Search Forum
Blog Entry# 1523119
Posted: Jun 24 2015 (22:26)
2 Responses
Last Response: Jun 25 2015 (00:01)
2 Responses
Last Response: Jun 25 2015 (00:01)
Commentary/Human Interest
Rang De Basanti^ 138872 news posts
If we aspire to shift our man and material shipment on to rail, it is imperative to have structures which foster internalisation of technology purchased.
Prime...
Prime...
read more... Railways: Dream, Design & Make in India: I
Fabulous Sir. The evolution of CLW and Electric Locomotive.
________________/\__________________
Perfect Journalist of IR
Please continue with such "Valuable Stuffs".
Statement about 3 Phase Technology and Loco in this News Article:
"After...
more...
________________/\__________________
Perfect Journalist of IR
Please continue with such "Valuable Stuffs".
Statement about 3 Phase Technology and Loco in this News Article:
"After...
more...
Why 3 Phase technology can't flourish in IR ?
Probably the following statement is the answer:
"It was interesting that while the new technology was being assimilated and the railway engineers were pushing the frontiers in a globally acclaimed effort, in an act of bureaucratic bloodbath, the core design team was disbanded just four years after first locomotive was turned out. The pleas of not letting go the acquired skills were dealt bureaucratically.
The...
more...
Probably the following statement is the answer:
"It was interesting that while the new technology was being assimilated and the railway engineers were pushing the frontiers in a globally acclaimed effort, in an act of bureaucratic bloodbath, the core design team was disbanded just four years after first locomotive was turned out. The pleas of not letting go the acquired skills were dealt bureaucratically.
The...
more...