Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

हम उस देश के वासी हैं, जिस देश में Shiv Ganga दौड़ती है

Search Trains
Post PNR
Availability Calendar
Search MALM to KLBG
Return# 22231
PDF Download

22232/SMVT Bengaluru - Kalaburagi Vande Bharat Express
सर एम. विश्वेश्वरय्या टर्मिनल बेंगलूरु - कलबुरगि वंदे भारत एक्सप्रेस

MALM/Mantralayam Road --> KLBG/Kalaburagi Junction (Gulbarga)

Updated: Apr 18 (12:49) by HarshaI22159^~
Apr 18 (12:49)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
This is the Shortest Route between MALM and KLBG.
Travel Time: 3h 14m     1 halts
Distance: 173 km     Avg Speed: 54 km/hr
Max Permissible Speed: 130 km/hr between XX-GTLC/Guntakal Chord Cabin and WADI/Wadi Junction
Departs @ 20:16
Mantralayam Road/MALM 
Platform# --
Sun
Mon
Tue
Wed
 
Fri
Sat
Arrives @ 23:30
KLBG/Kalaburagi Jn 
Platform# 1
Sun
Mon
Tue
Wed
 
Fri
Sat
Type: Vande Bharat
Rake Zone: CR/Central
First Departure: Fri Mar 15, 2024 from SMVB/SMVT Bengaluru
Latest News
(You need to double-check/verify this info yourself)
🔹Train no. 22232/SMVT Bengaluru - Kalaburagi Vande Bharat Express JCO 10/04/2024 has been rescheduled to depart from SMVT Bengaluru by 60 mins (01 hr Delay) and will depart at 03:40PM instead of 02:40PM due to line/power block for the insertion and removal of a temporary girder at Level Crossing number...
more...
54 between Devarapalli and Hindupur railway stations.
Wed Apr 10, 2024 (06:42AM)
News History
JCO 03.4.24 , 22232 SMVT Bengaluru - Kalaburagi Vande Bharat Rescheduled for *60Mins From SMVT Bengaluru on 03 April.
Tue Apr 02, 2024 (10:23AM)
22232 SMVT Bengaluru - Kalburagi Vande Bharat Bookings will start from 14.03.24 08:00am onwards.
Wed Mar 13, 2024 (08:28PM)
0 Follows
Rating: 5.0/5 (6 votes)
cleanliness - excellent (1)
punctuality - excellent (1)
food - excellent (1)
ticket avbl - excellent (1)
railfanning - excellent (1)
safety - excellent (1)
Bedroll/Linen: NOT Available
Inaugural Run
Tue Mar 12, 2024
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is available at YNK, ATP, GTL, RC & KLBG.
LHB Rake

Rake/Coach Position

  0
 C1
  1
 C2
  2
 E1
  3
 C3
  4
 C4
  5
 C5
  6
 C6
  7
 C7
7 Chair Car , 1 Executive Chair Car - Total 8 Car Vande Bharat Rake.
RSA - Rake Sharing
No RSA🔹 PM @SMVB With RBPC🔸 OEM @KLBG 🔹; Note - PM @SMVB Will Be Done Only Until Electrified Pitline Is Completely Developed at KLBG.
Loco

Show ALL intermediate Stations

1 halts. 21 intermediate Stations between Mantralayam Road and Kalaburagi Junction (Gulbarga)
#1
-374.9 km
/==/
Zone: SWR
PF# 1
Speed: 38
Elev: 910m

14:40
Day: 1
17.7 km
5 intermediate stations
00:28
#2
-357.2 km
/==/
Zone: SWR
PF# 1
Speed: 63
Elev: 906m
15:08
15:10
Day: 1
196.5 km
21 intermediate stations
02:48
#3
-160.7 km
/==/
Zone: SCR
PF# 1
Speed: 68
Elev: 342m
17:58
18:00
Day: 1
67.8 km
8 intermediate stations
01:00
#4
-92.9 km
/==/
Zone: SCR
PF# 3
Speed: 80
Elev: 451m
19:00
19:05
Day: 1
92.9 km
11 intermediate stations
01:10
#5
0.0 km
/==/
Zone: SCR
Speed: 60
Elev: 332m
20:15
20:16
Day: 1
28.9 km
3 intermediate stations
00:29
#6
28.9 km
/==/
Zone: SCR
Speed: 47
Elev: 407m
20:45
20:47
Day: 1
144.4 km
17 intermediate stations
02:43
#7
173.3 km
/==/
Zone: CR
PF# 1

Elev: 454m
23:30

Day: 1
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy