I want to clear everyone's misunderstanding about delays of ER trains in ECR.
Since lhb are introduced to raise the mps of trains to 130 kmph but in kiul pnbe stretch in some places there are 52 kg rails which can't support 130kmph speed.So ECR is replacing 52kg rails with 60 kg rails.Theytake mega block almost everyday to replace the rais. Work is going on full swing to finish it as soon as possible.
Places which has 52 kg rails are
koo~Fut...
more...
Since lhb are introduced to raise the mps of trains to 130 kmph but in kiul pnbe stretch in some places there are 52 kg rails which can't support 130kmph speed.So ECR is replacing 52kg rails with 60 kg rails.Theytake mega block almost everyday to replace the rais. Work is going on full swing to finish it as soon as possible.
Places which has 52 kg rails are
koo~Fut...
more...
1 Public Posts - Mon Feb 09, 2015
The most useless section of IR even if they replace 52 kg rails by 60 kg I don't think MPS will increase by 140 kmph...& most of the part of HWH RPH MLDT NJP section already having 60 kg rail do it'd difficult to belive that HWH PNBE main line still not having 60 kg rails....
4 Public Posts - Mon Feb 09, 2015