Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

पश्चिम रेलवे की शान, पश्चिम सुपरफास्ट एक्सप्रेस मेरी जान - Abdul Rehman

Search Gallery
Post PNR
Medium; Side View; Small TB; EOG/SLR; Outside of Train; Standing;
Entry# 4418093-0
Medium; Small TB; Sleeper;
Entry# 5195826-0


Availability Calendar
Search ATP to GDV
Return# 17211
PDF Download

17212/Kondaveedu Express (PT)
कोन्डवीडु एक्सप्रेस

ATP/Anantapur --> GDV/Gudivada Junction

Updated: May 06 (16:55) by IndianRailwaysSCoR^~
May 06 (16:55)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Picture & Video Gallery

Page#    131 Pic/Video Blogs  <<prev  next>>

17212/Kondaveedu Express

MKL/Makalidurga


4006 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


4006 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


4006 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


4006 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


4006 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


4006 views
10

Yelahanka to Doddaballapura is also targetted this year, but very little done.Just a Km or so of track laid before DBU. Rest from YNK just the same status of land levelled and left.
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express

MKL/Makalidurga


61880 views
22

Makalidurga to Devarapalle doubling along with electrification, is the target for this year.-The work is going on and is in various stages of completion. -The wiring is done at many parts of the section and at some places just the poles.In the entire section, the newly laid rail is being replaced by a new one and the black painting of the sides is going on. All the stations have got 2 PFs and new station buildings are being constructed too as part of doubling.At Devarapalle, the existing PF at rail level is abandoned and 2 new ones are built.--Updated PF...
×

17212/Kondaveedu Express


2807 views
1

Departed...ET 22883 P4
×

17212/Kondaveedu Express


2168 views
0

18464 Prashanti with 22323 OR BZA
×

17212/Kondaveedu Express

YPR/Yesvantpur Junction


5808 views
8

at yesvantpur
×
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy