Search Forum
Blog Entry# 1045367
Posted: Apr 03 2014 (19:44)
2 Responses
Last Response: Apr 03 2014 (19:45)
2 Responses
Last Response: Apr 03 2014 (19:45)
New Facilities/Technology
CMRL/Chennai Metro
MSRINIVASANME~ 1141 news posts
Chennai Metro conducts trial run of the emergency engine.
CHENNAI METRO TRIAL RUN OF THE EMERGENCY ENGINE
CHENNAI METRO TRIAL RUN OF THE EMERGENCY ENGINE
Also in this page ,ICF record production achievement in 2013-14.
Also another news of all the Chennai Beach to Tambaram sub-urban EMU and Beach to Thirumalpur ( via Chengalpattu ) EMU are augmented by 3 extra coaches from the existing 9 car to 12 car EMU trains.Passenger capacity are increased considerably.
Also another news of all the Chennai Beach to Tambaram sub-urban EMU and Beach to Thirumalpur ( via Chengalpattu ) EMU are augmented by 3 extra coaches from the existing 9 car to 12 car EMU trains.Passenger capacity are increased considerably.