Full Site Search  
Thu Aug 24, 2017 01:09:21 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Details Edit
Large TB;
Entry# 1806047-0
Details Edit
Large TB;
Entry# 2056203-0
Details Edit
Large TB;
Entry# 1476113-0
Refresh Live Status (1h 19m ago)
 
 

12735/Secunderabad - Yesvantpur Garib Rath Express
సికింద్రాబాద్ - యశ్వంత్‌పూర్ గరీబ్ రథ్     सिकंदराबाद - यशवंतपुर गरीब रथ एक्सप्रेस

SC/Secunderabad Junction --> YPR/Yesvantpur Junction

Updated: Apr 02 2017 (19:46) by Pran Pratim Ghosh
Apr 02 2017 (19:46)

Train Forum

Page#    737 blog entries  next>>
  
Rail Fanning
0 Followers
634 views
Jul 28 2017 (22:10)   12735/Secunderabad - Yesvantpur Garib Rath Express | RNN/Rajanukunte (2 PFs)

amit singh ™ ♥♪ ♫♥*^~   5250 blog posts   3455 correct pred (75% accurate)
Entry# 2365161            Tags   Past Edits
STUNNING ENTRY - HEAVILY CUGGING ALCOS Hauling Secunderabad Yesvantpur Garib Rath Express!!
Video Link: click here

  
572 views
Jul 29 2017 (00:00)
Guest: 391d11cd   show all posts
Re# 2365161-1            Tags   Past Edits
nice
TRIP HAS ENDED.
Blog  Time-Table

2 posts - Sat Jul 22, 2017 - are hidden. Click to open.

  
1097 views
Jul 22 2017 (17:19)
12752   1704 blog posts   11 correct pred (74% accurate)
Re# 2359680-3            Tags   Past Edits
Happy Journey Swaroop :)

  
958 views
Jul 22 2017 (20:44)
Electrification of whole SCR~   875 blog posts   11 correct pred (52% accurate)
Re# 2359680-4            Tags   Past Edits
Departed Anantapur

  
789 views
Jul 23 2017 (04:23)
Electrification of whole SCR~   875 blog posts   11 correct pred (52% accurate)
Re# 2359680-5            Tags   Past Edits
Reached hafizpet

  
759 views
Jul 23 2017 (05:34)
Electrification of whole SCR~   875 blog posts   11 correct pred (52% accurate)
Re# 2359680-6            Tags   Past Edits
At sc outer now

  
591 views
Jul 23 2017 (12:31)
Electrification of whole SCR~   875 blog posts   11 correct pred (52% accurate)
Re# 2359680-7            Tags   Past Edits
TRIP HAS ENDED.
Trip ended, Arrived Secunderabad station 30min late
  
Rail Fanning
0 Followers
4836 views
May 28 2017 (16:44)   12214/Delhi Sarai Rohilla - Yesvantpur AC Duronto Express | RNN/Rajanukunte (2 PFs) | KJM/WDM-3A/16670

LHB for TN Express~   1094 blog posts   183 correct pred (71% accurate)
Entry# 2297091            Tags   Past Edits
YT link - click here
Awaiting the inevitable change in traction | Trains which currently ply with Diesel links
A look at trains that will pretty soon stop getting diesel locos in the Bengaluru Dharmavaram Guntakal Stretch, with the completion of Bengaluru Guntakal Electrification& and the Guntakal Wadi by pass stretch on the verge of completion, the trains shown in this video are the ones likely to get e loco first!
Please
...
more...
do watch and share your thoughts!
  
General Travel
1 Followers
2809 views
Jul 03 2017 (23:31)   12735/Secunderabad - Yesvantpur Garib Rath Express

Soumya Banerjee   119 blog posts
Entry# 2341313            Tags   Past Edits
Any idea when this train would start getting electric traction from end to end (SC-YPR), now that SBC Rajdhani which travels on the same route is getting(GZB WAP-7)?

1 posts - Mon Jul 03, 2017

64 posts - Tue Jul 04, 2017

3 posts - Wed Jul 05, 2017

  
1049 views
Jul 05 2017 (17:50)
❤️ ⚡ WAP5™ ⚡ ❤️   6909 blog posts   278 correct pred (91% accurate)
Re# 2341313-72            Tags   Past Edits
These are the links SBC Rajdhani has been getting end-to-end :-
Day 1 : LGD WAP7 30452
Day 2 : GZB WAP7 30228
Day 3 : GZB WAP7 30244 (failed at SC) + LGD WAP7 30275 (till SBC)
Day
...
more...
4 : TKD WAP7 30395
GZB is not regular yet! But before July, LGD was the fixed link.

  
1031 views
Jul 05 2017 (17:53)
Bye CRB and bye Prabhu^~   84585 blog posts   5303 correct pred (78% accurate)
Re# 2341313-73            Tags   Past Edits
GZB has huge shortag of p7....

  
957 views
Jul 05 2017 (21:04)
❤️ ⚡ WAP5™ ⚡ ❤️   6909 blog posts   278 correct pred (91% accurate)
Re# 2341313-75            Tags   Past Edits
Yes. GZB doesn't have sufficient passenger locos.
At the same time LGD is getting HOG-capable locos, which might be used with Rajdhanis.
But for now, it will keep getting random links.

  
932 views
Jul 06 2017 (12:34)
SLA   1077 blog posts
Re# 2341313-76            Tags   Past Edits
Yesterday I have seen 22692 behind GZB WAP7 crossing HTCY (Hitech City) around 19.15hrs, but couldn't note the number.

  
772 views
Jul 08 2017 (03:15)
The train not taken~   2650 blog posts
Re# 2341313-78            Tags   Past Edits
It's a mixed bag. P5 requires more rigorous maintenance for it's gear box as that is the component most prone to failure. On perfect track conditions, this would not be a big issue, but since our track conditions are less than perfect, the 3-stage gear box requires rigorous maintenance. On the other hand, because the motors are bogie-suspended in the P5, they would require less rigorous maintenance than the traction motors in other locos. Also, other than the gear box, all other components will have lesser wear-and-tear for a P5 compared to a P7.
  
General Travel
0 Followers
1064 views
Jun 24 2017 (12:01)   12735/Secunderabad - Yesvantpur Garib Rath Express

highvoltageeee2k3~   293 blog posts
Entry# 2331308            Tags   Past Edits
I feel like that 12735 YPR GARIB RATH should be rerouted from guntakal to bellari tumkur?
What do you folks think anyways guntakal to bangalore we have many trains.
How many hours extra will it add do you think?

  
1050 views
Jun 24 2017 (12:02)
highvoltageeee2k3~   293 blog posts
Re# 2331308-1            Tags   Past Edits
anyways with the current timings it is not having great patronage why not increase number of stops in karnataka for a better patronage?
Page#    737 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.