रेलफैनों को आता है ज़िन्दगी का मज़ा लेना

Search Trains
Post PNR
Large TB;
Entry# 1831157-0
Medium; Side View; Small TB; 3 AC; Outside of Train; Standing at Station; Standing;
Entry# 3969365-0


Availability Calendar
Search LTT to KYQ
Return# 22512
PDF Download

15611⇒22511/Mumbai LTT - Kamakhya Karmabhoomi Express (PT)
मुंबई लोकमान्य तिलक टर्मिनस - कामाख्या कर्मभूमि एक्सप्रेस

LTT/Mumbai LTT --> KYQ/Kamakhya Junction

Updated: Feb 07 (21:56) by Krishpatil12859^~
Feb 07 (21:56)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between LTT and KYQ is 394 km (13%) shorter.
Travel Time: 50h 15m     25 halts
Distance: 2953 km     Avg Speed: 59 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 13:15
LTT/Mumbai LTT 
Platform# 2
 
 
Tue
 
 
 
 
Arrives @ 15:30 +2 nights
KYQ/Kamakhya Jn 
Platform# 4
 
 
 
 
Thu
 
 
Type: SuperFast
Rake Zone: NFR/Northeast Frontier
Latest News
(You need to double-check/verify this info yourself)
▪️ Departure from LTT on 06.08.24, 13.08.24 & 20.08.24 will be diverted via Bhusaval - Itarsi - New Katni Jn - Asansol - Bardhamman
Sat Aug 03, 2024 (01:05PM)
News History
▪️ Departure from LTT on 30.07.24 is diverted via Rourkela - Nuagaon - Hatia - Muri - Chandil - Tatanagar
Tue Jul 30, 2024 (03:58PM)
Due to 3rd LINE Pre Ni & NI WORK BETWEEN MURARAI & CHATRA, 22511 Up LTT-KYQ Exp (JCO 12.12.2023 & 19.12.2023) will be diverted via Bandel-Katwa-Jangipur with stoppages at Bandel, Nabadwip, Katwa, Azimganj, Jangipur.
Sat Dec 09, 2023 (12:28PM)
▪️ Departure from LTT on 03.10.23 & 17.10.23 is cancelled
Thu Sep 28, 2023 (12:00AM)
▪️ Departure from LTT on 19.09.23 is cancelled
Mon Sep 18, 2023 (10:11PM)
▪️ Departure from LTT on 09.05.23 is diverted via Sarona - Ukura
Fri May 05, 2023 (01:14AM)
JCO 04.04.2023 is diverted via Rourkela-Ranchi-Bokaro Steel City-Adra-Medinipur-Kharagpur
Tue Apr 04, 2023 (06:36PM)
▪️ Departure from LTT on 21.02.23 is diverted via Ib - Jharsuguda Road - Sambalpur City - Angul - Bhadrak - Khargapur
Wed Feb 22, 2023 (01:41PM)
▪️22511 LTT-Kamakhya Express JCO 15.11.2022, 22.11.2022, 29.11.2022, 6.12.2022 and 13.12.2022 will short originate from Thane.▪️JCO on 15.11.22 is cancelled
Fri Nov 11, 2022 (02:04AM)
22511 LTT-Kamakhya Express JCO 15.11.2022, 22.11.2022, 29.11.2022, 6.12.2022 and 13.12.2022 will short originate from Thane.
Wed Nov 09, 2022 (02:57PM)
▪️ Departure from LTT on 27.09.22 is cancelled
Wed Sep 21, 2022 (11:13PM)
Due to Pre/Non Interlocking work at Kachewani station in connection with Raj Nandgaon-Kalumna 3rd line work of Nagpur division in South East Central Railway the following train service will be Cancelled. Train No. 22511 Lokmanya Tilak (T)-Kamakhya Karmabhoomi Express scheduled to leave on 06-09-2022 will remain cancelled.
Tue Aug 30, 2022 (08:34PM)
Due to Pre-Non Interlocking & Non Interlocking work for 4th line connectivity at Himgir station in Raigarh - Jharsuguda Jn. Section from 21-08-2022 to 29-08-2022, the following train services will be Cancelled.Train No 22511 Lokmanya Tilak (T) - Kamakhya Karmabhoomi Express scheduled to leave from Lokmanya Tilak (T) on 23 08-2022...
more...
& 30-08-2022 will remain cancelled.
Thu Aug 18, 2022 (10:24PM)
JCO 26.07.2022 will be diverted via NBQ - RNY - KYQ.
Tue Jul 26, 2022 (08:11PM)
Restoration of Unreserved Booking in this Train will start W.E.F 05/07/2022
Sat Jun 25, 2022 (05:20PM)
........
Wed Mar 02, 2022 (02:05AM)
⚠️Cancellation Alert⚠️ 22511 Mumbai LTT - Kamakhya Karmabhoomi is Cancelled on 01.03.2022 Due to work of infrastructure upgrade on Rangiya Division of Northeast Frontier Railway (NFR).
Tue Mar 01, 2022 (07:54AM)
दिनांक 28.12.2021 को निरस्त रहेगी।
Thu Dec 23, 2021 (09:53AM)
-
Wed Dec 22, 2021 (08:09PM)
JCO 07.12.2021 fully cancelled
Fri Dec 03, 2021 (09:12AM)
JCO 24/8/21 will be diverted via Rangiya due to Derailment of 02346 at Chaygaon
Wed Aug 25, 2021 (10:43PM)
4 Follows
Rating: 4.2/5 (48 votes)
cleanliness - good (9)
punctuality - excellent (8)
food - good (8)
ticket avbl - good (7)
u/r coach - good (3)
railfanning - excellent (8)
safety - good (8)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Fri Dec 24, 2010
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering at Lokmanyatilak, Kalyan,Manmad, Bhusaval,Akola , Bilaspur,Jharsuguda,Rourkela,Kharagpur, Howrah,New Bongaigaon
LHB Rake

Rake/Coach Position

  0
  L
  1
HCP
  2
EOG
  3
 GS
  4
 GS
  5
 S7
  6
 S6
  7
 S5
  8
 S4
  9
 S3
 18
 B3
 17
 B4
 16
 B5
 15
 B6
 14
 A1
 13
 A2
 12
 PC
 11
 S1
 10
 S2
 19
 B2
 20
 B1
 21
 GS
 22
 GS
 23
SLR
RSA - Rake Sharing
No RSA. Single Dedicated Rake. CDO - KYQ.

Show ALL intermediate Stations

TT has CHANGED. Updated: Feb 07 (21:56)
Compare with Old TT
25 halts. 505 intermediate Stations between Mumbai LTT and Kamakhya Junction
#1
0.0 km
/==/
Zone: CR
PF# 2
Speed: 56
Elev: 6m

13:15
Day: 1
34.6 km
18 intermediate stations
00:37
#2
34.6 km
/==/
Zone: CR
PF# 4
Speed: 67
Elev: 9m
13:52
13:55
Day: 1
205.2 km
30 intermediate stations
03:05
#3
239.7 km
/==/
Zone: CR
PF# 2
Speed: 75
Elev: 558m
17:00
17:02
Day: 1
184.1 km
22 intermediate stations
02:28
#4
423.9 km
/==/
Zone: CR
PF# 6,7
Speed: 80
Elev: 205m
19:30
19:35
Day: 1
Remote Location Quota Starting and Charting Station
139.5 km
20 intermediate stations
01:44
#5
563.3 km
/==/
Zone: CR
PF# 2
Speed: 64
Elev: 279m
21:19
21:22
Day: 1
253.0 km
38 intermediate stations
03:58
#6
816.3 km
%≡≡%
Zone: CR
PF# 3
Speed: 75
Elev: 309m
01:20
01:25
Day: 2
Remote Location Quota Starting and Charting Station
129.6 km
16 intermediate stations
01:35
#7
946.0 km
%≡≡%
Zone: SECR
PF# 4
Speed: 64
Elev: 311m
03:00
03:02
Day: 2
171.9 km
33 intermediate stations
02:41
#8
1117.9 km
/==/
Zone: SECR
PF# 5
Speed: 65
Elev: 315m
05:43
05:48
Day: 2
Remote Location Quota Starting and Charting Station
110.8 km
19 intermediate stations
01:42
#9
1228.7 km
/==/
Zone: SECR
PF# 1
Speed: 85
Elev: 292m
07:30
07:45
Day: 2
132.4 km
18 intermediate stations
01:33
#10
1361.1 km
%≡≡%
Zone: SECR
PF# 1
Speed: 55
Elev: 218m
09:18
09:20
Day: 2
71.6 km
9 intermediate stations
01:18
#11
1432.7 km
/==/
Zone: SER
PF# 2
Speed: 84
Elev: 231m
10:38
10:40
Day: 2
101.1 km
15 intermediate stations
01:12
#12
1533.9 km
/==/
Zone: SER
PF# 4
Speed: 71
Elev: 218m
11:52
12:00
Day: 2
Overtaken by 15027/Maurya Express | Wed
101.0 km
15 intermediate stations
01:25
#13
1634.9 km
/==/
Zone: SER
Speed: 75
Elev: 234m
13:25
13:30
Day: 2
62.1 km
8 intermediate stations
00:50
#14
1697.0 km
%≡≡%
Zone: SER
PF# 4
Speed: 64
Elev: 159m
14:20
14:25
Day: 2
Remote Location Quota Starting and Charting Station
133.8 km
20 intermediate stations
02:05
#15
1830.8 km
/==/
Zone: SER
PF# 6
Speed: 45
Elev: 39m
16:30
16:35
Day: 2
118.5 km
35 intermediate stations
02:38
#16
1949.3 km
/==/
Zone: ER
PF# 2
Speed: 92
Elev: 37m
19:13
19:15
Day: 2
79.8 km
25 intermediate stations
00:52
#17
2029.2 km
/==/
Zone: ER
PF# 1,2
Speed: 74
Elev: 36m
20:07
20:09
Day: 2
51.9 km
8 intermediate stations
00:42
#18
2081.1 km
/==/
Zone: ER
PF# 1
Speed: 70
Elev: 50m
20:51
20:53
Day: 2
60.5 km
8 intermediate stations
00:52
#19
2141.6 km
/==/
Zone: ER
PF# 2
Speed: 74
Elev: 143m
21:45
21:47
Day: 2
52.7 km
8 intermediate stations
00:43
#20
2194.3 km
/==/
Zone: ER
PF# 1
Speed: 29
Elev: 37m
22:30
22:32
Day: 2
Xing with 13154/Gour Express | Wed
71.3 km
14 intermediate stations
02:28
#21
2265.5 km
/==/
Zone: ER
PF# 4
Speed: 64
Elev: 31m
01:00
01:10
Day: 3
235.1 km
43 intermediate stations
03:40
#22
2500.6 km
/==/
Zone: NFR
PF# 1
Speed: 8
Elev: 114m
04:50
05:00
Day: 3
7.3 km
1 intermediate stations
00:53
#23
2507.9 km
/--/
Zone: NFR
PF# 3
Speed: 50
Elev: 119m
05:53
05:55
Day: 3
126.3 km
19 intermediate stations
02:33
#24
2634.1 km
/--/
Zone: NFR
PF# 2
Speed: 46
Elev: 123m
08:28
08:30
Day: 3
34.6 km
5 intermediate stations
00:45
#25
2668.8 km
/--/
Zone: NFR
PF# 2
Speed: 47
Elev: 50m
09:15
09:20
Day: 3
108.9 km
16 intermediate stations
02:20
#26
2777.7 km
/==/
Zone: NFR
PF# 1A,1B
Speed: 44
Elev: 60m
11:40
11:45
Day: 3
Traction changes from Electric to Diesel
175.5 km
17 intermediate stations
03:45
#27
2953.2 km
%==%
Zone: NFR
PF# 4

Elev: 56m
15:30

Day: 3
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy