "AS KAKATIYA IS UNDER SUSPENSION" from Aug 16th, its just a small hope that it might go back and provide better connectivity just because of kakatiya short termination MUGR KZJ passenger is not re-introduced
Translate to English
Translate to Hindi
General Travel
6841 views
2

May 17 (15:33)   17659/Kakatiya Express
abdulrazzak123
abdulrazzak123   109 blog posts
Entry# 6067090            Tags  
1 compliments
Great
#TB
Translate to English
Translate to Hindi
General Travel
14841 views
4

May 16 (18:51)   17659/Kakatiya Express | SC/Secunderabad Junction (10 PFs)
abdulrazzak123
abdulrazzak123   109 blog posts
Entry# 6065923            Tags   Past Edits
#Admin #Moderator I request the admin to please clear the train Pics as it's mentioned 57625/57626 Which runs between Manuguru Secunderabad Manuguru as a Kakatiya Fast Passenger and no where it's mentioned as 17659/17660 Secunderabad Bhadrachalam Road Secunderabad Kakatiya Express

The exact Pic is uploaded for Delta Express and Secunderabad Repalle Day express which are it's RSA, if there is no appropriate pic is available don't add let it remain
Translate to English
Translate to Hindi
General Travel
34326 views
3

May 16 (18:32)   17659/Kakatiya Express | SC/Secunderabad Junction (10 PFs)
abdulrazzak123
abdulrazzak123   109 blog posts
Entry# 6065916            Tags   Past Edits
1 compliments
Great
RSA change of Kakatiya exp is expected from Aug 16th 2024 reservation suspended from 16th Aug on both the sides
Translate to English
Translate to Hindi

2 Posts

10591 views
1

May 17 (07:34)
abdulrazzak123
abdulrazzak123   109 blog posts
Re# 6065916-3               Past Edits
1 compliments
Useful
It is suspended for RSA change, as per officials their is a chance of rolling stock change from Sleeper Category to 2S category. It might get RSA with Hundry/Bidar/SKZR ICE mostly, if not some other day train
The reason to change RSA is delay caused by Kakatiya is effecting the complete Cycle of Repalle series
Translate to English
Translate to Hindi

7566 views
1

May 17 (15:50)
addicted_rails
addicted_rails   14 blog posts
Re# 6065916-4               Past Edits
RSA of Hundry/Bidar/SKZR ICE regarding bookings is wierd. SC - SKZR - BIDR has bookings for 2S,CC while Hundry has bookings only for 2S and BIDR Hyb runs fully unreserved. Adding Kakatiya to this combo will be a intersting one .
Translate to English
Translate to Hindi

7101 views
0

May 17 (16:31)
abdulrazzak123
abdulrazzak123   109 blog posts
Re# 6065916-5              
That would be something far reasonable RSA, running a day train which is very underrated in sleeper category with 11 reserved SL is ridiculous, changing it 2S category is badly required
Translate to English
Translate to Hindi

7117 views
0

May 17 (16:45)
Exynos9611~   13891 blog posts
Re# 6065916-6              
scr got 10 lwscz coaches from mcf any idea for which train these lhb coaches are
Translate to English
Translate to Hindi

4055 views
0

May 18 (10:33)
SCRrailfan
SCRrailfan   100 blog posts
Re# 6065916-7              
BZA division intercities like pinakini satavahana,also SCR got 2 pantry coaches so intercities with pantry might get lhb,this is my assumption,SCR is unpredictable
Translate to English
Translate to Hindi
Page#    83 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy