If they want to introduce janata express then it should be a 22 coach train with stops at DVS, AKP, Tuni, ANV,Sml, Rjy, TDD, EL, BZA, KMM, WL, KZA, Sc running time should be 6 10 min to BZA 20 min stoppage and 6 hrs to SC so total 12.5hr should have one rake and run thrice to VSP and another to TPt in the same slot. Composition of the train should be 12 second class, 6 sleeper class, 2 3AC , 2 SLr brake vans. The addition of sleeper and 3AC is to make the train viable and get it operational costs just the concept of GR more number of berths and coaches less cost per passenger. WAP4 can haul 24coach train in both routes