Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailFanning is a gift you give yourself. - Varun

Search Trains
Post PNR




Medium; Side View; Large TB; Outside of Train; Standing at Station;
Entry# 2214180-0
Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 2506906-1


Availability Calendar
Search PNVL to NED
Return# 17614
PDF Download

17613/Panvel - Hazur Sahib Nanded Express
पनवेल - हजूर साहिब नान्देड एक्सप्रेस

PNVL/Panvel Junction --> NED/Hazur Sahib Nanded

Updated: Aug 02 (17:46) by Jayashree^
Aug 02 (17:46)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips


Other Trains in the News
The Shortest Route between PNVL and NED is 88 km (13%) shorter.
Travel Time: 16h 45m     15 halts
Distance: 675 km     Avg Speed: 40 km/hr
Max Permissible Speed: 110 km/hr
Departs @ 16:00
Panvel Junction/PNVL 
Platform# 6
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 08:45 +1 night
NED/Hazur Sahib Nanded 
Platform# --
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: Mail/Express
Rake Zone: SCR/South Central
Latest News
(You need to double-check/verify this info yourself)
Cancelled till Aug 01, 2024 due to non-interlocking works at Daund
Mon Jul 29, 2024 (11:59AM)
News History
Experimental Halt provided at Barsi Town (BTW) for a period of 6 months WEF Journey Commencing from 26.08.2023. Timings: 23:03 / 23:05.
Fri Aug 25, 2023 (02:39PM)
JCO 5.8.2022 to 9.8.2022 will Short Originate from Kurduwadi.
Fri Jul 29, 2022 (04:45PM)
T,no. 17613 PNVL-NED express leaving PNVL from 26/05/2022 to 29/05/2022 is PARTIALLY CANCELLED between PNVL and KWV. Train will SHORT ORIGINATE from KURDUVADI due to block in Solapur division.
Tue May 24, 2022 (07:31PM)
JCO 15/10/2021 till 28/10/2021 is diverted via PUNE - MRJ - KWV - LTRR
Fri Oct 15, 2021 (03:00PM)
2 Follows
Rating: 3.8/5 (86 votes)
cleanliness - good (15)
punctuality - good (15)
food - good (11)
ticket avbl - good (15)
u/r coach - good (13)
railfanning - good (15)
safety - good (15)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sun Jul 03, 2011
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✓ E-Catering
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 UR
  3
 S5
  4
 S4
  5
 S3
  6
 S2
  7
 S1
  8
SE1
  9
BE1
PRLI
 17
EOG
 16
 UR
 15
HE1
 14
 A1
 13
 B1
 12
 B2
 11
 B3
 10
BE2


Show ALL intermediate Stations

15 halts. 98 intermediate Stations between Panvel Junction and Hazur Sahib Nanded
#1
0.0 km
%==%
Zone: CR
PF# 6
Speed: 35
Elev: 12m

16:00
Day: 1
28.3 km
3 intermediate stations
00:48
#2
28.3 km
%==%
Zone: CR
PF# 2
Speed: 33
Elev: 52m
16:48
16:50
Day: 1
Bankers Attached.
27.8 km
5 intermediate stations
00:51
#3
56.1 km
/==/
Zone: CR
PF# 1,2
Speed: 68
Elev: 623m
17:41
17:43
Day: 1
Bankers Detached.
29.6 km
5 intermediate stations
00:26
#4
85.7 km
/==/
Zone: CR
PF# 1
Speed: 56
Elev: 621m
18:09
18:10
Day: 1
17.8 km
5 intermediate stations
00:19
#5
103.4 km
/==/
Zone: CR
PF# 2
Speed: 22
Elev: 574m
18:29
18:30
Day: 1
16.4 km
5 intermediate stations
00:45
#6
119.8 km
/==/
Zone: CR
PF# 4,6
Speed: 53
Elev: 560m
19:15
19:20
Day: 1
Remote Location Quota Starting And Charting Station.
75.5 km
15 intermediate stations
01:25
#7
195.2 km
/==/
Zone: CR
PF# 3
Speed: 68
Elev: 515m
20:45
20:50
Day: 1
108.2 km
12 intermediate stations
01:35
#8
303.4 km
/==/
Zone: CR
PF# 3,4
Speed: 68
Elev: 511m
22:25
22:30
Day: 1
37.3 km
4 intermediate stations
00:33
#9
340.7 km
/--/
Zone: CR
Speed: 30
Elev: 510m
23:03
23:05
Day: 1
36.0 km
2 intermediate stations
01:12
#10
376.7 km
/--/
Zone: CR
PF# 1
Speed: 41
Elev: 679m
00:17
00:20
Day: 2
79.1 km
9 intermediate stations
01:55
#11
455.8 km
/--/
Zone: CR
PF# 1
Speed: 40
Elev: 618m
02:15
02:20
Day: 2
33.0 km
2 intermediate stations
00:50
#12
488.7 km
/--/
Zone: SCR
PF# 1,2
Speed: 32
Elev: 639m
03:10
03:30
Day: 2
Rake Reversal (the train reverses direction)
63.1 km
6 intermediate stations
02:00
#13
551.8 km
/--/
Zone: SCR
Speed: 71
Elev: 455m
05:30
05:50
Day: 2
Rake Reversal (the train reverses direction)
Loco change from electric to diesel
29.6 km
2 intermediate stations
00:25
#14
581.4 km
/--/
Zone: SCR
Speed: 61
Elev: 381m
06:15
06:16
Day: 2
34.3 km
3 intermediate stations
00:34
#15
615.8 km
/--/
Zone: SCR
Speed: 47
Elev: 412m
06:50
06:52
Day: 2
28.4 km
2 intermediate stations
00:36
#16
644.2 km
/==/
Zone: SCR
Speed: 24
Elev: 382m
07:28
07:30
Day: 2
30.4 km
3 intermediate stations
01:15
#17
674.6 km
/==/
Zone: SCR

Elev: 362m
08:45

Day: 2


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy