Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Tamil Nadu Express - தங்களை அன்புடன் வரவேற்கிறது - Swaroop Kutti

Search Forum
<<prev entry    next entry>>
Blog Entry# 1710197
Posted: Jan 13 2016 (22:20)

14 Responses
Last Response: Jan 22 2016 (15:16)
Rail Fanning
14822 views
26

★★★
Jan 13 2016 (22:20)   AGTL/Agartala (3 PFs) | SGUJ/WDP-4D/40096
 
JoydeepRoy
JoydeepRoy   14684 blog posts
Entry# 1710197            Tags   Past Edits
BG TRAIN REACHED AGARTALA, REALLY! HOW MUCH??
It is very sure that, the people of the Tripura State and Barak Valley are extremely delighted that a train again rolled on the tracks of Agartala Station. But what it really means? Toady we tried to measure the outcome of the programme through chatting with several railway people. And that revealed some uncomfortable truth behind the programme.
The lower grade railway officials and some contractors were surprisingly some extent critical towards the programme. They raised some burning points which is worth sharing technically. According to
...
more...
them this programme is just merely a show off, nothing else. As a variety of work in various stations are still pending.
The the train rolled without proper signaling system(which is yet to be installed after this month), platform work is still pending in every station,
Some stations are completely demolished condition (DMR, KXJ etc)
CRS is inspection is even out of talks.
In this condition, today's trial do not mean a unit better result than the loco trial of the day before yesterday. And the programme even worsen the pace of work some extent. Because a large group of railway people and the workers were busy in developing minimum infrastructures for playing of the train (which is will be replaced) for 15-20 days, by-passing the main flow of work.
According to one of them the work has to be completed within the schedule as per contract, but this 15 day loss will surely make impact on the schedule. And if the work is to be completed within schedule quality of the work may be downgraded in some locations.
Besides this kind of problematic views, some of them described the programme as a positive and the proof of high pace of work. The trial of train signals upcoming more good news to the region.
So, all stay excited, but be cautious.
link : click here

Translate to English
Translate to Hindi

1 Public Posts - Wed Jan 13, 2016

2 Public Posts - Thu Jan 14, 2016

9 Public Posts - Fri Jan 15, 2016

4068 views
0

Jan 17 2016 (09:14)
nobhonil10   2412 blog posts
Re# 1710197-13              
They should have already started a Silchar Sealdah exp daily.That practically suffices all the needs and caters to connection with Kolkata,Siliguri,Guwahati...All the important commercial hubs of the region.After 3 months will have the monsoons starting and will not have any services then.
Translate to English
Translate to Hindi

1 Public Posts - Fri Jan 22, 2016
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy