Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

बिहार संपर्क क्रांति : मिथिला पेंटिंग की सुंदरता और तेज रफ्तार - Keshav Singh

Search Trains
Post PNR




Availability Calendar
Search LTT to BUI
Return# 11072
PDF Download

11071/Kamayani Express (PT)
कामायनी एक्सप्रेस

LTT/Mumbai LTT --> BUI/Ballia

Updated: Jul 16 (12:33) by Kumaon_Tiger^~
Jul 16 (12:33)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips


Other Trains in the News
The Shortest Route between LTT and BUI is 168 km (9%) shorter.
Travel Time: 32h 45m     47 halts
Distance: 1773 km     Avg Speed: 54 km/hr
Max Permissible Speed: 130 km/hr between KNW/Khandwa Junction and BINA/Bina Junction
Departs @ 13:50
Mumbai LTT/LTT 
Platform# 1,4
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 22:35 +1 night
BUI/Ballia 
Platform# 4
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: Mail/Express
Rake Zone: CR/Central
Latest News
(You need to double-check/verify this info yourself)
लोकमान्य तिलक टर्मिनस से 17 से 20 अक्टूबर, 2024 तक चलने वाली 11071 लोकमान्य तिलक टर्मिनस-बलिया एक्सप्रेस निर्धारित मार्ग बीना-कटनी मुड़वारा-मानिकपुर-प्रयाग-वाराणसी जं. के स्थान पर परिवर्तित मार्ग बीना-वीरांगना लक्ष्मीबाई झांसी-भीमसेन-कानपुर सेंट्रल-लखनऊ (उत्तर रेलवे)-जंघई-वाराणसी जं. के रास्ते चलाई जायेगी।
Sat Oct 12, 2024 (04:22PM)
News History
लोकमान्य तिलक टर्मिनस से 17 एवं 18 अक्टूबर, 2024 को चलने वाली 12165 लोकमान्य तिलक टर्मिनस-गोरखपुर जं. एक्सप्रेस निर्धारित मार्ग इटारसी-मानिकपुर-प्रयाग-वाराणसी जं. के स्थान पर परिवर्तित मार्ग इटारसी-बीना-वीरांगना लक्ष्मीबाई झांसी-भीमसेन-कानपुर सेंट्रल-लखनऊ (उत्तर रेलवे)-वाराणसी जं. के रास्ते चलाई जायेगी।
Sat Oct 12, 2024 (01:03PM)
J.C.O 27/08/2024 Instead of the scheduled route ET-BPL-BINA-SGO-DMO-KMZ the diverted route ET-JBP-KTE will be run. ■ AC 3 Tier will be replaced by 1 General w.e.f. 15 November 2024. 🔹 Revised Compostion w.e.f. 15 November 2024 will be SLR - 1, EOG - 1, GS - 4, SL - 9,...
more...
AC 3 - 6, AC 2 - 1. Total 22 LHB Coaches.
Mon Aug 26, 2024 (12:52PM)
🔹 1 AC 3 Tier will be replaced by 1 General w.e.f. 15 November 2024. 🔹 Revised Compostion w.e.f. 15 November 2024 will be SLR - 1, EOG - 1, GS - 4, SL - 9, AC 3 - 6, AC 2 - 1. Total 22 LHB Coaches.
Sun Jul 14, 2024
...
more...
(12:42PM)
J.C.O 25/7/2024 and 9/7/2024 Instead of the scheduled route KTE-BINA-BPL the diverted route KTE-JBP-ET-BPL will be run. Rail block being taken from for rail doubling on Malkhedi – Mahadevkhedi section.
Sat Jun 15, 2024 (08:47PM)
🔸 Extended to Ballia will Originate from New Originating Station That is Ballia from 10 December 2023. 🔸 Revised Coach Composition: LSLRD: 1, GS: 3, EOG: 1, AC III Tier: 7, AC II Tier: 1 & LSCN: 9 = 22 LHB Coaches WEF 02.03.2024 Ex. LTT.
Sat Dec 09, 2023 (10:49PM)
🔸 Extended to Ballia from 10 December 2023. 🔸 Revised Coach Composition: LSLRD - 1, LWS - 3, LWLRRM - 1, LWACCN - 7, LWACCW - 1 & LSCN - 9 =22 LHB Coaches WEF 02/03/2024 Ex. LTT.
Sat Dec 09, 2023 (10:27PM)
गाड़ी संख्या 11071 मुंबई लोकमान्य तिलक टर्मिनस -बनारस कामायनी एक्सप्रेस दिनांक 27.11.2023 से 09.12.2023 तक परिवर्तित मार्ग वाया इटारसी-जबलपुर-कटनी होते हुए गंतव्य को जाएगी। Revised Coach Composition: LSLRD - 1, LWS - 3, LWLRRM - 1, LWACCN - 7, LWACCW - 1 & LSCN - 9 =22 LHB Coaches WEF...
more...
02/03/2024 Ex. LTT.
Sun Nov 26, 2023 (12:52PM)
गाड़ी संख्या 11071 मुंबई लोकमान्य तिलक टर्मिनस -बनारस कामायनी एक्सप्रेस दिनांक 27.11.2023 से 09.12.2023 तक परिवर्तित मार्ग वाया इटारसी-जबलपुर-कटनी होते हुए गंतव्य को जाएगी।
Sun Nov 26, 2023 (12:50PM)
Revised Coach Composition: LSLRD - 1, LWS - 3, LWLRRM - 1, LWACCN - 7, LWACCW - 1 & LSCN - 9 =22 LHB Coaches WEF 02/03/2024 Ex. LTT.
Sun Nov 19, 2023 (07:41PM)
लोकमान्य तिलक टर्मिनस-बनारस कामायनी एक्सप्रेस 15 से 27 अक्टूबर तक अपने निर्धारित मार्ग के बजाय परिवर्तित मार्ग वाया इटारसी-जबलपुर-कटनी होते हुए गंतव्य को जाएगी।
Wed Oct 11, 2023 (11:03AM)
🔹TRAIN NO. 11071 (LOKMANYATILAK TERMINUS - BANARAS) JCO-28.06.2023 WILL BE DIVERTED VIA BINA - AGASOD - LALITPUR KHAJURAHO
Thu Jun 29, 2023 (02:27PM)
Will terminate at BSBS (Banaras) JCO w.e.f 10-07-2022
Sat Jul 02, 2022 (11:18AM)
गाड़ी सं.11071 लोकमान्य तिलक (ट.)-वाराणसी, यात्रा प्रारंभ करने की तिथि 29.05.2022 को अपने निर्धारित मार्ग मानिकपुर -प्रयागराज -प्रयाग-वाराणसी के स्थान पर परिवर्तित मार्ग मानिकपुर -प्रयागराज छिवकी-अवॉइडिंग केबिन-वाराणसी के रास्ते चलेगी|
Wed May 25, 2022 (01:35PM)
📢 Due to Pre NI/NI work in Katni-Bina section of JBP Div. of WCR, JCF 03.04.2022 to 10.04.2022 will be diverted via Itarsi-Jabalpur-Katni...
Fri Apr 01, 2022 (04:04AM)
Revised Coach Composition W.E.F 01.02.2022 Ex LTT 2 Tier AC (2A) -1, 3 Tier AC (3A) -5, 3 Tier AC Economy (3E) -1, Sleeper(SL) -10, General (2S) -3, Power Car -2 .
Mon Jan 31, 2022 (10:15PM)
➡️ JCF 15.11.21 is operating with Regular Number.
Mon Nov 15, 2021 (01:54PM)
6 Follows
Rating: 3.1/5 (147 votes)
cleanliness - good (26)
punctuality - average (25)
food - average (21)
ticket avbl - average (26)
u/r coach - average (16)
railfanning - good (24)
safety - good (25)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Fri Oct 02, 1998
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 GS
  3
 GS
  4
 S8
  5
 S7
  6
 S6
  7
 S5
  8
 S4
  9
 S3
 18
 B2
 17
 B3
 16
 B4
 15
 B5
 14
 B6
 13
 B7
 12
 A1
 11
 S1
 10
 S2
 19
 B1
 20
 GS
 21
 GS
 22
SLR
PRYJ
Revised Compostion w.e.f. 01 December 2024 will be SLR - 1, EOG - 1, GS - 4, SL - 8, AC 3 - 6, AC 2 - 2. Total 22 LHB Coaches.
RSA - Rake Sharing
Total 4 Rakes With PM @ LTT ; No RSA.


Show ALL intermediate Stations

47 halts. 264 intermediate Stations between Mumbai LTT and Ballia
#1
0.0 km
/==/
Zone: CR
PF# 1,4
Speed: 55
Elev: 6m

13:50
Day: 1
16.5 km
8 intermediate stations
00:18
#2
16.5 km
/==/
Zone: CR
PF# 7
Speed: 49
Elev: 7m
14:08
14:10
Day: 1
18.1 km
9 intermediate stations
00:22
#3
34.6 km
/==/
Zone: CR
PF# 4
Speed: 48
Elev: 9m
14:32
14:35
Day: 1
81.6 km
14 intermediate stations
01:42
#4
116.1 km
/==/
Zone: CR
PF# 1,2
Speed: 67
Elev: 599m
16:17
16:22
Day: 1
Bankers Detached.
50.6 km
6 intermediate stations
00:45
#5
166.7 km
/==/
Zone: CR
PF# 2
Speed: 107
Elev: 551m
17:07
17:10
Day: 1
Remote Location Quota Starting and Charting Station
48.3 km
5 intermediate stations
00:27
#6
215.1 km
/==/
Zone: CR
Speed: 74
Elev: 595m
17:37
17:38
Day: 1
24.7 km
2 intermediate stations
00:20
#7
239.7 km
/==/
Zone: CR
PF# 2
Speed: 89
Elev: 558m
17:58
18:00
Day: 1
Pooled Quota Location
25.3 km
3 intermediate stations
00:17
#8
265.1 km
/==/
Zone: CR
PF# 1
Speed: 101
Elev: 464m
18:17
18:18
Day: 1
42.0 km
5 intermediate stations
00:25
#9
307.1 km
/==/
Zone: CR
PF# 2
Speed: 75
Elev: 244m
18:43
18:45
Day: 1
44.9 km
4 intermediate stations
00:36
#10
352.0 km
%≡≡%
Zone: CR
PF# 3
Speed: 68
Elev: 258m
19:21
19:23
Day: 1
47.7 km
4 intermediate stations
00:42
#11
399.7 km
/==/
Zone: CR
PF# 3
Speed: 38
Elev: 209m
20:05
20:07
Day: 1
24.1 km
2 intermediate stations
00:38
#12
423.9 km
/==/
Zone: CR
Speed: 57
Elev: 205m
20:45
20:50
Day: 1
34.2 km
6 intermediate stations
00:36
#13
458.0 km
/==/
Zone: CR
PF# 1
Speed: 87
Elev: 243m
21:26
21:27
Day: 1
20.4 km
1 intermediate stations
00:14
#14
478.4 km
/==/
Zone: CR
PF# 2
Speed: 51
Elev: 267m
21:41
21:43
Day: 1
26.3 km
2 intermediate stations
00:31
#15
504.7 km
/==/
Zone: CR
PF# 1
Speed: 41
Elev: 289m
22:14
22:15
Day: 1
42.7 km
7 intermediate stations
01:02
#16
547.4 km
/==/
Zone: CR
PF# 2
Speed: 66
Elev: 302m
23:17
23:20
Day: 1
45.4 km
4 intermediate stations
00:41
#17
592.8 km
/==/
Zone: WCR
PF# 2
Speed: 97
Elev: 283m
00:01
00:02
Day: 2
30.7 km
2 intermediate stations
00:19
#18
623.5 km
/==/
Zone: WCR
PF# 2
Speed: 100
Elev: 278m
00:21
00:23
Day: 2
31.8 km
4 intermediate stations
00:19
#19
655.2 km
/==/
Zone: WCR
PF# 2
Speed: 53
Elev: 341m
00:42
00:44
Day: 2
75.6 km
11 intermediate stations
01:26
#20
730.8 km
/==/
Zone: WCR
PF# 1
Speed: 64
Elev: 329m
02:10
02:20
Day: 2
18.1 km
3 intermediate stations
00:17
#21
748.9 km
/==/
Zone: WCR
PF# 1
Speed: 55
Elev: 303m
02:37
02:39
Day: 2
67.6 km
8 intermediate stations
01:14
#22
816.5 km
/==/
Zone: WCR
PF# 1,3
Speed: 25
Elev: 496m
03:53
03:55
Day: 2
6.2 km
0 intermediate stations
00:15
#23
822.7 km
/==/
Zone: WCR
PF# 3
Speed: 91
Elev: 405m
04:10
04:15
Day: 2
53.4 km
7 intermediate stations
00:35
#24
876.1 km
/==/
Zone: WCR
PF# 1
Speed: 99
Elev: 429m
04:50
04:52
Day: 2
39.5 km
4 intermediate stations
00:24
#25
915.6 km
/==/
Zone: WCR
PF# 1
Speed: 48
Elev: 417m
05:16
05:18
Day: 2
Xing with 12628/Karnataka Express | Daily
45.8 km
6 intermediate stations
00:57
#26
961.4 km
/==/
Zone: WCR
PF# 3
Speed: 69
Elev: 411m
06:15
06:20
Day: 2
21.8 km
2 intermediate stations
00:19
#27
983.1 km
/==/
Zone: WCR
PF# 2
Speed: 66
Elev: 458m
06:39
06:40
Day: 2
52.8 km
5 intermediate stations
00:48
#28
1035.9 km
/==/
Zone: WCR
PF# 1
Speed: 71
Elev: 513m
07:28
07:30
Day: 2
Remote Location Quota Starting and Charting Station
50.9 km
5 intermediate stations
00:43
#29
1086.9 km
/==/
Zone: WCR
PF# 2
Speed: 68
Elev: 384m
08:13
08:15
Day: 2
26.1 km
1 intermediate stations
00:23
#30
1113.0 km
/==/
Zone: WCR
PF# 2
Speed: 71
Elev: 366m
08:38
08:40
Day: 2
15.4 km
1 intermediate stations
00:13
#31
1128.4 km
/==/
Zone: WCR
PF# 2
Speed: 75
08:53
08:55
Day: 2
Experimental halt for 6 months W.E.F. 06/10/2023 to 02/04/2024
93.8 km
11 intermediate stations
01:15
#32
1222.2 km
/==/
Zone: WCR
PF# 1
Speed: 67
Elev: 381m
10:10
10:20
Day: 2
64.5 km
8 intermediate stations
00:58
#33
1286.7 km
/==/
Zone: WCR
PF# 1
Speed: 53
Elev: 353m
11:18
11:20
Day: 2
35.5 km
2 intermediate stations
00:40
#34
1322.2 km
/==/
Zone: WCR
PF# 3
Speed: 74
Elev: 315m
12:00
12:05
Day: 2
Remote Location Quota Starting and Charting Station
40.7 km
5 intermediate stations
00:33
#35
1362.9 km
/==/
Zone: WCR
Speed: 37
Elev: 360m
12:38
12:40
Day: 2
36.9 km
5 intermediate stations
01:00
#36
1399.8 km
/==/
Zone: NCR
PF# 2
Speed: 71
Elev: 243m
13:40
13:45
Day: 2
22.5 km
1 intermediate stations
00:19
#37
1422.3 km
/==/
Zone: NCR
PF# 2
Speed: 46
Elev: 199m
14:04
14:05
Day: 2
77.3 km
11 intermediate stations
01:40
#38
1499.6 km
/==/
Zone: NCR
PF# 8
Speed: 16
Elev: 97m
15:45
16:10
Day: 2
Rake Reversal (the train reverses direction)
36.5 km
5 intermediate stations
01:00
#39
1536.0 km
%==%
Zone: NR
PF# 1
Speed: 52
Elev: 95m
17:10
17:11
Day: 2
23.2 km
2 intermediate stations
00:27
#40
1559.2 km
/==/
Zone: NR
PF# 1
Speed: 83
17:38
17:43
Day: 2
15.1 km
1 intermediate stations
00:11
#41
1574.4 km
/==/
Zone: NR
PF# 2
Speed: 58
Elev: 92m
17:54
17:55
Day: 2
Xing with 11108/Bundelkhand Express | Daily
15.4 km
1 intermediate stations
00:16
#42
1589.7 km
/==/
Zone: NR
PF# 1
Speed: 51
Elev: 89m
18:11
18:13
Day: 2
8.4 km
0 intermediate stations
00:10
#43
1598.2 km
/==/
Zone: NR
PF# 1
Speed: 58
Elev: 88m
18:23
18:24
Day: 2
13.5 km
1 intermediate stations
00:14
#44
1611.6 km
/==/
Zone: NR
PF# 1
Speed: 30
Elev: 86m
18:38
18:39
Day: 2
16.8 km
1 intermediate stations
00:33
#45
1628.4 km
/==/
Zone: NR
Speed: 11
Elev: 81m
19:12
19:13
Day: 2
5.8 km
1 intermediate stations
00:32
#46
1634.2 km
/==/
Zone: NR
PF# 2,3
Speed: 42
Elev: 77m
19:45
19:55
Day: 2
35.2 km
5 intermediate stations
00:50
#47
1669.3 km
/==/
Zone: NER
PF# 3,4
Speed: 68
Elev: 79m
20:45
20:50
Day: 2
39.4 km
6 intermediate stations
00:35
#48
1708.7 km
/==/
Zone: NER
PF# 2
Speed: 60
Elev: 74m
21:25
21:30
Day: 2
64.8 km
10 intermediate stations
01:05
#49
1773.5 km
/==/
Zone: NER
PF# 4

Elev: 65m
22:35

Day: 2


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy