Search Forum
Filters:
Today (08:00) 12623/MGR Chennai Central - Thiruvananthapuram Central Mail (PT) | MAS/MGR Chennai Central (12 PFs)
sivaprakashofficial^~
sivaprakashofficial^~ 6207 blog posts1 Posts
Good. This is how 130 kmph upgradation works in SR. Much appreciated move.
Same with SCR many trains slowed in Oct 2023 inspite of 130kmph in all major sections. 130kmph speed upgradation is only on paper and not in implementation, applicable only to Vande Bharat.
actually between MAS and CBE if you see it is been speeded up comparatively. till TCR it was speeded up by 5 mts if you compare with old TT. so slow down is beyond TCR i guess.
They have just advanced the departure by 15 minutes. Running time has increased after CBE. No use of 130 anyway.
no use of 130 is very much evident from the TTs in that stretch only.
Yesterday (22:46) 12204/Amritsar - Saharsa Garib Rath Express (PT)
Adityashivhare
Adityashivhare 194 blog postsApr 28 (21:46) 18233/Narmada Express (PT) | UJN/Ujjain Junction (8 PFs)
Adityashivhare
Adityashivhare 194 blog postsConstruction of two new platform at ujjain railway station. As what I can see.
Anyone has any info about construction. Is it platform or stabbling line etc.
Anyone has any info about construction. Is it platform or stabbling line etc.
Today (08:16) 16526/KSR Bengaluru - Kanniyakumari Express (PT) | SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)
sivaprakashofficial^~
sivaprakashofficial^~ 6207 blog posts10 Posts
when there are worser RSAs like ASR CSMT MAS, coromandel - mail RSA, cant help. even cholan - pandiyan RSA is not good RSA i d say.
I dont even like CSMT-MS-SA RSA. SA is a divn. HQ but it has no pitline. CAPE and NCJ are being neglected. They are just a dumpyard for long distance trains. CAPE should have got atleast two pitlines to decongest NCJ. That section hould be taken within MDU divn. PGT is a divn. HQ but no pitline. This is the plight of SR.
basically the reason for these stuff is lack of proper infra or underutilisation of existing infra like TEN which has 3 pitlines. KGQ and CAN are potential places for constructing pitlines, even there are many other examples like salem.
Today (12:02) 20706/Mumbai CSMT - Jalna Vande Bharat Express | AWB/Aurangabad (5 PFs)
hrid22~
hrid22~ 12901 blog postsHeres The Revenue Generated By Csmt J Vande Bharat From Dec 2023 To Feb 2024
The total AVG passenger count per trip is 290 travellers which is only 60%. IR need to schedule the train at right time zone which is convenient to travellers and not to IR fancy, this would be the result.