Jun 18 2014 (16:37) SA/Salem Junction (6 PFs)
SubawaranaKohilan^~
SubawaranaKohilan^~ 7822 blog postsJn is Struggling to Manage the Trains Between 11.30-15.30 As Trains Come From all Directions,
All PFs should be connected with all lines, to avoid these Struggling.
All trains to KRR via ED Should be Diverted via NMKL
All PFs should be connected with all lines, to avoid these Struggling.
All trains to KRR via ED Should be Diverted via NMKL
3 Posts
Not only MYS-MV
SBC-KIK Passenger, KRR-SA, CBE-SA, SA-METTUR, Much more Trains Wait for Signals outside
SBC-KIK Passenger, KRR-SA, CBE-SA, SA-METTUR, Much more Trains Wait for Signals outside
This Trains Should be Routed via NMKL
Dadar-Ten-Dadar Tri weekly Bcoz There are other Trains to DR
Vsg-Vlkn-Vsg Weekly Bcoz ED has connected with KIK & MAO by other Train
Himsagar Exp Slip Route via NMKL
MYS-TN...
more...
Dadar-Ten-Dadar Tri weekly Bcoz There are other Trains to DR
Vsg-Vlkn-Vsg Weekly Bcoz ED has connected with KIK & MAO by other Train
Himsagar Exp Slip Route via NMKL
MYS-TN...
more...