Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal Android   RailCal iPhone

site support

The train is a small world moving through a larger world - Niraj Kumar

Search Gallery
Post PNR
Medium; Side View; Small TB; UnReserved; Outside of Train; Standing at Station;
Entry# 5476063-8
no description available
Entry# 5912044-0


Availability Calendar
Search MBDP to BSBS
Return# 15107
PDF Download

14220⇒15108/Lucknow - Banaras Intercity Express
लखनऊ - बनारस इंटरसिटी एक्सप्रेस

MBDP/MBDD Pratapgarh Junction --> BSBS/Banaras

Updated: Oct 02 2023 (11:11) by Prateek_BSB^~
Oct 02 2023 (11:11)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Picture & Video Gallery

Page#    47 Pic/Video Blogs  <<prev  next>>

14004/New Delhi - Malda Town Express


1037093 views
32

It's has been decide that the following train shell on run electric traction on Northern railway system on re interactions #Nr
×

14004/New Delhi - Malda Town Express


1037093 views
32

It's has been decide that the following train shell on run electric traction on Northern railway system on re interactions #Nr
×

15108/Lucknow - Banaras Intercity Express

RBL/Rae Bareli Junction

ABR/WDG-4/70137


44563 views
12

A visit to Raebareli jnNow Pf#3 and a adjacent loop line is electrified (Not charged)Captures are in following ways:-Pic (1)- ABR WDG4 #70137 resting at RBLPic (2)- ABR WDG4D #70701 resting at RBLPic (3)- Showing Electrification at PF#3 and loop line + LKO WDG3A #14823 with 14220 LKO BSB intercityPic (4)- Electrification at PF#3
×

15108/Lucknow - Banaras Intercity Express

RBL/Rae Bareli Junction

ABR/WDG-4/70137


44563 views
12

A visit to Raebareli jnNow Pf#3 and a adjacent loop line is electrified (Not charged)Captures are in following ways:-Pic (1)- ABR WDG4 #70137 resting at RBLPic (2)- ABR WDG4D #70701 resting at RBLPic (3)- Showing Electrification at PF#3 and loop line + LKO WDG3A #14823 with 14220 LKO BSB intercityPic (4)- Electrification at PF#3
×

15108/Lucknow - Banaras Intercity Express

RBL/Rae Bareli Junction

ABR/WDG-4/70137


44563 views
12

A visit to Raebareli jnNow Pf#3 and a adjacent loop line is electrified (Not charged)Captures are in following ways:-Pic (1)- ABR WDG4 #70137 resting at RBLPic (2)- ABR WDG4D #70701 resting at RBLPic (3)- Showing Electrification at PF#3 and loop line + LKO WDG3A #14823 with 14220 LKO BSB intercityPic (4)- Electrification at PF#3
×

15108/Lucknow - Banaras Intercity Express

RBL/Rae Bareli Junction

ABR/WDG-4/70137


44563 views
12

A visit to Raebareli jnNow Pf#3 and a adjacent loop line is electrified (Not charged)Captures are in following ways:-Pic (1)- ABR WDG4 #70137 resting at RBLPic (2)- ABR WDG4D #70701 resting at RBLPic (3)- Showing Electrification at PF#3 and loop line + LKO WDG3A #14823 with 14220 LKO BSB intercityPic (4)- Electrification at PF#3
×

14207/Padmavat Express

MBDP/MBDD Pratapgarh Junction


90843 views
12

Pratapgarh Junction प्रतापगढ़ जंक्शन (PBH)Work Status Report (01-11-2019)• Electrification of single section 95% (LKO - PBH - BSB)• Doubling:-UTR - SGAR 1oo% SAGR - HCP 90%HCP - RBL 65%RBL - JAIS 70%JAIS - AME 85%
×

14207/Padmavat Express

MBDP/MBDD Pratapgarh Junction


90843 views
12

Pratapgarh Junction प्रतापगढ़ जंक्शन (PBH)Work Status Report (01-11-2019)• Electrification of single section 95% (LKO - PBH - BSB)• Doubling:-UTR - SGAR 1oo% SAGR - HCP 90%HCP - RBL 65%RBL - JAIS 70%JAIS - AME 85%
×

14207/Padmavat Express

MBDP/MBDD Pratapgarh Junction


90843 views
12

Pratapgarh Junction प्रतापगढ़ जंक्शन (PBH)Work Status Report (01-11-2019)• Electrification of single section 95% (LKO - PBH - BSB)• Doubling:-UTR - SGAR 1oo% SAGR - HCP 90%HCP - RBL 65%RBL - JAIS 70%JAIS - AME 85%
×

14207/Padmavat Express

MBDP/MBDD Pratapgarh Junction


90843 views
12

Pratapgarh Junction प्रतापगढ़ जंक्शन (PBH)Work Status Report (01-11-2019)• Electrification of single section 95% (LKO - PBH - BSB)• Doubling:-UTR - SGAR 1oo% SAGR - HCP 90%HCP - RBL 65%RBL - JAIS 70%JAIS - AME 85%
×

14207/Padmavat Express

MBDP/MBDD Pratapgarh Junction


90843 views
12

Pratapgarh Junction प्रतापगढ़ जंक्शन (PBH)Work Status Report (01-11-2019)• Electrification of single section 95% (LKO - PBH - BSB)• Doubling:-UTR - SGAR 1oo% SAGR - HCP 90%HCP - RBL 65%RBL - JAIS 70%JAIS - AME 85%
×

14207/Padmavat Express

MBDP/MBDD Pratapgarh Junction


90843 views
12

Pratapgarh Junction प्रतापगढ़ जंक्शन (PBH)Work Status Report (01-11-2019)• Electrification of single section 95% (LKO - PBH - BSB)• Doubling:-UTR - SGAR 1oo% SAGR - HCP 90%HCP - RBL 65%RBL - JAIS 70%JAIS - AME 85%
×

14207/Padmavat Express

MBDP/MBDD Pratapgarh Junction


90843 views
12

Pratapgarh Junction प्रतापगढ़ जंक्शन (PBH)Work Status Report (01-11-2019)• Electrification of single section 95% (LKO - PBH - BSB)• Doubling:-UTR - SGAR 1oo% SAGR - HCP 90%HCP - RBL 65%RBL - JAIS 70%JAIS - AME 85%
×

14207/Padmavat Express

MBDP/MBDD Pratapgarh Junction


90843 views
12

Pratapgarh Junction प्रतापगढ़ जंक्शन (PBH)Work Status Report (01-11-2019)• Electrification of single section 95% (LKO - PBH - BSB)• Doubling:-UTR - SGAR 1oo% SAGR - HCP 90%HCP - RBL 65%RBL - JAIS 70%JAIS - AME 85%
×

15108/Lucknow - Banaras Intercity Express

RBL/Rae Bareli Junction

LKO/WDM-3A


11283 views
2

Raebareli Junction........14220 Lucknow varanasi intercity...@pf3
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy