Search Forum
Blog Entry# 1278073
Posted: Nov 16 2014 (12:09)
10 Responses
Last Response: Nov 16 2014 (13:49)
10 Responses
Last Response: Nov 16 2014 (13:49)
Nov 16 2014 (12:09) 14887X/Kalka - Barmer Express | GOTN/Gotan (2 PFs)
Rang De Basanti^
Rang De Basanti^ 58957 blog posts*********MOMENTS OF A RAILMAN*******
This is how a railman was captured during checking the rail clamps....
snap 1.......from work, he gets up indicating a train is to pass thro the line he is working on
snap 2...sits aside by the track waiting for train to pass thro'
;...
more...
This is how a railman was captured during checking the rail clamps....
snap 1.......from work, he gets up indicating a train is to pass thro the line he is working on
snap 2...sits aside by the track waiting for train to pass thro'
;...
more...
9 Public Posts - Sun Nov 16, 2014
I heard anaconda produced lot of heat due to continous running and cause lot of wear and tear to tracks.
In JU div, track renewal has been done at various places in past 3 years and heavy rails have been laid especially for pythons ( 60 kg I think )
Now IR is experimenting with more heavy rails for DFC.
In JU div, track renewal has been done at various places in past 3 years and heavy rails have been laid especially for pythons ( 60 kg I think )
Now IR is experimenting with more heavy rails for DFC.