Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

अपनी संपूर्ण क्रांति, राजधानी से कम है के 🔥- Arjun Rai

Search Gallery
Post PNR
Medium; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 4602980-0
Large TB; EOG/SLR; Outside of Train; Passing Station;
Entry# 5514126-0


Availability Calendar
Search BSB to NDLS
Return# 12382
PDF Download

12381/Poorva Express (Via Gaya) (PT)
Other Names: Deluxe Express
पूर्वा एक्सप्रेस (गया के रास्ते)

BSB/Varanasi Junction --> NDLS/New Delhi

Updated: Jan 13 (03:48) by jishnuthakur12301^~
Jan 13 (03:48)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Picture & Video Gallery

Page#    430 Pic/Video Blogs  <<prev  next>>

12381/Poorva Express (Via Gaya)


53385 views
5

POORVA EXPRESS (VIA GAYA) DIVERTEDपूर्वा एक्सप्रेस (वाया गया) का मार्ग परिवर्तनপূর্বা এক্সপ্রেস (ভায়া গয়া) ট্রেনের যাত্রাপথ পরিবর্তন
×

12381/Poorva Express (Via Gaya)


53385 views
5

POORVA EXPRESS (VIA GAYA) DIVERTEDपूर्वा एक्सप्रेस (वाया गया) का मार्ग परिवर्तनপূর্বা এক্সপ্রেস (ভায়া গয়া) ট্রেনের যাত্রাপথ পরিবর্তন
×

12381/Poorva Express (Via Gaya)


53385 views
5

POORVA EXPRESS (VIA GAYA) DIVERTEDपूर्वा एक्सप्रेस (वाया गया) का मार्ग परिवर्तनপূর্বা এক্সপ্রেস (ভায়া গয়া) ট্রেনের যাত্রাপথ পরিবর্তন
×

12381/Poorva Express (Via Gaya)

HWH/Howrah Junction


271959 views
3

Regulation of train by 45 minutes over Eastern Railway due to power block over Dhanbad Division.
×

73707 views
0

1 km from @PBZ   on time@PBZ: Porabazar &51 km/h xing p7 hauled #12381: Poorva Express
×

12381/Poorva Express (Via Gaya)

BWNU/Barddhaman UP Yard


153492 views
7

Poorva Express meets Malda Howrah Intercity over world's longest short brick viaduct...Baman Viaduct.This viaduct was completed in 1856 supervised by Mr. Nafarchandra Kundu. Situated between Gangpur and Barddhaman, it is a marvelous example of early engineering. No concrete is used. Foundation is also made up of brick and by inverted arch the whole weight distributed equally. Total 280 arch with 6 meters each and a one meter wall between them and with the both end parts ...it is 2.01 km by length and was constructed at cost of €20,000. It is made for passing the overflowed water of Banka river which...
×

12381/Poorva Express (Via Gaya)

BWNU/Barddhaman UP Yard


153492 views
7

Poorva Express meets Malda Howrah Intercity over world's longest short brick viaduct...Baman Viaduct.This viaduct was completed in 1856 supervised by Mr. Nafarchandra Kundu. Situated between Gangpur and Barddhaman, it is a marvelous example of early engineering. No concrete is used. Foundation is also made up of brick and by inverted arch the whole weight distributed equally. Total 280 arch with 6 meters each and a one meter wall between them and with the both end parts ...it is 2.01 km by length and was constructed at cost of €20,000. It is made for passing the overflowed water of Banka river which...
×

12381/Poorva Express (Via Gaya)

BWNU/Barddhaman UP Yard


153492 views
7

Poorva Express meets Malda Howrah Intercity over world's longest short brick viaduct...Baman Viaduct.This viaduct was completed in 1856 supervised by Mr. Nafarchandra Kundu. Situated between Gangpur and Barddhaman, it is a marvelous example of early engineering. No concrete is used. Foundation is also made up of brick and by inverted arch the whole weight distributed equally. Total 280 arch with 6 meters each and a one meter wall between them and with the both end parts ...it is 2.01 km by length and was constructed at cost of €20,000. It is made for passing the overflowed water of Banka river which...
×

12381/Poorva Express (Via Gaya)

BWNU/Barddhaman UP Yard


153492 views
7

Poorva Express meets Malda Howrah Intercity over world's longest short brick viaduct...Baman Viaduct.This viaduct was completed in 1856 supervised by Mr. Nafarchandra Kundu. Situated between Gangpur and Barddhaman, it is a marvelous example of early engineering. No concrete is used. Foundation is also made up of brick and by inverted arch the whole weight distributed equally. Total 280 arch with 6 meters each and a one meter wall between them and with the both end parts ...it is 2.01 km by length and was constructed at cost of €20,000. It is made for passing the overflowed water of Banka river which...
×

12381/Poorva Express (Via Gaya)

BWNU/Barddhaman UP Yard


153492 views
7

Poorva Express meets Malda Howrah Intercity over world's longest short brick viaduct...Baman Viaduct.This viaduct was completed in 1856 supervised by Mr. Nafarchandra Kundu. Situated between Gangpur and Barddhaman, it is a marvelous example of early engineering. No concrete is used. Foundation is also made up of brick and by inverted arch the whole weight distributed equally. Total 280 arch with 6 meters each and a one meter wall between them and with the both end parts ...it is 2.01 km by length and was constructed at cost of €20,000. It is made for passing the overflowed water of Banka river which...
×

12381/Poorva Express (Via Gaya)

GAYA/Gaya Junction


30989 views
2

12381/ Poorva Express || Howrah - New Delhi !!!
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy