Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

FmT LIVE - Follow my Trip with me... LIVE

The purest enjoyment of life - be a RailFan.

Search Trains
Post PNR
Medium; Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 5217438-0
Side View; Small TB; 3 AC; Outside of Train; Standing at Station;
Entry# 5310291-0


Availability Calendar
Search LTT to SHM
Return# 12102
PDF Download

12101/Jnaneswari Express (PT)
Other Names: Super Deluxe AC Express
ज्ञानेश्वरी एक्सप्रेस

LTT/Lokmanya Tilak Terminus --> SHM/Shalimar (Kolkata)

Updated: Oct 02 2022 (11:09) by PiyushSrivastava^~
Oct 02 2022 (11:09)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips
Other Trains in the News
The Shortest Route between LTT and SHM is 2 km (0%) shorter.
Travel Time: 30h 45m     18 halts
Distance: 1943 km     Avg Speed: 63 km/hr
Max Permissible Speed: 130 km/hr
Departs @ 20:35
Lokmanya Tilak Terminus/LTT 
Platform# 3
 
Mon
Tue
 
 
Fri
Sat
Arrives @ 03:20 +2 nights
SHM/Shalimar 
Platform# --
Sun
Mon
 
Wed
Thu
 
 
Type: SuperFast
Rake Zone: CR/Central
Latest News
(You need to double-check/verify this info yourself)
▪️ Departure from LTT on 08.05.23 will be diverted via Sarona - Ukura
Fri May 05, 2023 (01:20AM)
News History
JCO 07/04/23 and 08/04/23 are Cancelled.
Fri Apr 07, 2023 (02:31PM)
JCO 07.04.2023 is cancelled
Fri Apr 07, 2023 (02:27PM)
JCO 04.04.2023 is diverted via Tatanagar-Chandil-Purulia-Bokaro Steel City-Talgaria-Adra-Kharagpur
Wed Apr 05, 2023 (06:06PM)
▪️ Cancelled on 25.02.23 . Due to non-availablity of rake inconvenience cause is regretted.
Sat Feb 25, 2023 (02:42PM)
• JCO 13.01.2023 to 14.01.2023 will terminate at Howrah instead of Shalimar due to Developmental work at Shalimar Station.
Wed Jan 11, 2023 (06:59PM)
▪️ Departure from LTT on 30.08.22 , 02.09.22, 03.09.22 is cancelled.
Wed Aug 31, 2022 (12:03AM)
JOC cancelled from 06.08.2022, 08.08.2022 & 09.08.2022
Fri Aug 05, 2022 (11:32PM)
▪️ Restoration of Unreserved Booking in this Train will start W.E.F 01/07/2022
Wed May 04, 2022 (03:37PM)
Will be short terminated at Santragachi for JCO 20.09.2021
Tue Sep 21, 2021 (10:03PM)
2 Follows
Rating: 4.4/5 (414 votes)
cleanliness - good (71)
punctuality - excellent (71)
food - good (69)
ticket avbl - good (67)
u/r coach - good (39)
railfanning - excellent (70)
safety - excellent (66)
Bedroll/Linen: AVAILABLE change
Inaugural Run
Mon Aug 17, 1998
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
• Cost of Tea - ₹10 & Cost of Coffee (Nescafe)...
more...
- ₹20.; • Veg, Egg & Chicken Biryani as well as Normal Veg, Chicken & Egg Thali is also Available for Lunch & Dinner; • Veg Cutlet & Bread is Available for Breakfast & Evening Snacks at cost of ₹40.
LHB Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 S1
  4
 S2
  5
 S3
  6
 S4
  7
 S5
  8
 S6
  9
 S7
 18
 A1
 17
 B6
 16
 B5
 15
 B4
 14
 B3
 13
 B2
 12
 B1
 11
 PC
 10
 S8
 19
 A2
 20
 H1
 21
 GS
 22
EOG

Show ALL intermediate Stations

18 halts. 326 intermediate Stations between Lokmanya Tilak Terminus and Shalimar (Kolkata)
#1
0.0 km
/==/
Zone: CR
PF# 3
Speed: 57
Elev: 6m

20:35
Day: 1
34.6 km
18 intermediate stations
00:37
#2
34.6 km
/==/
Zone: CR
PF# 4
Speed: 60
Elev: 9m
21:12
21:15
Day: 1
Xing with 12533/Pushpak Express | Mon,Tue,Fri,Sat
67.4 km
10 intermediate stations
01:07
#3
102.0 km
/==/
Zone: CR
PF# 1
Speed: 30
Elev: 308m
22:22
22:25
Day: 1
Technical Halt Bankers Attached
14.2 km
3 intermediate stations
00:28
#4
116.1 km
/==/
Zone: CR
PF# 1,2
Speed: 75
Elev: 599m
22:53
22:55
Day: 1
Technical Halt Bankers Detached
307.7 km
38 intermediate stations
04:05
#5
423.9 km
/==/
Zone: CR
PF# 4
Speed: 73
Elev: 205m
03:00
03:05
Day: 2
139.5 km
20 intermediate stations
01:55
#6
563.3 km
/==/
Zone: CR
PF# 2
Speed: 54
Elev: 279m
05:00
05:05
Day: 2
79.0 km
11 intermediate stations
01:27
#7
642.3 km
/==/
Zone: CR
PF# 2
Speed: 58
Elev: 301m
06:32
06:35
Day: 2
174.0 km
26 intermediate stations
03:00
#8
816.3 km
/==/
Zone: CR
PF# 1
Speed: 62
Elev: 309m
09:35
09:40
Day: 2
Remote Location Quota Starting and Charting Station
129.6 km
15 intermediate stations
01:47
#9
946.0 km
%≡≡%
Zone: SECR
PF# 4
Speed: 77
Elev: 311m
11:27
11:29
Day: 2
104.4 km
11 intermediate stations
01:21
#10
1050.4 km
/==/
Zone: SECR
PF# 1
Speed: 42
Elev: 314m
12:50
12:52
Day: 2
30.4 km
3 intermediate stations
00:43
#11
1080.8 km
/==/
Zone: SECR
PF# 2
Speed: 67
Elev: 317m
13:35
13:40
Day: 2
37.1 km
17 intermediate stations
00:35
#12
1117.9 km
/==/
Zone: SECR
PF# 5
Speed: 60
Elev: 315m
14:15
14:20
Day: 2
Remote Location Quota Starting and Charting Station
Xing with 15231/Barauni - Gondia Express | Sun,Tue,Wed,Sat
110.8 km
19 intermediate stations
01:50
#13
1228.7 km
/==/
Zone: SECR
PF# 1
Speed: 72
Elev: 292m
16:10
16:25
Day: 2
204.0 km
28 intermediate stations
02:50
#14
1432.7 km
/==/
Zone: SER
PF# 2
Speed: 83
Elev: 231m
19:15
19:17
Day: 2
101.1 km
15 intermediate stations
01:13
#15
1533.8 km
/==/
Zone: SER
PF# 5
Speed: 71
Elev: 218m
20:30
20:38
Day: 2
Remote Location Quota Starting and Charting Station
101.0 km
15 intermediate stations
01:25
#16
1634.9 km
/==/
Zone: SER
PF# 2
Speed: 75
Elev: 234m
22:03
22:08
Day: 2
62.1 km
8 intermediate stations
00:50
#17
1697.0 km
%≡≡%
Zone: SER
PF# 4
Speed: 62
Elev: 159m
22:58
23:05
Day: 2
133.8 km
20 intermediate stations
02:10
#18
1830.8 km
/==/
Zone: SER
PF# 6
Speed: 69
Elev: 39m
01:15
01:20
Day: 3
Xing with 12834/Howrah - Ahmedabad SF Express | Sun,Mon,Wed,Thu
107.6 km
30 intermediate stations
01:34
#19
1938.5 km
/==/
Zone: SER
Speed: 12
Elev: 5m
02:54
02:56
Day: 3
4.7 km
1 intermediate stations
00:24
#20
1943.2 km
/==/
Zone: SER

Elev: 5m
03:20

Day: 3
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy