Yeh dil maange more (RailFans, while ending their trip) - Kirti Solanki

Search Trains
Post PNR
Small TB; Sleeper; Outside of Train;
Taken on 17/09/2022. At GCT.
Entry# 5479254-0
Medium; Night Pic; Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 5573948-0


Availability Calendar
Search CPR to LJN
Return# 15054
PDF Download

15053/Chhapra - Lucknow Jn. Express
छपरा - लखनऊ जं. एक्सप्रेस

CPR/Chhapra Junction --> LJN/Lucknow Junction NER

Updated: Jan 01 (02:19) by shanzil.kabir^~
Jan 01 (02:19)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between CPR and LJN is 84 km (16%) shorter.
Travel Time: 13h 0m     13 halts
Distance: 536 km     Avg Speed: 41 km/hr
Max Permissible Speed: 110 km/hr
Departs @ 19:35
CPR/Chhapra Jn 
Platform# 1
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Arrives @ 08:35 +1 night
LJN/Lucknow Jn NER 
Platform# 1,3
Sun
Mon
Tue
Wed
Thu
Fri
Sat
Type: Mail/Express
Rake Zone: NER/North Eastern
Latest News
(You need to double-check/verify this info yourself)
Will remain cancelled every Wednesday, Thursday, Sunday and Monday till 6th Feb 2025.
Thu Dec 12, 2024 (09:31AM)
News History
🔹Will Short Terminate at Gomtinagar from 19 August 2024 to 17 September 2024 and will remain cancelled between Gomtinagar and Lucknow Junction.
Fri Aug 16, 2024 (11:07AM)
🔹 Revised Compostion w.e.f. 21 November 2024 will be SLR - 1, EOG - 1, GS - 4, SL - 6, AC 3E - 4, AC 3 - 3, AC 2 - 2, AC 1 - 1. Total 22 LHB Coaches.
Sat Jul 13, 2024 (03:18PM)
🔹 Revised Compostion w.e.f. 23 November 2024 will be SLR - 1, EOG - 1, GS - 4, SL - 6, AC 3E - 4, AC 3 - 3, AC 2 - 2, AC 1 - 1. Total 22 LHB Coaches.
Sat Jul 13, 2024 (03:07PM)
🔹Train no. 15053/Chhapra - Lucknow Jn. Express JCO 12/12/2023 to 16/01/2024 will be fully cancelled.
Sat Dec 09, 2023 (05:17PM)
Will Remain Cancelled Due To Yard Remodeling At BSB From 20/09/23 TO 15/10/23
Sat Aug 26, 2023 (12:24AM)
➡️ Will remain cancelled on every Tuesday, Wednesday, Saturday and Sunday from 03.12.2022 to 01.03.2022 ➡️ Will run with LHB Coaches w.e.f. 19 December 2022. Composition - 1 EOG, 3 GS, 8 SL, 6 3A, 2 2A, 1 SLR = 21 LHB Coaches.
Sat Dec 17, 2022 (08:10PM)
Will run with LHB Coaches w.e.f. 19 December 2022. Composition - 1 EOG, 3 GS, 8 SL, 6 3A, 2 2A, 1 SLR = 21 LHB Coaches.
Mon Dec 12, 2022 (08:27PM)
➡️ J.C.O 25.07.2022 to 30.07.2022 will be diverted via Chhapra - Siwan - Gorakhpur - Mankapur - Ayodhya. ➡️ J.C.O 31.07.2022 to 05.08.2022 will remain cancelled.
Mon Jul 25, 2022 (07:34AM)
Will run with eloco end to end W.E.F. 24/05/2022
Tue May 24, 2022 (10:13AM)
Will run end to end with Electric traction between LJN-CPR-LJN w.e.f - 25.04.2022 Ex CPR.
Thu Apr 21, 2022 (03:25PM)
वाराणसी मंडल बलिया-सहतवार खंड के दोहरीकरण के कारण 15053 छपरा-लखनऊ एक्सप्रेस 13 से 19 मार्च तक रद्द I
Thu Mar 10, 2022 (06:56PM)
दिनांक 04.03.2022 से कोच D7 और D8 अनारक्षित होंगे
Wed Dec 15, 2021 (05:30PM)
◉ JCF 04.12.21 to 03.03.22 will remain cancelled because of operational difficulties due to dense foggy conditions.
Fri Oct 08, 2021 (08:03PM)
1 Follows
Rating: 3.5/5 (30 votes)
cleanliness - good (6)
punctuality - good (6)
food - average (5)
ticket avbl - good (5)
u/r coach - good (4)
railfanning - good (4)
safety - good (4)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sun Mar 01, 2015
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✓ E-Catering
E-Catering is available at CPR.
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 GS
  5
 GS
  6
 S1
  7
 S2
  8
 S3
  9
 S4
 18
 M4
 17
 M3
 16
 M2
 15
 M1
 14
 B3
 13
 B2
 12
 B1
 11
 S6
 10
 S5
 19
 A1
 20
 A2
 21
 H1
 22
EOG
RSA - Rake Sharing
No RSA with PM @ LJN/NER

Show ALL intermediate Stations

TT has CHANGED. Updated: Jan 01 (02:19)
Compare with Old TT
13 halts. 86 intermediate Stations between Chhapra Junction and Lucknow Junction NER
#1
0.0 km
/==/
Zone: NER
PF# 1
Speed: 62
Elev: 58m

19:35
Day: 1
29.1 km
4 intermediate stations
00:28
#2
29.1 km
/==/
Zone: NER
PF# 1
Speed: 56
Elev: 61m
20:03
20:05
Day: 1
Xing with 15160/Sarnath Express | Daily
37.1 km
5 intermediate stations
00:40
#3
66.2 km
/==/
Zone: NER
PF# 1
Speed: 72
Elev: 65m
20:45
20:50
Day: 1
31.3 km
4 intermediate stations
00:26
#4
97.5 km
/==/
Zone: NER
Speed: 118
Elev: 72m
21:16
21:18
Day: 1
13.7 km
1 intermediate stations
00:07
#5
111.2 km
/==/
Zone: NER
PF# 1
Speed: 46
Elev: 74m
21:25
21:27
Day: 1
19.8 km
3 intermediate stations
00:26
#6
130.9 km
/==/
Zone: NER
PF# 1
Speed: 76
Elev: 74m
21:53
21:55
Day: 1
39.4 km
6 intermediate stations
00:31
#7
170.3 km
/==/
Zone: NER
PF# 1,2
Speed: 29
Elev: 79m
22:26
22:28
Day: 1
35.2 km
5 intermediate stations
01:12
#8
205.5 km
/==/
Zone: NR
PF# 5
Speed: 62
Elev: 77m
23:40
23:50
Day: 1
Remote Location Quota Starting and Charting Station.
57.6 km
11 intermediate stations
00:56
#9
263.1 km
%==%
Zone: NR
PF# 1
Speed: 48
Elev: 89m
00:46
00:48
Day: 2
33.4 km
4 intermediate stations
00:42
#10
296.5 km
/==/
Zone: NR
PF# 1,2
Speed: 42
Elev: 90m
01:30
01:35
Day: 2
97.9 km
10 intermediate stations
02:21
#11
394.4 km
/==/
Zone: NR
PF# 2,3
Speed: 19
Elev: 98m
03:56
03:58
Day: 2
7.0 km
1 intermediate stations
00:22
#12
401.5 km
/==/
Zone: NR
PF# 1
Speed: 37
04:20
04:25
Day: 2
119.4 km
16 intermediate stations
03:14
#13
520.9 km
/==/
Zone: NER
PF# 1,2
Speed: 22
Elev: 117m
07:39
07:41
Day: 2
4.3 km
0 intermediate stations
00:12
#14
525.2 km
/==/
Zone: NER
PF# 2
Speed: 17
Elev: 117m
07:53
07:56
Day: 2
11.2 km
3 intermediate stations
00:39
#15
536.5 km
/--/
Zone: NER
PF# 1,3

Elev: 121m
08:35

Day: 2
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy