Search Forum
Blog Entry# 1711170
Posted: Jan 14 2016 (22:53)
18 Responses
Last Response: Jan 16 2016 (23:00)
18 Responses
Last Response: Jan 16 2016 (23:00)
Each curve is owned/maintained by two different SW Railway Divisions (Mysuru & Bengaluru)
13 Posts
Once bridge and doubling work completes at Srirangapattana we can expect electrification within a year means 2016 ends.
One line sleeper is white while other is black.....any reason???
The one with white sleeper is the newly laid line for doubling.
Its not new line MYS-Naganahalli was doubled way back, 8kms from MYS I.e 130 to 138 kms