Full Site Search  
Wed Aug 23, 2017 08:04:14 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Details Edit
Large TB;
Entry# 971936-0
Details Edit
Large TB;
Entry# 1678692-1
Details Edit
Large TB;
Entry# 1786905-0
Details Edit
Close-up; Large TB; Outside of Train; Standing at Station;
Entry# 2182630-0
Refresh Live Status (25m ago)
 
 

14015/Sadbhavna Express
صدبھاونہ ایکسپریس     सदभावना एक्सप्रेस

RXL/Raxaul Junction --> DEE/Delhi Sarai Rohilla

Updated: Oct 01 2016 (01:14) by Mohd Arif
Oct 01 2016 (01:14)

Train Forum

Page#    134 blog entries  next>>
TRIP HAS ENDED.
Blog  Time-Table
Departure: Wed Jul 26 2017 @ 08:55
14015/Sadbhavna Express
Trip# 113464    Traveller: Mr Wayne😎©®🍺~    Linked PNR Entry# 2362966
Class:
From: GCT/Ghazipur City
To: BSB/Varanasi Junction
5 wishes
HJ With Sadbhavna HJ HJ HJ HJ
TRIP HAS ENDED.
Blog  Time-Table

24 posts - Wed Jul 26, 2017 - are hidden. Click to open.

  
769 views
Jul 26 2017 (13:28)
Mr Wayne😎©®🍺~   2613 blog posts   127 correct pred (74% accurate)
Re# 2362966-25            Tags   Past Edits
at SRNT/Sarnath
again started gaining speed.... Sadbhawna literally on savage today.... fast accleration by EMD

  
760 views
Jul 26 2017 (13:31)
Mr Wayne😎©®🍺~   2613 blog posts   127 correct pred (74% accurate)
Re# 2362966-26            Tags   Past Edits
racing to city..... last level crossing at Ashapur.... Varuna approaching

  
736 views
Jul 26 2017 (13:41)
Mr Wayne😎©®🍺~   2613 blog posts   127 correct pred (74% accurate)
Re# 2362966-27            Tags   Past Edits
approaching city station....after signal clearance.... Kazzakpura crossing had huge traffic jam due to level down

  
736 views
Jul 26 2017 (13:45)
Mr Wayne😎©®🍺~   2613 blog posts   127 correct pred (74% accurate)
Re# 2362966-28            Tags   Past Edits
Gorakhpur LTT waiting at PF3 while we are at PF2

  
716 views
Jul 26 2017 (13:59)
Mr Wayne😎©®🍺~   2613 blog posts   127 correct pred (74% accurate)
Re# 2362966-29            Tags   Past Edits
TRIP HAS ENDED.
leaving varanasi city only....savage ends troll begins here.... NR Charbag at best... seeyaa folks
  
★  Rail Fanning
0 Followers
818 views
Jul 24 2017 (10:09)   14016/Sadbhavana Express | BSB/Varanasi Junction (9 PFs) | TKD/WDP-4D/40263

siddharthanand82^~   12574 blog posts   486 correct pred (77% accurate)
Entry# 2361237            Tags   Past Edits
#RailfanningAtVaranasi
TKD WDP4D in lead of 14016 Sadbhavna Express arriving PF6 of Varanasi Jn.
#SidDNR
  
Info Update
0 Followers
9254 views
Mar 26 2017 (10:37)   12391/Shramjeevi SF Express (PT) | LBA/Lambhua (1 PFs)

siddharthanand82^~   12574 blog posts   486 correct pred (77% accurate)
Entry# 2211150            Tags   Past Edits
Following trains will remain cancelled on various dates between 29/3/17 & 6/4/17 due to Non-Interlocking work at Lambhua, Maharani Pacchim & Koiripur in Varanasi - Lucknow section.

  
8882 views
Mar 26 2017 (10:45)
kshitij~   2838 blog posts   3017 correct pred (76% accurate)
Re# 2211150-1            Tags   Past Edits
Great..
which all section on this route will remain for doubling post this interlocking?

  
8583 views
Mar 26 2017 (23:05)
deathrider24x7~   313 blog posts
Re# 2211150-2            Tags   Past Edits
Chandrauli-adhinpur n koiripur-sri krishn nagar total of 78 km track doubling part is still remaining...

  
8754 views
Mar 26 2017 (23:08)
kshitij~   2838 blog posts   3017 correct pred (76% accurate)
Re# 2211150-3            Tags   Past Edits
I guess post this interlocking work BSB-SLN will be completely doubled and electrified
Only remaining must be between SLN and LKO

  
8530 views
Mar 26 2017 (23:13)
deathrider24x7~   313 blog posts
Re# 2211150-4            Tags   Past Edits
Koiripur-skn 19 km section comes btw sln n bsb..block would be taken afterwards for completing this 19 km doubling work...n after that chandrauli portion...project completion date is march 2018

  
2606 views
Jun 13 2017 (21:38)
moveroshan   1 blog posts   56 correct pred (62% accurate)
Re# 2211150-5            Tags   Past Edits
when is final chart prepared for this train???
  
Predictions: 40
confirm: 38
rac: 2
wl: 0
Journey: Sun Apr 16, 2017 @ 16:15
Class: AC 3-tier - 3A   |   Tot Seats: Avbl >36
Travel: DLI/Old Delhi Junction   to   SIP/Suraimanpur   |   964 km / 1241 km
14016/Sadbhavana Express
Entry# 2164115

Posted by: pintoo   279 blog posts   86 correct pred (84% accurate)
PNR: 265-xxxxxxx   |   Similar PNRs
Posted Status as of: Feb 14 2017 (14:55)
Passenger 1: RAC 3 (Booking Status: RAC 3,GNWL)
Passenger 2: RAC 4 (Booking Status: RAC 4,GNWL)
Passenger 3: RAC 5 (Booking Status: RAC 5,GNWL)
Passenger 4: RAC 6 (Booking Status: RAC 6,GNWL)
Total Fare:  4900
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 16 2017 (14:55)
Passenger 1: B1,44 [LB] (Booking Status: RAC 3,GNWL)
Passenger 2: B1,43 [UB] (Booking Status: RAC 4,GNWL)
Passenger 3: B1,45 [MB] (Booking Status: RAC 5,GNWL)
Passenger 4: RB1 47 (Booking Status: RAC 6,GNWL)
Total Fare:  4900
Chart PREPARED

Full PNR Status History (3 statuses)
Status as of: Apr 16 2017 (11:31)
Passenger 1: B1,44 [LB] (Booking Status: RAC 3,GNWL)
Passenger 2: B1,43 [UB] (Booking Status: RAC 4,GNWL)
Passenger 3: B1,45 [MB] (Booking Status: RAC 5,GNWL)
Passenger 4: RB1 47 (Booking Status: RAC 6,GNWL)
Total Fare:  4900
Chart PREPARED

Status as of: Apr 02 2017 (11:16)
Passenger 1: RAC 2 (Booking Status: RAC 3,GNWL)
Passenger 2: RAC 3 (Booking Status: RAC 4,GNWL)
Passenger 3: RAC 4 (Booking Status: RAC 5,GNWL)
Passenger 4: RAC 5 (Booking Status: RAC 6,GNWL)
Total Fare:  4900
Chart NOT Prepared

Status as of: Feb 14 2017 (15:02)
Passenger 1: RAC 3 (Booking Status: RAC 3,GNWL)
Passenger 2: RAC 4 (Booking Status: RAC 4,GNWL)
Passenger 3: RAC 5 (Booking Status: RAC 5,GNWL)
Passenger 4: RAC 6 (Booking Status: RAC 6,GNWL)
Total Fare:  4900
Chart NOT Prepared


1 posts - Tue Apr 11, 2017

  
3205 views
Apr 15 2017 (20:49)
pintoo   279 blog posts   86 correct pred (84% accurate)
Re# 2164115-2            Tags   Past Edits
Less than 19 hours before the Journey starts. I am really freaking out. What will happen? 😧😧😧😧

  
3233 views
Apr 16 2017 (10:04)
छोटा आदमी~   7375 blog posts   103364 correct pred (90% accurate)
Re# 2164115-3            Tags   Past Edits
Agree with you, not a pleasant view sight seeing tickets in RAC....with summer rush/wedding season rush its gonna be tough to clear...let's see

  
3139 views
Apr 16 2017 (10:17)
pintoo   279 blog posts   86 correct pred (84% accurate)
Re# 2164115-4            Tags   Past Edits
Yes. You r right. To make matters worse , train delayed from source by four hours. AFAIK it will be delayed further.

  
3083 views
Apr 16 2017 (11:55)
pintoo   279 blog posts   86 correct pred (84% accurate)
Re# 2164115-5            Tags   Past Edits
Well, what a wonderful turnout. I think railway knew that we have a child therefore gave one in RAC. It's completely manageable for us although I will try to get it confirmed.

  
632 views
Jul 21 2017 (14:01)
pintoo   279 blog posts   86 correct pred (84% accurate)
Re# 2164115-6            Tags   Past Edits
The one in RAC was cleared top on priority 😁😁😁😁.
Page#    134 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.