Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

DC Line - ये आग का दरिया पार कर पाना नहीं था आसान ...पर धनबादवासियों के इरादे हैं चट्टान.... चलाकर रहेंगे इसपर रेल गाड़ी महान... - Niket Karan

Search Forum
<<prev entry    next entry>>
Blog Entry# 1542776
Posted: Jul 16 2015 (22:24)

5 Responses
Last Response: Jul 17 2015 (13:17)
Rail Fanning
5301 views
10

Jul 16 2015 (22:24)   GR/Kalaburagi Junction (Gulbarga) (4 PFs)
 
anvitjoshi^~
anvitjoshi^~   2338 blog posts
Entry# 1542776            Tags   Past Edits
Guntakal - Gulbarga FEDL status as on 13-07-15 :
I was checking the DOWN Line (GR - GTL) and the progress was almost simlilar on UP line as well.
[1] Except for MALM - MTU (11 km) entire stretch is Double.
[2] GTL - NLA (10 km) : Wired.
[3]
...
more...
NLA - NMLU (5 km) : Few ploes are not wired.
[4] NMLU - ASP (17 km): Wired.
[5] ASP - ESV (27 km) : Bottom Hook and bottom wire are not installed.
[6] ESV - KGL (8 km) : 30% of the section is not wired.
[7] KGL - KO (13 km) : Poles erected but hooks are not installed for 50% of the poles.
[8] KO - MALM (13 km) : Poles are not erected at EGU and MALM stations.
[9] MALM - MTU (11 km): Ground is leveled for Double Line. Nothing started on Electrification.
[10] MTU - MRC (7 km) : Poles erected but only 20% hooks are installed.
[11] MRC - RC (10 km) : Poles erected but only 40% hooks are installed.
[12] RC - YDLP (22 km): Wired.
[13] YDLS - KSN (3 km): Poles erected but only 50% hooks are installed.
[14] KSN - WADI (82km): Wired.
[15] WADI - GR (36 km): Poles erected and hooks are installed.

Translate to English
Translate to Hindi

2765 views
0

Jul 17 2015 (09:31)
SunilKulkarni~
SunilKulkarni~   2006 blog posts
Re# 1542776-1              
Thank you for the updates I hope it may take another 1 to 1.5 years to see FEDL on this route
Translate to English
Translate to Hindi

2689 views
0

Jul 17 2015 (11:49)
anvitjoshi^~
anvitjoshi^~   2338 blog posts
Re# 1542776-2              
Yes sir, by 2017 we may see Electric Locos running in this section :)
Translate to English
Translate to Hindi

2803 views
0

Jul 17 2015 (12:06)
12YEARSINIRI^~   11515 blog posts
Re# 1542776-3              
Any updates on Gtl - ynk ?
Translate to English
Translate to Hindi

2796 views
0

Jul 17 2015 (12:18)
anvitjoshi^~
anvitjoshi^~   2338 blog posts
Re# 1542776-4              
It's completely wired. Only power supply is the issue. They are building electric substations en-route, I saw one in Karnataka and one more in Andhra. Hopefully even this stretch will be energized by 2016 end.
SWR missed a gold mine by not asking for any ELS :(
Translate to English
Translate to Hindi

2728 views
0

Jul 17 2015 (13:17)
12YEARSINIRI^~   11515 blog posts
Re# 1542776-5              
It's a definite loss . Els should have been established in sbc .
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy