Search Forum
Blog Entry# 1306944
Posted: Dec 13 2014 (21:19)
3 Responses
Last Response: Jun 09 2016 (12:31)
3 Responses
Last Response: Jun 09 2016 (12:31)
Path connecting platform 4 and platform 3 at the western end of the station. It is used as an alternative to the overhead walkway. Photo taken from Platform 3.
Note: It goes without saying that the overhead walkway is a safer option. If you really must use this path, keep an eye out for trains and locos. There's more traffic than usual of the latter kind as there is a diesel shed at KJM.
Note: It goes without saying that the overhead walkway is a safer option. If you really must use this path, keep an eye out for trains and locos. There's more traffic than usual of the latter kind as there is a diesel shed at KJM.
Useful.
However,is it not very unsafe for passengers to use this path,as there will be passing trains/locos?
However,is it not very unsafe for passengers to use this path,as there will be passing trains/locos?
Also halting trains stop before this connecting path. As a result few of the coaches at the rear are out of the platform.