Full Site Search  
Sun Jan 21, 2018 11:57:47 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
Refresh Live Status (not updated)
 
 

56861/Villupuram - Puducherry Passenger (UnReserved)
விழுப்புரம்-புதுச்சேரி பாசஞ்சர்     विलुप्पुरम - पुदुच्चेरी पैसेंजर

VM/Villupuram Junction --> PDY/Puducherry (Pondicherry)

Updated: Nov 01 2017 (11:11) by Solo™^~
Nov 01 2017 (11:11)
Other Trains in the News
This is the Shortest Route between VM and PDY.
Travel Time: 0h 50m     3 halts
Distance: 38 km     Avg Speed: 45 km/hr
Max Permissible Speed: n/a
Departs @ 06:55
(Avg 3m late)
Villupuram Junction/VM 
Platform# 4
SMTWTFS
Arrives @ 07:45
(Avg 2m late)
Puducherry (Pondicherry)/PDY 
Platform# 2
SMTWTFS
Type: Passenger
Rake Zone: SR/Southern
Latest News
(You need to double-check/verify this info yourself)
Rating: /5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
u/r coach - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✕ E-Catering
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 UR
  3
 UR
  4
 UR
  5
 UR
  6
 UR
  7
 UR
  8
 UR
  9
SLR

Show ALL intermediate Stations

No Change in Time-Table. Show OLD Time-Table
#1
/--/

0.0 km
VM» Villupuram Junction»   Zone: SR
PF# 4   Day: 1   Spd: 90   Elev: 45m

06:55 +3
9.0 km0 intermediate stations00:06
#2
/--/

9.0 km
VRA Valavanur   Zone: SR
1   Day: 1   Spd: 86   Elev: 37m
07:01 +3
07:02 +3
12.9 km0 intermediate stations00:09
#3
/--/

21.9 km
CBU Chinna Babu Samudram   Zone: SR
1   Day: 1   Spd: 81   Elev: 23m
07:11 +9
07:12 +10
8.1 km0 intermediate stations00:06
#4
/--/

30.0 km
VI Villianur   Zone: SR
1   Day: 1   Spd: 17   Elev: 14m
07:18 +10
07:19 +10
7.5 km0 intermediate stations00:26
#5
/--/

37.6 km
PDY• Puducherry (Pondicherry)•   Zone: SR
PF# 2   Day: 1     Elev: 6m
07:45 +2
Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.