Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

There is no more pure joy than RailFanning.

Search Trains
Post PNR

Rake sharing with MGR Chennai Central Coimbatore Kovai SF Express
Entry# 5728756-80
no description available
Entry# 5762623-2


Availability Calendar
Search SHU to KPD
Return# 12640
PDF Download

12639/Brindavan Express
बृन्दावन एक्सप्रेस

SHU/Sholinghur --> KPD/Katpadi Junction

Updated: Apr 26 (11:00) by BangaloreMail^~
Apr 26 (11:00)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
Compare with the Shortest Route between Sholinghur and Katpadi Jn.
Travel Time: 0h 43m     1 halts
Distance: 40 km     Avg Speed: 55 km/hr
Max Permissible Speed: 130 km/hr between PER/Perambur and JTJ/Jolarpettai Junction
Departs @ 08:50
Sholinghur/SHU 
Platform# 1
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 09:33
KPD/Katpadi Jn 
Platform# 1
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: SuperFast
Rake Zone: SR/Southern
Latest News
(You need to double-check/verify this info yourself)
🔹Train no. 12639/Brindavan Express W.E.F. 08/12/2023 will be restored to depart from MGR Chennai Central at 07:40hrs as per normal schedule.
Fri Dec 08, 2023 (07:44AM)
News History
🔹Due to the ongoing Michaung cyclone, Train no. 12639/Brindavan Express W.E.F. 06/12/2023 will be fully cancelled until further official notice.
Wed Dec 06, 2023 (06:04AM)
🔹Train no. 12639/Brindavan Express JCO 05/12/2023 will be fully cancelled due to the ongoing Michaung cyclone.
Mon Dec 04, 2023 (07:49PM)
Due to Non-Interlocking works for track machine siding and existing yard arrangements at Kuppam Station, Train No. 12639 Dr. MGR Chennai Central – KSR Bengaluru Daily Superfast Express commencing journey from Dr. MGR Chennai Central o­n 13.07.2022 will be partially cancelled between Jolarpettai and KSR Bengaluru and it will be short...
more...
terminated at Jolarpettai.
Tue Jul 12, 2022 (07:57PM)
Train No. 12639 Dr. MGR Chennai Central – KSR Bengaluru Daily Superfast Express commencing journey from Dr. MGR Chennai Central o­n 13.07.2022 will be partially cancelled between Jolarpettai and KSR Bengaluru and it will be short terminated at Jolarpettai.
Tue Jul 12, 2022 (05:46PM)
To be converted into LHB rake w.e.f 12 - 08 - 2021. Revised Coach Composition:. 02 - AC CHAIRCARs,13 - NON AC CHAIRCARs, 04 - GENERAL SECONDCLASS, 01 - PANTRY CAR & 02 - EOG
Thu Jul 08, 2021 (10:57PM)
2 Follows
Rating: 4.0/5 (84 votes)
cleanliness - good (15)
punctuality - excellent (15)
food - good (12)
ticket avbl - good (13)
u/r coach - average (9)
railfanning - good (15)
safety - good (14)
Bedroll/Linen: NOT Available change
Inaugural Run
Thu Oct 01, 1964
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
Idly vada, Pongal vada, masala dosa, Veg cutlet, Sweet Boli, Samosa,...
more...
mirchi bhajji, tomato soup, Sundal, tea/ coffee etc. available from pantry.; E-Catering is Available at MAS, KPD, VN, KJM, BNC & SBC
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
D13
  5
D12
  6
D11
  7
D10
  8
 D9
  9
 PC
 18
 C2
 17
 D1
 16
 D2
 15
 D3
 14
 D4
 13
 D5
 12
 D6
 11
 D7
 10
 D8
 19
 C1
 20
 GS
 21
 GS
 22
EOG
RSA - Rake Sharing
12675/12676. PM at BBQ.


Show ALL intermediate Stations

1 halts. 6 intermediate Stations between Sholinghur and Katpadi Junction
#1
-90.0 km
/==/
Zone: SR
PF# 3,4
Speed: 78
Elev: 3m

07:40
Day: 1
68.6 km
30 intermediate stations
00:53
#2
-21.4 km
/==/
Zone: SR
PF# 1
Speed: 99
Elev: 85m
08:33
08:35
Day: 1
21.4 km
4 intermediate stations
00:13
#3
0.0 km
/==/
Zone: SR
PF# 1
Speed: 50
Elev: 129m
08:48
08:50
Day: 1
14.9 km
2 intermediate stations
00:18
#4
14.9 km
/==/
Zone: SR
PF# 1
Speed: 64
Elev: 176m
09:08
09:10
Day: 1
24.6 km
3 intermediate stations
00:23
#5
39.5 km
/==/
Zone: SR
PF# 1
Speed: 78
Elev: 215m
09:33
09:35
Day: 1
Remote Location Quota Starting and Charting Station
52.1 km
8 intermediate stations
00:40
#6
91.6 km
/==/
Zone: SR
PF# 3
Speed: 74
Elev: 332m
10:15
10:17
Day: 1
16.1 km
1 intermediate stations
00:13
#7
107.7 km
/==/
Zone: SR
PF# 3
Speed: 31
Elev: 355m
10:30
10:32
Day: 1
16.3 km
1 intermediate stations
00:31
#8
124.0 km
/==/
Zone: SR
PF# 1
Speed: 76
Elev: 400m
11:03
11:05
Day: 1
40.6 km
4 intermediate stations
00:32
#9
164.6 km
/==/
Zone: SWR
PF# 2
Speed: 73
Elev: 682m
11:37
11:38
Day: 1
34.2 km
4 intermediate stations
00:28
#10
198.8 km
/==/
Zone: SWR
PF# 3
Speed: 85
Elev: 810m
12:06
12:08
Day: 1
56.4 km
10 intermediate stations
00:40
#11
255.2 km
%≡≡%
Zone: SWR
PF# 4
Speed: 31
Elev: 904m
12:48
12:50
Day: 1
9.4 km
4 intermediate stations
00:18
#12
264.6 km
%≡≡%
Zone: SWR
PF# 1
Speed: 9
Elev: 920m
13:08
13:10
Day: 1
4.3 km
0 intermediate stations
00:30
#13
268.9 km
/==/
Zone: SWR
PF# 1

Elev: 897m
13:40

Day: 1
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy