Full Site Search  
Fri Mar 24, 2017 09:58:21 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
×
Forum Super Search
Blog Entry#:
Words:

HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

<<prev entry    next entry>>
Blog Entry# 1353272  
Posted: Jan 28 2015 (00:02)

5 Responses
Last Response: Jan 28 2015 (22:58)
  
General Travel
0 Followers
1453 views
Jan 28 2015 (00:02)   12501/Poorvottar Sampark Kranti Express (PT)
 

nobhonil10   1650 blog posts
Entry# 1353272            Tags   Past Edits
1.If this train doesn't get priority in CNB-MGS,why is it not made to run via LKO,SLN,PNBE.samparkrantis are supposed to be second best connection after Rajs.Though this train is having huge number of coaches with 2 HAs,priority is of lowest standards.
2.Still not giving stoppage at NCB is hurting hige prospects for passengers of the region and its catchment areas.Though 90%of times it halts there unofficially.

  
1182 views
Jan 28 2015 (00:28)
Guest: 744fdd3f   show all posts
Re# 1353272-1            Tags   Past Edits
Divert it via katihar-spj-bsb-ljn-mb route..to avoid the congested pnbe-mgs-cnb route.

  
1204 views
Jan 28 2015 (01:48)
Pained to know Boeing 777 landcrashed~   23273 blog posts   21097 correct pred (68% accurate)
Re# 1353272-2            Tags   Past Edits
The priority this train is getting all the way fromBJU to NDLS making it delay uup to 24 hrsI ddon't see any reason of diverting it from Elephant Corridor & putting it on more congested line..when a train already runs 24 hrs late then what's the big deal to delay it further by 2 more hours...Moreover 12501 always departs on time from GHY & APDJ SGUJ line has proved that at day time even thisslowest section jis. Capable to achieve 90 kmph So stoppage @ APDJ can be consider instead of NCB.

  
1067 views
Jan 28 2015 (11:12)
Guest: 744fde0d   show all posts
Re# 1353272-3            Tags   Past Edits
Bro ye section northeast ki trains ke liye develop kiya ja rha hai..almost double line section and in the near future will be totally electrified

  
955 views
Jan 28 2015 (22:53)
nobhonil10   1650 blog posts
Re# 1353272-4            Tags   Past Edits
yup.....the very concept of not giving stoppages doesn't suits as NFR is different and the distribution of crowd is different.Running a SF through EC primarily was not a wise one with restrictions but even if it was run via APDJ,APDJ stoppage should have been there.Changing it to run through NCB-NJP will definitely make it take less time with high priority being given to it but which is obsolete given a huge delay in ECR,NCR.Now when it is run through NCB,its mandatory that stoppage is given to have people avail of its services.It will help a lot of people in its catchment area to have a SF connection after Raj.

  
932 views
Jan 28 2015 (22:58)
nobhonil10   1650 blog posts
Re# 1353272-5            Tags   Past Edits
yup.....the very concept of not giving stoppages doesn't suits as NFR is different and the distribution of crowd is different.Running a SF through EC primarily was not a wise one with restrictions but even if it was run via APDJ,APDJ stoppage should have been there.Changing it to run through NCB-NJP will definitely make it take less time with high priority being given to it but which is obsolete given a huge delay in ECR,NCR.Now when it is run through NCB,its mandatory that stoppage is given to have people avail of its services.It will help a lot of people in its catchment area to have a SF connection after Raj.
Scroll to Top
Scroll to Bottom


Go to Desktop site