Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

হাওড়া - বর্দ্ধমান কর্ড লাইনে যান, 130 কিমি বেগে ট্রেন যাওয়াও কালবৈশাখী ঝড়ের থেকে ভয়ঙ্কর! - Jishnu Thakur

Search Gallery
Post PNR
Close-up; Front-facing; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Chennai mail large tb clearly visible
Entry# 5591036-0
no description available
Entry# 5695853-0


Availability Calendar
Search KPD to SBC
Return# 12658
PDF Download

12657/MGR Chennai Central - KSR Bengaluru Mail (PT)
एम. जी. आर. चेन्नै सेंट्रल - क्रा सं रा बेंगलुरु मेल

KPD/Katpadi Junction --> SBC/KSR Bengaluru City Junction (Bangalore)

Updated: Oct 01 2023 (08:30) by BangaloreMail^~
Oct 01 2023 (08:30)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Picture & Video Gallery

Page#    105 Pic/Video Blogs  <<prev  next>>

12657/MGR Chennai Central - KSR Bengaluru Mail


21368 views
0

Pic 1: a) Mail arrive SBC past Line completion (May 1864) at 5:30 PM (Earlier practice followed: MAS-TPT Ord convey Mail for SBC/Bellary/Bombay)b) Mail received from MAS side at 7:30 AM past line commenced 1 Aug 1864 (MAS-CBE/Beypore Arr SBC @ 7 AM in 1868)Pic 2: Travelogue 12 Feb 1867 click here SBC-MAS Arrival at 9 AM (Beypore/CBE-MAS Arr MAS @ 8:40 AM in 1868)Kindly amend TL to 1 Aug 1864 as Inauguration.
×

12657/MGR Chennai Central - KSR Bengaluru Mail


21368 views
0

Pic 1: a) Mail arrive SBC past Line completion (May 1864) at 5:30 PM (Earlier practice followed: MAS-TPT Ord convey Mail for SBC/Bellary/Bombay)b) Mail received from MAS side at 7:30 AM past line commenced 1 Aug 1864 (MAS-CBE/Beypore Arr SBC @ 7 AM in 1868)Pic 2: Travelogue 12 Feb 1867 click here SBC-MAS Arrival at 9 AM (Beypore/CBE-MAS Arr MAS @ 8:40 AM in 1868)Kindly amend TL to 1 Aug 1864 as Inauguration.
×

12657/MGR Chennai Central - KSR Bengaluru Mail


24897 views
1

click here 1869 IR Bradshaw Map (Page 428) show no Rail Link for JTJ-BNC. State Railways never show in British India Map (Gaekwar's Baroda State Railway dont show in Map which was active in that Era)!! BNC-JTJ MG was Mysore State owned whose BG Portion wasnt even under construction (as RC-GY & Nilgiri Portion can be seen under construction)!! No through SBC Mail even in 1869-70.SUR-HYB Portion show as it belong to GIP (HYB-SDB/WADI was Nizam's Rail which hasnt commenced in 1869)
×

12657/MGR Chennai Central - KSR Bengaluru Mail


23811 views
1

click here BNC-JTJ 1862 Line built & run by Mysore State as a part to connect Mysore with Madras (MYS State always built MG). The first train which was termed Bangalore Mail was MG which provide link to MAS-TPT Train (MG to BG) & this in no situation is the current SBC-MAS Mail (Even link to commensurate 150 Years of Service highlights 149 Kms BNC-JTJ run by Mail) !!Madras Railway finished BG Royapuram-SBC in 1879 (probably BNC-JTJ finished in 1868). As per attached Pic, JTJ-BNC BG work was given to Madras Railway past completion of BNC-JTJ MG!!
×

12657/MGR Chennai Central - KSR Bengaluru Mail


12588 views
0

Is this the mail in 1864?? 1. MAS-TPT Ord: MAS 11:30 TPT 13:19 * 2. JTJ - BNC Ord: JTJ 13:30 BNC 17:30Does this got any connection with the real MAS-SBC GD in 1864 which become Mail later on:1. Ord: MAS Dep 7:00 am, JTJ 13:05/13:45, BNC Slip18:302. GD/Mail: MAS 17:00, JTJ 1:30/1:50 BNC Slip 7:00
×

12657/MGR Chennai Central - KSR Bengaluru Mail


38230 views
1

The document shows MAS-BNC was connected only in 1869 (although JTJ-BNC got connected in 1864). There is no chance for MAS-SBC Mail to run through or Sectional Carriage & JTJ-BNC is too small to run Mail Service!!I tried to find the reason but failed as if BNC-JTJ was MG in start or if it was missing alignment from 1864-1869!!Pic 2: No Through Train/Coach till Dec 1864 for MAS-BNC!! Only in 1868-69 Through Train shows MAS-Beypore use to tow MAS-BNC & BNC-CBE Ordinary. This Inaugural Date needs to be corrected (year 1868-69 is sure) & i invite vital information about the same!!...
×

12657/MGR Chennai Central - KSR Bengaluru Mail


38230 views
1

The document shows MAS-BNC was connected only in 1869 (although JTJ-BNC got connected in 1864). There is no chance for MAS-SBC Mail to run through or Sectional Carriage & JTJ-BNC is too small to run Mail Service!!I tried to find the reason but failed as if BNC-JTJ was MG in start or if it was missing alignment from 1864-1869!!Pic 2: No Through Train/Coach till Dec 1864 for MAS-BNC!! Only in 1868-69 Through Train shows MAS-Beypore use to tow MAS-BNC & BNC-CBE Ordinary. This Inaugural Date needs to be corrected (year 1868-69 is sure) & i invite vital information about the same!!...
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy