Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Kolkata Local - আমি তোমাকে ভালবাসি

Search Trains
Post PNR


Availability Calendar
Search BIDR to CSMT
Return# 22143
PDF Download

22144/Bidar - Mumbai CSMT SF Express (PT)
बीदर - मुम्बई छत्रपति शिवाजी महाराज टर्मिनस सुपरफास्ट एक्सप्रेस

BIDR/Bidar --> CSMT/Mumbai CSM Terminus

Updated: Nov 12 (21:35) by HarshaI22159^~
Nov 12 (21:35)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips


Other Trains in the News
The Shortest Route between BIDR and CSMT is 23 km (3%) shorter.
Travel Time: 12h 5m     13 halts
Distance: 674 km     Avg Speed: 56 km/hr
Max Permissible Speed: 110 km/hr between SVJR/Shivajinagar and LNL/Lonavla
Departs @ 19:50
Bidar/BIDR 
Platform# 1
Sun
 
 
 
Thu
 
Sat
Arrives @ 07:55 +1 night
CSMT/Mumbai CSM Trm 
Platform# 13
Sun
Mon
 
 
 
Fri
 
Type: SuperFast
Rake Zone: CR/Central
Latest News
(You need to double-check/verify this info yourself)
Augmentation of 2 additional 3 tier AC coaches and 1 additional 2 tier AC coach o­n permanent basis from Bidar with effect from 05.12.2024 . Revised composition : 1 First AC, 2 AC-II Tier, 4 AC- III Tier, 8 Sleeper Class, 4 General Second Class including 2 Luggage cum Guards Brake...
more...
Vans. (21 Coaches)
Wed Nov 27, 2024 (11:12PM)
News History
• JCO 15.02.2204 is Partially Cancelled from Dadar (DR) to Chhatrapati Shivaji Maharaj Terminus (CSMT). Now it will terminate at its new Destination: Dadar (DR).
Thu Feb 15, 2024 (04:39PM)
22144 Bidar-Mumbai Express will been permanently augmented with First AC Coach with effect from 13.01.2024 Revised CC: One First AC, One AC-2 Tier, Two AC-3 Tier, 8 Sleeper Class, 6 General second class including 2 Guards Brake Van
Mon Sep 11, 2023 (12:41PM)
🔹Due to the extension work of Platform no. 10/11 and 12/13 of Chhatrapati Shivaji Maharaj Terminus Main line station, this train has been Short Terminated at Dadar station (CR) from 23.04.2023 to 30.09.2023.
Tue Apr 25, 2023 (02:12AM)
Train will run with one second class seating coach reduced in their composition from 13.1.2022 to 24.2.2022
Sun Jan 09, 2022 (04:55PM)
📢⚟ JCF 21.10.2021 to 24.10.2021 is cancelled due to NI work.
Sat Oct 09, 2021 (08:27PM)
0 Follows
Rating: 4.0/5 (18 votes)
cleanliness - excellent (3)
punctuality - excellent (3)
food - poor (3)
ticket avbl - good (3)
u/r coach - average (3)
railfanning - good (3)
safety - excellent (3)
Bedroll/Linen: Don't know change
Inaugural Run
Thu Apr 27, 2017
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✕ E-Catering
ICF-CBC Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GN
  3
 GN
  4
 H1
  5
 A1
  6
 B1
  7
 B2
  8
 S1
  9
 S2
 18
SLR
 17
 GN
 16
 GN
 15
 S8
 14
 S7
 13
 S6
 12
 S5
 11
 S4
 10
 S3
RSA - Rake Sharing
RSA With ☆ 22107/22108 ☆ 2 Rakes ☆ PM @MZN ☆




Show ALL intermediate Stations

13 halts. 129 intermediate Stations between Bidar and Mumbai CSM Terminus
#1
0.0 km
/--/
Zone: SCR
PF# 1
Speed: 75
Elev: 669m

19:50
Day: 1
37.4 km
2 intermediate stations
00:30
#2
37.4 km
/--/
Zone: SCR
PF# 1
Speed: 86
Elev: 607m
20:20
20:21
Day: 1
43.2 km
2 intermediate stations
00:30
#3
80.6 km
/--/
Zone: SCR
Speed: 48
Elev: 646m
20:51
20:52
Day: 1
32.8 km
5 intermediate stations
00:41
#4
113.5 km
/--/
Zone: SCR
PF# 3
Speed: 40
Elev: 639m
21:33
21:35
Day: 1
33.0 km
2 intermediate stations
00:50
#5
146.4 km
/--/
Zone: CR
PF# 1
Speed: 75
Elev: 618m
22:25
22:30
Day: 1
Remote Location Quota Starting and Charting Station
79.1 km
9 intermediate stations
01:03
#6
225.5 km
/--/
Zone: CR
PF# 1
Speed: 65
Elev: 679m
23:33
23:35
Day: 1
36.0 km
2 intermediate stations
00:33
#7
261.5 km
/--/
Zone: CR
PF# 1
Speed: 41
Elev: 510m
00:08
00:10
Day: 2
37.3 km
4 intermediate stations
00:55
#8
298.8 km
/--/
Zone: CR
PF# 3,4
Speed: 68
Elev: 511m
01:05
01:10
Day: 2
108.2 km
12 intermediate stations
01:35
#9
407.0 km
/==/
Zone: CR
PF# 1,2
Speed: 60
Elev: 515m
02:45
02:50
Day: 2
75.5 km
15 intermediate stations
01:15
#10
482.4 km
/==/
Zone: CR
PF# 2
Speed: 56
Elev: 560m
04:05
04:10
Day: 2
Remote Location Quota Starting and Charting Station
91.5 km
23 intermediate stations
01:38
#11
573.9 km
/==/
Zone: CR
PF# 2
Speed: 59
Elev: 52m
05:48
05:50
Day: 2
46.5 km
9 intermediate stations
00:47
#12
620.5 km
/==/
Zone: CR
PF# 7
Speed: 47
Elev: 9m
06:37
06:40
Day: 2
20.2 km
10 intermediate stations
00:21
#13
640.7 km
/==/
Zone: CR
PF# 6
Speed: 73
Elev: 7m
07:01
07:02
Day: 2
24.3 km
12 intermediate stations
00:20
#14
665.0 km
/==/
Zone: CR
PF# 12
Speed: 18
Elev: 7m
07:22
07:25
Day: 2
Xing with 10103/Mandovi Express | Sun,Mon,Fri
9.0 km
9 intermediate stations
00:30
#15
674.0 km
/==/
Zone: CR
PF# 13

Elev: 14m
07:55

Day: 2


Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy