Full Site Search  
Mon Aug 21, 2017 12:14:51 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train Pic
Details Edit
Large TB;
Entry# 1600726-0
Details Edit
Large TB;
Entry# 1771888-0
Details Edit
Large TB;
Entry# 1974983-0
Details Edit
Large TB;
Entry# 1325663-0
Refresh Live Status (5h 7m ago)
 
 

12185/Rewanchal Express (PT)
     रीवांचल एक्सप्रेस

HBJ/Bhopal HabibGanj --> REWA/Rewa (Terminal)

Updated: May 10 2017 (12:37) by RF Shanku^~
May 10 2017 (12:37)
This is the Shortest Route between HBJ and REWA.
Travel Time: 10h 0m     13 halts
Distance: 555 km     Avg Speed: 56 km/hr
Max Permissible Speed: 110 km/hr between BPL/Bhopal Junction and BINA/Bina Junction
Departs @ 22:00
(Avg 2m late)
Bhopal HabibGanj/HBJ 
Platform# 2
SMTWTFS
Arrives @ 08:00 +1 night
(Avg 4m late)
Rewa (Terminal)/REWA 
Platform# 2
SMTWTFS
Type: SuperFast
Zone: WCR/West Central
Latest News
(You need to double-check/verify this info yourself)
1. augmented one SL Coach on 1st & 02nd May,2017
Sat Apr 29, 2017 (08:55AM)
Rating: 4.7/5 (54 votes)
cleanliness - excellent (10)
punctuality - excellent (11)
food - excellent (6)
ticket avbl - good (11)
u/r coach - good (8)
railfanning - excellent (8)
safety - excellent (8)
Inaugural Run
Thu Jan 01, 1998
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✓ E-Catering
Recently included in the IRCTC E-Catering list
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 S1
  4
 S2
  5
 S3
  6
 S4
  7
 S5
  8
 S6
  9
 S7
 18
 B3
 17
 B2
 16
 B1
 15
S13
 14
S12
 13
S11
 12
S10
 11
 S9
 10
 S8
 19
 A1
 20
 A2
 21
 H1
 22
 GS
 23
SLR
RSA - Rake Sharing
No Rake Sharing.; ISO Certified Train; 2 Dedicated rakes.

Show ALL intermediate Stations

Time-Table has Changed. Show Changes
No Speed Change.
#1
/==/

0.0 km
HBJ» Bhopal HabibGanj»   Zone: WCR
PF# 2   Day: 1   Spd: 37   Elev: 496m

22:00 +2
6.2 km1 intermediate stations00:10
#2
/==/

6.2 km
XO
BPL Bhopal Junction   Zone: WCR
PF# 3   Day: 1   Spd: 89   Elev: 498m
22:10 +11
22:15 +12
53.6 km7 intermediate stations00:36
#3
/==/

59.8 km
BHS Vidisha   Zone: WCR
PF# 1   Day: 1   Spd: 82   Elev: 431m
22:51 +20
22:53 +20
39.5 km4 intermediate stations00:29
#4
/==/

99.3 km
BAQ Ganj Basoda   Zone: WCR
PF# 1   Day: 1   Spd: 90   Elev: 417m
23:22 +20
23:24 +20
28.4 km4 intermediate stations00:19
#5
/==/

127.7 km
MABA Mandi Bamora   Zone: WCR
PF# 1   Day: 1   Spd: 30   Elev: 413m
23:43 +24
23:45 +25
17.4 km1 intermediate stations00:35
#6
/==/

145.1 km
BINA Bina Junction   Zone: WCR
PF# 3   Day: 2   Spd: 57   Elev: 413m
00:20 +9
00:25 +10
21.8 km2 intermediate stations00:23
#7
/==/

166.9 km
KYE Khurai   Zone: WCR
PF# 1   Day: 2   Spd: 70   Elev: 440m
00:48 +28
00:50 +28
52.8 km5 intermediate stations00:45
#8
/==/

219.7 km
X
SGO Saugor   Zone: WCR
PF# 2   Day: 2   Spd: 69   Elev: 519m
01:35 +25
01:40 +24
50.9 km5 intermediate stations00:44
#9
/==/

270.6 km
X
PHA Patharia   Zone: WCR
PF# 1   Day: 2   Spd: 65   Elev: 384m
Xing with 11072/Kamayani Express | Daily
Xing with 18507/Hirakud (Hirakund) Express | Sun,Wed,Sat
02:24 +23
02:26 +23
26.1 km1 intermediate stations00:24
#10
/==/

296.7 km
X
DMO Damoh   Zone: WCR
PF# 2   Day: 2   Spd: 64   Elev: 365m
02:50 +25
02:52 +25
110.8 km13 intermediate stations01:53
#11
/--/

407.6 km
X
KTE Katni Junction   Zone: WCR
PF# 3   Day: 2   Spd: 79   Elev: 388m

Loco change : Electric to diesel
04:45 +26
05:00 +38
62.9 km5 intermediate stations00:48
#12
%==%

470.5 km
X
MYR Maihar   Zone: WCR
PF# 1   Day: 2   Spd: 66   Elev: 353m
05:48 +39
05:50 +39
14.3 km0 intermediate stations00:13
#13
%==%

484.8 km
UHR Unchhera   Zone: WCR
PF# 1   Day: 2   Spd: 42   Elev: 333m
06:03 +38
06:05 +38
21.2 km1 intermediate stations00:30
#14
%==%

506.0 km
X
STA Satna Junction   Zone: WCR
PF# 2   Day: 2   Spd: 39   Elev: 322m
06:35 +27
06:45 +30
49.2 km5 intermediate stations01:15
#15
%--%

555.2 km
REWA• Rewa (Terminal)•   Zone: WCR
PF# 2   Day: 2     Elev: 307m
08:00 +4
Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.