Run this train via BIDR with LR at KLBG. An extra 68 kms will be taken with 2 hrs running time. So that Bidar will have connectivity to UBL..
This can by-pass GDG and HG, a 30 min time may be saved. RSA with DR train can be removed and run as independent train with 2 Rakes.
UBL(20.00)_KLBG(4.55/5.10)_BIDR(8.00/8.05)_HYD(11.30/15.50)_BIDR(19.20/19.25)_KLBG(22.00/22.10)_UBL(8.00)PM
please wait...Translate to EnglishYo bro, let's reroute this train via Bidar with a layover at Kulbargi. It's gonna add an extra 68 kilometers and 2 hours to the journey, but it will connect Bidar to Hubli. This way, we can skip Gudgeri and Hulgur, which might save us around 30 minutes. Also, we can separate it from the DR train and let it roll with 2 separate sets of carriages.
Hubli (8:00 PM)_ Kulbargi (4:55/5:10 AM)_ Bidar (8:00/8:05 AM)_ Hyderabad (11:30/3:50 PM)_ Bidar (7:20/7:25 PM)_ Kulbargi (10:00/10:10 PM)_ Hubli(8:00)PM
please wait...Translate to HindiBidar se UBL ke liye Jana hai Kya? Bas extra 68 km aur 2 ghante lagega. GDG aur HG ko chhodke seedha BIDR se UBL!